• MEM30014A - Apply basic just in time systems to the reduction of waste

Assessor Resource

MEM30014A
Apply basic just in time systems to the reduction of waste

Assessment tool

Version 1.0
Issue Date: April 2024


This unit applies to all types of manufacturing and engineering environments, most likely in a team setting. All work is carried out under supervision.

Band: 0

Unit Weight: 0

This unit covers reviewing and making continuous improvements to an existing Just in Time (JIT) production system in manufacturing.

You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)

Employability Skills

This unit contains employability skills.




Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.

Overview of assessment

A person who demonstrates competency in this unit must be able to apply basic JIT systems to the reduction of waste.

Critical aspects for assessment and evidence required to demonstrate competency in this unit

Assessors must be satisfied that the candidate can competently and consistently perform all elements of the unit as specified by the criteria, including required knowledge, and be capable of applying the competency in new and different situations and contexts.

Context of and specific resources for assessment

This unit may be assessed on the job, off the job or a combination of both. Where assessment occurs off the job, i.e. the candidate is not in productive work, then an appropriate simulation must be used where the range of conditions reflects realistic workplace situations. The competencies would be demonstrated by an individual working alone or as part of a team. The assessment environment should not disadvantage the candidate.

This unit could be assessed in conjunction with any other units addressing the safety, quality, communication, materials handling, recording and reporting associated with applying basic JIT systems to the reduction of waste or other units requiring the exercise of the skills and knowledge covered by this unit.

Method of assessment

Assessors should gather a range of evidence that is valid, sufficient, current and authentic. Evidence can be gathered through a variety of ways including direct observation, supervisor's reports, project work, samples and questioning. Questioning should not require language, literacy and numeracy skills beyond those required in this unit. The candidate must have access to all tools, equipment, materials and documentation required. The candidate must be permitted to refer to any relevant workplace procedures, product and manufacturing specifications, codes, standards, manuals and reference materials.

Guidance information for assessment


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assingnment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Required skills

Look for evidence that confirms skills in:

analysing

communicating

negotiating

reading/interpreting/following information on written job instructions, specifications, standard operating procedures and other applicable reference documents

planning and sequencing operations

Required knowledge

Look for evidence that confirms knowledge of:

JIT manufacturing philosophy

push and pull systems

Kanbans

work cells

set up time reduction techniques

group technology

ABC analysis of inventory

principles of TQM

principles of TPM

hazards and control measures associated with applying basic JIT systems to the reduction of waste

safe work practices and procedures

The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

Value chain

Includes the entire production system, beginning with the customer, and includes the sales outlet, product design, processing and supply

Waste

Includes activities and results to be eliminated within manufacturing

Categories of waste include excess production and early production, waiting, materials queuing, not moving, people not working, transporting, double handling, poor process design, inventory, stores, buffers, lot sizes, inefficient performance of a process, reaching, bending, exertion, making defective items, rework, rejects, unnecessary inspection

JIT

Includes a production scheduling concept that calls for any item needed at a production operation - whether raw material, finished item, or anything in between, to be produced and available precisely when needed

JIT systems may also be known as part of other manufacturing systems such as lean manufacturing, agile manufacturing or similar

Kanban

Includes a card or sheet used to authorise production or movement of an item

Kanban is typically applied to batch type operations and the production is measured in units produced. In continuous manufacturing organisations, production is measured in terms of production rate

Flow authorisation indicator

May include Kanban bin, ticket or similar, or may be some other indicator of demand pull

Housekeeping principles

Principles of 5S which refer to the five Japanese words seiri, seiton, seison, seiketsu, shitsuke. These words are shorthand expressions for principles of maintaining an effective, efficient workplace:

seiri - eliminating everything not required for the work being performed

seiton - efficient placement and arrangement of equipment and material

seison - tidiness and cleanliness

seiketsu - ongoing, standardised, continually improving seiri, seiton, seison

shitsuke - discipline with leadership

Key measures

May include inventory levels, lead time, delivery, productivity/ production rate, set up time, other measures of pull through the value chain, quality, rework, scrap rates

Pull system refers to a manufacturing planning system based on actual real-time needs from sales or equivalent - i.e. 'make what we sell'

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Value chain members are identified. 
Principles of waste elimination are applied to each step in the value chain. 
Current storage/inventory in value chain is analysed for excesses. 
Production lead time is analysed for all components, sub-assemblies and assemblies subject to JIT including potential for set up time reductions. 
Kanban cards and flow authorisation indicators are analysed for appropriate quantity. 
Workplace layout is analysed for flow and application of housekeeping principles. 
Production process is analysed for excess rework and scrap. 
Key internal stakeholders are liaised with to develop solutions to JIT issues. 
Key external members of the value chain are liaised with to develop solutions to JIT issues. 
Key measures for improvements are determined. 
The plan is referred to a higher authority for approval in accordance with policy and procedures. 
The JIT system/improvements are implemented according to workplace procedures. 
Key measures of JIT are monitored. 
Regular liaison is conducted with key stakeholders seeking areas for improvement. 

Forms

Assessment Cover Sheet

MEM30014A - Apply basic just in time systems to the reduction of waste
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

MEM30014A - Apply basic just in time systems to the reduction of waste

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: