• MSACMS604A - Manage competitive manufacturing processes in a jobbing shop environment

Assessor Resource

MSACMS604A
Manage competitive manufacturing processes in a jobbing shop environment

Assessment tool

Version 1.0
Issue Date: May 2024


This unit applies to the introduction of competitive manufacturing processes in an environment where the enterprise specialises in one off or small batch product or process manufacturing or overhaul of equipment

This unit describes the skills needed to restructure the process, work organisation to allow the application of competitive manufacturing principles.

This unit requires the application of skills associated with problem solving, initiative, enterprise, planning and organising in order to manage competitive manufacturing processes in a jobbing shop environment. This unit also requires communication and teamwork skills to gather information about processes and implement redesign plans.

This unit covers the knowledge and skills required to prepare for, and manage the introduction of, a competitive manufacturing process in a jobbing/batching/contracting manufacturing environment.

You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)

Prerequisites

MSACMS601A

Analyse and map a value chain

MSACMT280A

Undertake root cause analysis

MSACMT631A

Undertake value analysis of product costs in terms of customer requirements


Employability Skills

This unit contains employability skills.




Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

The Evidence Guide describes the underpinning knowledge and skills that must be demonstrated to prove competence. it is essential for assessment and must be read in conjunction with the performance criteria, the range statement and the assessment guidelines of the relevant training package.

Overview of assessment requirements

The person being assessed should be able to demonstrate competency in implementing and managing a competitive manufacturing approach in a jobbing shop environment.

What are the specific resource requirements for this unit?

Access to a jobbing shop implementing competitive manufacturing.

What critical aspects of evidence is required to demonstrate competency in this unit?

Evidence of the move to competitive manufacturing in a jobbing shop should be available

In what context should assessment occur?

Assessment will need to occur in a jobbing shop implementing/wishing to implement a competitive manufacturing strategy

Are there any other units which could or should be assessed with this unit or which relate directly to this unit?

This unit could be assessed concurrently with other relevant units.

What method of assessment should apply?

Assessors must be satisfied that the person can consistently perform the unit as a whole, as defined by the elements, Performance Criteria, skills and knowledge. A holistic approach should be taken to the assessment.

Assessors should gather sufficient, fair, valid, reliable, authentic and current evidence from a range of sources. Sources of evidence may include direct observation, reports from supervisors, peers and colleagues, project work, samples, organisation records and questioning. Assessment should not require language, literacy or numeracy skills beyond those required for the unit.

The assessee will have access to all techniques, procedures, information, resources and aids which would normally be available in the workplace.

The method of assessment should be discussed and agreed with the assessee prior to the commencement of the assessment

What evidence is required for demonstration of consistent performance?

Generally assessment over a period of time would be needed to generate sufficient evidence. It is unlikely that a single assessment event would provide sufficient evidence and project and portfolio approaches are recommended


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assingnment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Required skills

analysis

problem solving

planning and organising

communication

documenting

calculations

Required knowledge

processing requirements of products

capabilities of equipment

abilities and skills of personnel

business requirements from project

The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

Competitive manufacturing strategy

Competitive manufacturing strategy may include one or more of:

Six sigma

Lean Manufacturing

Agile Manufacturing

Just in Time (JIT)

Supply chain management

Value Chain Management

Total Quality

Pro Active maintenance

Elimination of waste

Balanced Scorecard

Variations

Variations are deviations from desired targets and may cover variations in:

quality

time

cost

OHS

Waste

Waste (also known as muda in the Toyota Production System and its derivatives) is any activity which does not contribute to customer benefit or features in the product. Within manufacturing, categories of waste include:

excess production and early production

delays

movement and transport

poor process design

inventory

inefficient performance of a process

making defective items

Waste for this unit may include activities which do not yield any benefit to the organisation or any benefit to the organisations customers.

Stakeholders

Stakeholders may include:

managers

supervisors

employees

shareholders

OHS mechanisms/representatives

IR mechanisms/representatives

suppliers

customers

service providers

Infrastructure needs

Infrastructure needs may include:

physical infrastructure, including plant, equipment, tools, systems and processes

information and control infrastructure

work organisation including numbers of employees

work structure and skills and knowledge held by employees

workforce development and, where required, training

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Identify enterprise capability for products and processes 
Identify the major processing steps in meeting customer order or orders 
Consult with employees, managers and other major stakeholders on major expected benefits from a move to a competitive manufacturing strategy 
Identify lead times, throughput times and waiting times throughout process of meeting a customer order 
Identify variations within the process 
Identify causes of the variations 
Map flow of information, material, and people for each product family 
Draw a current state value stream map for the process as a virtual flow process. 
Analyse the current value stream map for waste 
Draft possible future state value stream map(s) 
Calculate benefits flowing from future State map(s) 
Consult with stakeholders to validate these benefits 
Identify options for the delivery of changes required to move to future state value stream map(s) 
Plan as to how these changes might be implemented including resource, industrial relations, workforce development and occupational health and safety considerations and implications 
Cost the proposed changes and determine benefit cost ratios 
Prepare recommendations for change 
Negotiate/consult with relevant stakeholders to establish the preferred option. 
Arrange for altered process layout as required 
Arrange for altered infrastructure needs as required 
Monitor the implementation of the plan, making adjustments as required 
Review the new value stream and check that expected benefits have been obtained 
Put in place a continuous improvement mechanism for the new value stream. 

Forms

Assessment Cover Sheet

MSACMS604A - Manage competitive manufacturing processes in a jobbing shop environment
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

MSACMS604A - Manage competitive manufacturing processes in a jobbing shop environment

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: