|
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included. |
OHS requirements | are to be in accordance with Commonwealth, State or Territory legislation and regulations, organisational safety policies and procedures. Requirements may include but not be limited to the use of personal protective equipment and clothing, fire fighting equipment, first aid equipment, hazard and risk control and elimination of hazardous materials and substances, manual handling including lifting and carrying |
Legislative requirements | are to be in accordance with applicable legislation from all levels of government that affect organisational operation. Requirements may include but not be limited to award and enterprise agreements, industrial relations, Australian Standards, confidentiality and privacy, OHS, the environment, equal opportunity, anti-discrimination, relevant industry codes of practice, duty of care and heritage |
Organisational requirements | may include but not be limited to legal, organisational and site guidelines, policies and procedures relating to own role and responsibility, quality assurance, procedural manuals, quality and continuous improvement processes and standards, OHS, emergency and evacuation, ethical standards, recording and reporting, access and equity principles and practices, equipment use, maintenance and storage, environmental management (waste disposal, recycling and re-use guidelines) |
Project brief | may include but not be limited to client needs and objectives, client aims and objectives and criteria for evaluation, milestones, organisational or personal profiles and aims, image requirements and function, target market, budget, timeline, consultation requirements and colour requirements |
Client | may include but not be limited to suppliers, manufacturers, private clients, colleagues, retailers or the public |
Parameters | may include but not be limited to scope of brief, approval to make changes (legislative and planning), effect or feel trying to be achieved, functionality (short and long term), budget restrictions and established timelines |
Resources | may include but not be limited to computers, computer software, design software, computer aided drafting (CAD) software, colour boards, storyboards, swatches, Pantone Matching System (PMS), journals (directions magazines), artistic equipment and products and model making equipment |
Communication | may include but not be limited to verbal and non-verbal language, constructive feedback, active listening, questioning to clarify and confirm understanding, use of positive, confident and cooperative language, use of language and concepts appropriate to individual social and cultural differences, control of tone of voice and body language |
Relevant personnel | may include but not be limited to interior designer, modeller, texture, animator, programmer, technical director and systems support officer |
Rendering software packages | may include but not be limited to AutoCAD, AutoCAD Revit 9, 3D Studio Max, Form Z, Animator Pro, Rhino, Photoshop, Illustrator and CorelDraw |
Rendering | may include but not be limited to the pictorial representation of plans and elevations using colours, highlighting and shading to provide depth and photo-like drawings |
Equipment and media | may include but not be limited to computer workstation, ergonomic furniture, 3-D animation software, rendering software, render network distribution software, hubs, switches, input device (e.g. stylist tablet, keyboard, mouse), output device (e.g. monitor, TV, printer, speakers) and render farm |
Planning tasks | may include but not be limited to research, production planning, production management, team discussions, lighting, texturing, shading and networking |
Pre-rendering optimisation tasks | may include but not be limited to selection of most appropriate renderer for specific outcome, assessing options with key personnel, deleting any unnecessary geometry and components, preparing renderer attributes, preparing layer or pass control, preparing opacity mattes and alpha channels, testing and diagnosing rendering issues, optimising and refining for best render performance, rendering and organisation of output |
File output format | may include but not be limited to TIFF |