Assessor Resource

MSFFL2020
Install unpatterned tufted and bonded carpet floor coverings to stairs

Assessment tool

Version 1.0
Issue Date: April 2024


This unit of competency covers installing unpatterned tufted and bonded carpet floor coverings to box and wider steps using the carpet gripper system.

Licensing, legislative or certification requirements may apply to this unit and relevant state/territory and local government agencies should be consulted to determine any necessary certification or licensing for undertaking flooring work. Access to construction sites requires certification of general induction training specified by the National Code of Practice for Induction for Construction Work (ASCC 2007).

You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)



Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Prepare for installation

1.1

Applicable work health and safety (WHS), legislative and organisational requirements relevant to installing unpatterned tufted and bonded carpet to stairways are verified and complied with

1.2

Instructions and/or plans are read and interpreted to identify the process required to complete work tasks

1.3

Floor condition is assessed for suitability for installation of unpatterned tufted and bonded carpet

1.4

Tools, equipment and materials are selected and checked prior to use to ensure that they are appropriate for the work, serviceable and in a safe condition

1.5

Sequence of work is planned, including the starting point, to ensure efficiency and quality of installation

2

Set out materials

2.1

Carpet to be installed is checked against order

2.2

Tufted and bonded carpets are acclimatised according to manufacturer recommendations

2.3

Stairway or step is measured and the required amount of floor covering, and underlay, including allowances for type of stairs, is calculated and obtained

2.4

Suitable adhesives, gripper strips and edge strips are selected

2.5

Gripper strips are cut and installed as specified in AS/NZS 2455.1:2007 Textile floor coverings - Installation practice – General

2.6

Underlay is checked against specified type and fitted as specified in AS/NZS 2455.1:2007 Textile floor coverings - Installation practice - General

3

Lay floor coverings

3.1

Instructions and sequence for laying and fixing are followed

3.2

Carpet floor coverings are laid out to meet allowances for type of stair requirements and minimise waste

3.3

Carpet floor coverings are accurately and clearly marked for cutting

3.4

Carpet floor coverings are cut to required shape with minimum waste of materials and laid

3.5

Instructions, sequence, fixing methods and equipment are used following specifications and AS/NZS 2455.1:2007 Textile floor coverings - Installation practice - General

3.6

Installation is completed to specification

3.7

Finished stairway is checked for flaws in installation and materials and faults rectified

4

Complete housekeeping

4.1

Unused materials are stored or recycled as required

4.2

Tools and equipment are cleaned and stored appropriately

4.3

Work area is cleaned and rubbish disposed of appropriately

4.4

Workplace documentation is completed

Interpret work order and locate and apply relevant information

Apply safe handling requirements for equipment, products and materials, including use of personal protective equipment

Identify materials used in the work process

Follow work instructions, operating procedures and inspection processes to:

minimise the risk of injury to self or others

prevent damage to goods, equipment and products

maintain required production output and product quality

Complete a minimum of the installation of one (1) tufted carpet and one (1) fusion bonded carpet to:

a box step stairway containing at least 12 steps, and

a kite winder treads stairway containing at least 3 steps

Use mathematical ideas and techniques to correctly complete measurements, calculate area and estimate material requirements

Communicate ideas and information to enable confirmation of work requirements and specifications and the reporting of work outcomes and problems, interpret basic plans and follow safety procedures

Avoid backtracking, work flow interruptions or wastage

Work with others and in a team by recognising dependencies and using cooperative approaches to optimise work flow and productivity

State or territory WHS legislation, regulations, standards and codes of practice relevant to installing unpatterned tufted and bonded carpet on stairs

Organisational and site standards, requirements, policies and procedures for the installation of unpatterned tufted and bonded carpet on stairs

Environmental protection requirements

Established communication channels and protocols

Relevant problem identification and resolution

Types of tools and equipment and procedures for their safe use, operation and maintenance

Characteristics of materials, products and defects

Set-up and operation of equipment

Products assembly techniques

Procedures for the recording, reporting and maintenance of workplace records and information

Appropriate mathematical procedures for estimation and measurement

Types and characteristics of stairway

Types and uses of carpet installation tools, equipment and materials

Types, uses and limitations of stairway carpet fixing techniques

Characteristics of timber and concrete sub-floors

Workplace safety system requirements related to stairway carpet installation

Work flow in relation to the installation of carpets on stairways

Assessors must:

hold training and assessment competencies as determined by the National Skills Standards Council (NSSC) or its successors

have vocational competency in the furnishing industry at least to the level being assessed with broad industry knowledge and experience, usually combined with a relevant industry qualification

be familiar with the current skills and knowledge used and have relevant, current experience in the furnishing industry.

Assessment methods must confirm consistency of performance over time rather than a single assessment event and in a range of workplace relevant contexts.

Assessment must be by observation of relevant tasks with questioning on underpinning knowledge and, where applicable, multimedia evidence, supervisor’s reports, projects and work samples.

Assessment is to be conducted on single units of competency or in conjunction with other related units of competency. Foundation skills are integral to competent performance in the unit and should not be assessed separately.

Assessment must occur on the job or in a workplace simulated facility with relevant process, equipment, materials, work instructions and deadlines.

Access is required to materials, equipment and specifications relevant to preparing and installing tufted and bonded carpet to box and winder steps.


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assingnment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Prepare for installation

1.1

Applicable work health and safety (WHS), legislative and organisational requirements relevant to installing unpatterned tufted and bonded carpet to stairways are verified and complied with

1.2

Instructions and/or plans are read and interpreted to identify the process required to complete work tasks

1.3

Floor condition is assessed for suitability for installation of unpatterned tufted and bonded carpet

1.4

Tools, equipment and materials are selected and checked prior to use to ensure that they are appropriate for the work, serviceable and in a safe condition

1.5

Sequence of work is planned, including the starting point, to ensure efficiency and quality of installation

2

Set out materials

2.1

Carpet to be installed is checked against order

2.2

Tufted and bonded carpets are acclimatised according to manufacturer recommendations

2.3

Stairway or step is measured and the required amount of floor covering, and underlay, including allowances for type of stairs, is calculated and obtained

2.4

Suitable adhesives, gripper strips and edge strips are selected

2.5

Gripper strips are cut and installed as specified in AS/NZS 2455.1:2007 Textile floor coverings - Installation practice – General

2.6

Underlay is checked against specified type and fitted as specified in AS/NZS 2455.1:2007 Textile floor coverings - Installation practice - General

3

Lay floor coverings

3.1

Instructions and sequence for laying and fixing are followed

3.2

Carpet floor coverings are laid out to meet allowances for type of stair requirements and minimise waste

3.3

Carpet floor coverings are accurately and clearly marked for cutting

3.4

Carpet floor coverings are cut to required shape with minimum waste of materials and laid

3.5

Instructions, sequence, fixing methods and equipment are used following specifications and AS/NZS 2455.1:2007 Textile floor coverings - Installation practice - General

3.6

Installation is completed to specification

3.7

Finished stairway is checked for flaws in installation and materials and faults rectified

4

Complete housekeeping

4.1

Unused materials are stored or recycled as required

4.2

Tools and equipment are cleaned and stored appropriately

4.3

Work area is cleaned and rubbish disposed of appropriately

4.4

Workplace documentation is completed

Specifies different work environments and conditions that may affect performance. Essential operating conditions that may be present (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) are included. Range is restricted to essential operating conditions and any other variables essential to the work environment.

Unit context includes:

WHS requirements, including legislation, building codes, material safety management systems, hazardous and dangerous goods codes and local safe operating procedures or equivalent

work is carried out in accordance with legislative obligations, environmental legislation, relevant health regulations, manual handling procedures and organisation insurance requirements

work requires individual to demonstrate some discretion, judgement and problem solving

Carpets include:

unpatterned

tufted

fusion bonded

Stairways include:

box steps

kite winder treads

Tools and equipment include:

knee kicker

stair tool

carpet gripper cutters

trimmer

hammer

staple hammer

compressor

air staple gun

utility knife

straight edge

drill

hacksaw

sewing needles

Materials include:

underlay

tapes and adhesives

trims

nosing

gripper strips

smooth edges

other accessories

Personal protective equipment includes:

that prescribed under legislation, regulations and enterprise policies and practices

Information and procedures include:

workplace procedures relating to the use of tools and equipment

work instructions, including job sheets, cutting lists, plans, drawings and designs

workplace procedures relating to reporting and communication

manufacturer specifications and operational procedures

Interpret work order and locate and apply relevant information

Apply safe handling requirements for equipment, products and materials, including use of personal protective equipment

Identify materials used in the work process

Follow work instructions, operating procedures and inspection processes to:

minimise the risk of injury to self or others

prevent damage to goods, equipment and products

maintain required production output and product quality

Complete a minimum of the installation of one (1) tufted carpet and one (1) fusion bonded carpet to:

a box step stairway containing at least 12 steps, and

a kite winder treads stairway containing at least 3 steps

Use mathematical ideas and techniques to correctly complete measurements, calculate area and estimate material requirements

Communicate ideas and information to enable confirmation of work requirements and specifications and the reporting of work outcomes and problems, interpret basic plans and follow safety procedures

Avoid backtracking, work flow interruptions or wastage

Work with others and in a team by recognising dependencies and using cooperative approaches to optimise work flow and productivity

State or territory WHS legislation, regulations, standards and codes of practice relevant to installing unpatterned tufted and bonded carpet on stairs

Organisational and site standards, requirements, policies and procedures for the installation of unpatterned tufted and bonded carpet on stairs

Environmental protection requirements

Established communication channels and protocols

Relevant problem identification and resolution

Types of tools and equipment and procedures for their safe use, operation and maintenance

Characteristics of materials, products and defects

Set-up and operation of equipment

Products assembly techniques

Procedures for the recording, reporting and maintenance of workplace records and information

Appropriate mathematical procedures for estimation and measurement

Types and characteristics of stairway

Types and uses of carpet installation tools, equipment and materials

Types, uses and limitations of stairway carpet fixing techniques

Characteristics of timber and concrete sub-floors

Workplace safety system requirements related to stairway carpet installation

Work flow in relation to the installation of carpets on stairways

Assessors must:

hold training and assessment competencies as determined by the National Skills Standards Council (NSSC) or its successors

have vocational competency in the furnishing industry at least to the level being assessed with broad industry knowledge and experience, usually combined with a relevant industry qualification

be familiar with the current skills and knowledge used and have relevant, current experience in the furnishing industry.

Assessment methods must confirm consistency of performance over time rather than a single assessment event and in a range of workplace relevant contexts.

Assessment must be by observation of relevant tasks with questioning on underpinning knowledge and, where applicable, multimedia evidence, supervisor’s reports, projects and work samples.

Assessment is to be conducted on single units of competency or in conjunction with other related units of competency. Foundation skills are integral to competent performance in the unit and should not be assessed separately.

Assessment must occur on the job or in a workplace simulated facility with relevant process, equipment, materials, work instructions and deadlines.

Access is required to materials, equipment and specifications relevant to preparing and installing tufted and bonded carpet to box and winder steps.

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Applicable work health and safety (WHS), legislative and organisational requirements relevant to installing unpatterned tufted and bonded carpet to stairways are verified and complied with 
Instructions and/or plans are read and interpreted to identify the process required to complete work tasks 
Floor condition is assessed for suitability for installation of unpatterned tufted and bonded carpet 
Tools, equipment and materials are selected and checked prior to use to ensure that they are appropriate for the work, serviceable and in a safe condition 
Sequence of work is planned, including the starting point, to ensure efficiency and quality of installation 
Carpet to be installed is checked against order 
Tufted and bonded carpets are acclimatised according to manufacturer recommendations 
Stairway or step is measured and the required amount of floor covering, and underlay, including allowances for type of stairs, is calculated and obtained 
Suitable adhesives, gripper strips and edge strips are selected 
Gripper strips are cut and installed as specified in AS/NZS 2455.1:2007 Textile floor coverings - Installation practice – General 
Underlay is checked against specified type and fitted as specified in AS/NZS 2455.1:2007 Textile floor coverings - Installation practice - General 
Instructions and sequence for laying and fixing are followed 
Carpet floor coverings are laid out to meet allowances for type of stair requirements and minimise waste 
Carpet floor coverings are accurately and clearly marked for cutting 
Carpet floor coverings are cut to required shape with minimum waste of materials and laid 
Instructions, sequence, fixing methods and equipment are used following specifications and AS/NZS 2455.1:2007 Textile floor coverings - Installation practice - General 
Installation is completed to specification 
Finished stairway is checked for flaws in installation and materials and faults rectified 
Unused materials are stored or recycled as required 
Tools and equipment are cleaned and stored appropriately 
Work area is cleaned and rubbish disposed of appropriately 
Workplace documentation is completed 

Forms

Assessment Cover Sheet

MSFFL2020 - Install unpatterned tufted and bonded carpet floor coverings to stairs
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

MSFFL2020 - Install unpatterned tufted and bonded carpet floor coverings to stairs

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: