Assessor Resource

LMFFL3306A
Install resilient sheet to walls

Assessment tool

Version 1.0
Issue Date: April 2024


This unit supports the attainment of skills and knowledge required for competent workplace performance in the wide variety of flooring technology operations. The competency applies to an on site environment and involves application of skills and knowledge at a trade worker level. These skills and knowledge are to be used within the scope of the individual's job and authority.

This unit covers the competency required to install resilient sheet to dry and wet walls.

You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)

Prerequisites

Nil


Employability Skills

This unit contains employability skills.




Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

The Evidence Guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.

Critical aspects for assessment and evidence required to demonstrate competency in this unit

Comply with legislation, regulations, standards, codes of practice and established safe practices and procedures for installing resilient wall coverings

Interpret work order and locate and apply relevant information

Apply safe handling requirements for equipment, products and materials, including use of personal protective equipment

Follow work instructions, operating procedures and inspection practices to:

prevent damage to goods, equipment and products

maintain required production output and product quality

minimise the risk of injury to self and others

Complete a minimum of:

one installation of a wet wall resilient wall covering installation using a horizontal installation system including internal and external corners to walls, the covering of window reveals and sealing to door frames and fittings

one installation of a wet wall resilient wall covering installation using a vertical installation system including internal and external corners to walls, the covering of window reveals and sealing to door frames and fittings

Work effectively with others

Modify activities to cater for variations in workplace contexts and environment

Context of, and specific resources for assessment

The application of competency is to be assessed in the workplace or realistically simulated workplace

Assessment is to occur under standard and authorised work practices, safety requirements and environmental constraints

Assessment of essential underpinning knowledge, other than confirmatory questions, will usually be conducted in an off-site context

Assessment is to comply with relevant regulatory or Australian Standards requirements

The following resources should be made available:

workplace location or simulated workplace

materials and equipment relevant to installing resilient sheet to walls

specifications and work instructions

Method of assessment

Assessment must satisfy the endorsed assessment guidelines of the Furnishing Industry Training Package

Assessment methods must confirm consistency and accuracy of performance (over time and in a range of workplace relevant contexts) together with application of underpinning knowledge

Assessment methods must be by direct observation of tasks and include questioning on underpinning knowledge to ensure its correct interpretation and application

Assessment may be applied under project related conditions (real or simulated) and require evidence of process

Assessment must confirm a reasonable inference that competency is able not only to be satisfied under the particular circumstance, but is able to be transferred to other circumstances

Assessment may be in conjunction with assessment of other units of competency


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assingnment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Required skills

collect, organise and understand information related to work orders, basic plans and safety procedures

communicate ideas and information to enable confirmation of work requirements and specifications, coordination of work with site supervisor, other workers and customers, and the reporting of work outcomes and problems

work with others and in a team by recognising dependencies and using cooperative approaches to optimise work flow and productivity

use pre-checking and inspection techniques to anticipate problems installing resilient wall coverings to avoid re-work and wastage

recognise and respond to circumstances outside instructions or personal competence

plan and organise activities including the preparation and layout of the worksite and the obtaining of equipment and materials to avoid any back tracking, work flow interruptions or wastage

use mathematical ideas and techniques to correctly complete measurements, calculate area and estimate other material requirements

clarify and confirm work instructions

plan work within given task parameters

accept responsibility for given tasks

set, monitor and satisfy personal work goals

satisfy the competency requirements for the job

maintain current knowledge of:

tools and materials

installation techniques

seek learning opportunities

use the limited workplace technology related to installing resilient wall coverings including tools, equipment, calculators and measuring devices.

Required knowledge

State or Territory OHS legislation, regulations, standards and codes of practice relevant to installing resilient sheet to walls

organisational and site standards, requirements, policies and procedures for installing resilient sheet to walls

environmental protection requirements

established communication channels and protocols

problem identification and resolution

types of tools and equipment and procedures for their safe use, operation and maintenance

characteristics of materials, products and defects

set up and operation of equipment

products assembly techniques

procedures for the recording, reporting and maintenance of workplace records and information

appropriate mathematical procedures for estimation and measurement

type, characteristics, uses and limitations of:

weldable resilient wall coverings

resilient wall covering installation adhesives

types and uses of resilient wall covering installation tools and equipment

workplace safety system requirements related to resilient wall covering installation

characteristics and requirements of sub-strate preparation for wall coverings

work flow in relation to fixing, welding and finishing of resilient wall coverings

The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

Legislative requirements

are to be in accordance with applicable legislation from all levels of government that affect organisational operation. Requirements may include but not be limited to award and enterprise agreements, industrial relations, Australian Standards, confidentiality and privacy, OHS, the environment, equal opportunity, anti-discrimination, relevant industry codes of practice, duty of care and heritage

OHS requirements

are to be in accordance with Commonwealth, State or Territory legislation and regulations, organisational safety policies and procedures. Requirements may include but not be limited to the use of personal protective equipment and clothing, fire fighting equipment, First Aid equipment, hazard and risk control and elimination, control of hazardous materials and substances, manual handling including lifting and carrying

Organisational requirements

may include but not be limited to legal, organisational and site guidelines, policies and procedures relating to own role and responsibility, quality assurance, procedural manuals, quality and continuous improvement processes and standards, OHS, emergency and evacuation, ethical standards, recording and reporting, access and equity principles and practices, equipment use, maintenance and storage, environmental management (waste disposal, recycling and re-use guidelines)

Resilient wall coverings

may be:

homogeneous/heterogeneous

linoleum sheet

encapsulated glass fibre

inlaid

rotogravure

Instructions

Workplace procedures relating to the use and operation of tools and equipment

Workplace instructions, including job sheets, plans, drawings and designs

Workplace procedures relating to reporting and communications

Manufacturer instructions for the use of equipment and materials

Adhesives

are to include, but may not be limited to acrylic adhesives and water and solvent based contacts recommended by manufacturers

Tools and equipment

may include flat trowel, notched trowel, pencil cove roller, wall roller, hand roller, cove and corner roller, recess scriber, hook and straight knife, chalk line, spirit level, tape measure, water level, laser level, height gauge, wall trolley, contact bucket/tray/roller brushes, scaffolding and step ladder

Materials

are to include but are not limited to resilient wall coverings, skirting, reducing and edge strips, welding rod, coving accessories, tapes, pattern paper, fillers and adhesives

Feathering systems

are to include the fitment of PVC edge fillet diminishing strip and the use of pre-mixed or mixed cementitious compounds

Welding

is to include rod welding, self welding and fusion

Profiles

are to include internal and external angles, bullnoses, coves and may include profiling to pipe work

Trimmed and finished

is to include trimming weld rod, abrading and fusing external corners and chemically finishing to industry standards and manufacturer specifications

Sealed

is to include the sealing of the resilient wall coverings at door and window frames, pipes, fixtures, fittings and floor coverings

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Applicable legislative, OHS and organisational requirements relevant to installing resilient wall coverings are verified and complied with 
Instructions and/or plans are read and interpreted to identify process required to complete work tasks 
Sub-strate condition is assessed for suitability for installation of resilient coverings to the walls 
Suitable adhesives, trims and accessories are selected 
Tools, equipment and materials are selected and checked prior to use to ensure that they are appropriate for the work, serviceable and in a safe condition 
Sequence of work is planned, including the starting point, to ensure efficiency and quality of installation 
Resilient wall covering to be installed is checked against order 
Resilient wall coverings are acclimatised according to manufacturer recommendations 
Resilient wall coverings for fixing are organised and used in accordance with relevant safety management requirements 
Working lines and starting point are established 
Pre-form fillet is cut and fitted (if required) 
Feathering systems and applications are prepared and applied in accordance with the installation plan 
Resilient wall coverings are laid out to meet directional sequence, pattern match, specification requirements and to minimise waste and joins as appropriate 
The aesthetics of the materials is maximised where appropriate, matching grains, colours and patterns 
Materials are cut to length and size, allowing for final adjustment, trimming and welding processes 
Header and/or perimeter contact adhesive is applied to surfaces 
Adhesive is applied to the body of the walls as specified by the adhesive manufacturer 
Resilient wall covering is positioned in accordance with the plan, pressed out and hand-rolled 
Resilient wall covering is heated to form required profiles 
Seams are prepared and welded in accordance with the plan, manufacturer instructions and industry standards 
Joins and/or seams are trimmed and finished to industry standards 
Resilient wall coverings are sealed to floor coverings, door and window frames, as well as fixtures and fittings in wet area installations 
Completed installation is checked for flaws in installation and materials and faults rectified following workplace procedures 
Unused materials are stored or recycled as required 
Tools and equipment are cleaned and stored appropriately 
Work area is cleaned and rubbish disposed of appropriately 
Workplace documentation and/or reports are completed 

Forms

Assessment Cover Sheet

LMFFL3306A - Install resilient sheet to walls
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

LMFFL3306A - Install resilient sheet to walls

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: