|
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included. |
Hardware | may include screws, masonry anchors, dyna bolts, nuts and bolts, mounting brackets, hinges, filler strips, cover strips, track systems |
Tools and equipment | may includes, screwdrivers, docking saws, ladders, tape measure, power drill, scissors, caulking gun |
Work instructions | includes instructions for the installation of different styles of timber shutters for both internal and external applications |
Site inspection | should be conducted in consultation with customer |
Customer | may include home owners, real estate agents, tenants, body corporate representatives, business owners |
OHS requirements | are to be in accordance with Commonwealth, State or Territory legislation and regulations, organisational safety policies and procedures. Requirements may include the use of personal protective equipment and clothing, fire fighting equipment, First Aid equipment, hazard and risk control and elimination of hazardous materials and substances, manual handling including lifting and carrying. |
Personal protection needs | may include safety glasses, hearing protection, safety boots, sunscreen, hats |
Work order | may include quotations for work, job cards, customer orders |
Work sequence | should cover the steps for installation in a logical order to prevent back tracking |
Work site | work site may include construction sites, single storey and multi-storey dwellings and commercial premises, newly completed buildings |
Protected | may include drop sheets, barriers, cones, signs |
Manufacturer specifications | may be written or verbal specifications |
Tested | within limitations of normal operation |
Waste | may include textiles, metals, hardware, timber, masonry, fibro cement, concrete, treated pine waste removal should be in accordance with workplace practices and environmental legislation covering disposal of industrial waste |
Payment | may include cash, cheque, credit card depending on workplace practices |
Workplace documentation | may include time sheets, customer care cards, work orders, reports |