Assessor Resource

LMFFT5010B
Optimise CNC operations

Assessment tool

Version 1.0
Issue Date: March 2024


This unit covers the analysis of production orders, production histories and machine capabilities and the manipulation of machine control programs to optimise production performance.

You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)

Prerequisites

Nil


Employability Skills

This unit contains employability skills.




Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

The Evidence Guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.

Critical aspects of evidence

Locate, interpret and apply relevant information

Apply safety requirements throughout the sequence, including the use of personal protective clothing and equipment

On a minimum of two occasions with at least one involving a CNC Machining and Processing Centre, optimise production, and

Suggest improvements to CNC controlled operations and where authorised, negotiate changes

Modify activities to cater for variations in workplace cultures and environment

Work effectively with others

Resource implications

CNC production equipments, software, production materials and a production plan/schedule

Method of assessment

Assessment methods must confirm consistency or the potential for consistency of performance over time and in a range of workplace relevant contexts.

Assessment should be by direct observation and questioning on underpinning knowledge.

Assessment may be conducted over time and may be in conjunction with assessment of other units of competency

Context of assessment

Assessment may occur on the job or in a workplace simulated facility with relevant process equipment, materials, work instructions and deadlines.


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assingnment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Required skills

collect, organise and understand information related to CNC production optimisation, including the relevant technical, regulatory, environmental and safety requirements

communicate ideas and information to enable clarification of the requirements, coordination of work with site managers, supervisors, and other workers, and the reporting of work outcomes and problems

plan and organise activities, including the obtaining of systems and materials to avoid any backtracking, workflow interruptions or unnecessary systems downtime

work with others and in a team by recognising dependencies and using cooperative approaches to optimise workflow and productivity

use mathematical ideas and techniques to correctly calculate flow and systems parameters

create and apply systematic problem solving techniques to anticipate problems, avoid re-working and wastage

use the full scope and potential workplace technology related to CNC production operations

Required knowledge

company operating procedures, including procedures for programming CNC equipment

operation requirements of equipment and work systems to be programmed

The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

Unit scope

This unit covers the work involved in optimising CNC process and machine control programs used in the furnishing industry. It requires the integration of process machines that may normally function on a stand-alone basis.

The optimisation of CNC programs is undertaken in accordance with established enterprise procedures and practices may include requirements recommended by manufacturers/developers

Production systems

Production systems are to include CNC machining and processing centres

Unit context

OHS requirements include legislation, building codes, material safety management systems, hazardous substances and dangerous goods codes and safe operating procedures

Work is carried out in accordance with legislative obligations, environmental legislation, relevant health regulations, authorised handling procedures and organisation insurance requirements

Work requires individuals to demonstrate analytical and organisational ability, judgement and problem solving skills

Workplace environment

Work is generally performed without other qualified assistance

Customers are normally internal

Personal protective equipment

Personal protective equipment is to include that prescribed under legislation, regulations and enterprise policies and practices

Information and procedures

Enterprise production plans and schedules

CNC and production systems manufacturers' specifications and instructions

Standard form of installing and commissioning CNC programs

Organisation work specifications and requirements

Legislation/regulations/national and industry codes and practices relevant to the installation and commissioning

Quality and Australian standards and procedures

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
The production potential of the components of the system are identified 
Production orders and plans are analysed to identify sustained production requirements 
Integration options are identified and analysed to ascertain the optimal integration model 
Software and programming requirements to attain and sustain optimal integration are identified and recorded 
Program format and operational intent is accurately determined and required applications identified 
Specifications are checked for required operating conditions 
Program instructions are checked for compliance with specifications 
Software timers are set to specification where required 
Appropriate program loading technique is selected 
External loading devices are correctly connected to automatic process machine control systems 
Machine control system is placed in correct operational mode to accept program loading 
Program is downloaded in accordance with manufacturers' recommended procedure and enterprise requirements 
Checks are made during and after downloading to ensure accurate and complete data transfer 
External program loading devices and connections are disconnected from process and machine control system 
Integration protocols and actions are completed 
Operation of the production system using the programs is observed 
Outputs are checked and measured for compliance with specifications 
External inputs are checked for compliance with specifications, according to specified procedures 
Total operation is checked for compliance with specifications where applicable 
Location of program master copy storage is confirmed 

Forms

Assessment Cover Sheet

LMFFT5010B - Optimise CNC operations
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

LMFFT5010B - Optimise CNC operations

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: