MSFFL2041 - Install impact and sound absorption underlay
Assessor Resource
MSFFL2041 Install impact and sound absorption underlay
Assessment tool
Version 1.0 Issue Date: May 2024
This unit describes the skills and knowledge required to prepare, set out, cut and lay impact and sound absorption underlay over a new or existing subfloor in preparation for the installation of a laminate or engineered timber floor.
This unit applies to flooring technicians installing underlay in accordance with pre-determined work orders.
Licensing, legislative or certification requirements may apply to this unit and relevant state/territory and local government agencies should be consulted to determine any necessary certification or licensing for undertaking flooring work. Industry standards and codes of practice within Australia must also be applied. Access to construction sites requires certification of general induction training specified by the National Code of Practice for Induction for Construction Work (ASCC 2007).
You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)
Submission Requirements
List each assessment task's title, type (eg project, observation/demonstration, essay, assingnment, checklist) and due date here
Assessment task 1: [title] Due date:
(add new lines for each of the assessment tasks)
Assessment Tasks
Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.
Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.
Observation Checklist
Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice
Yes
No
Comments/feedback
Identify and follow work health and safety, legislative and organisational requirements
Correctly identify work requirements and process from review of documentation
Confirm subfloor suitability for installation consistent with Australian Standards and manufacturer recommendations
Select adhesives, mouldings, trims and fixings based on job requirements
Select and check tools and equipment prior to use to ensure that they are appropriate for the work, serviceable and in a safe condition
Plan sequence of work to ensure efficiency and quality of application
Check impact and sound absorption underlay against work order and acclimatise in accordance with manufacturer recommendations
Use materials in accordance with safety management requirements
Establish working lines and starting point
Follow instructions and sequence for laying and fixing
Lay out underlay to meet directional sequence, specification requirements and to minimise waste and joins
Cut underlay to required shape with minimum waste of materials
Use materials in accordance with safety management requirements
Prepare required adhesives and edge strips/accessories for use
Apply required adhesive to subfloor in accordance with manufacturer instructions
Fix underlay using methods and equipment that follow manufacturer instructions
Check completed installation for flaws in installation and materials and rectify faults in accordance with workplace procedures
Store and recycle unused materials in accordance with workplace procedures
Check, clean and store tools and equipment in accordance with workplace procedures