Assessor Resource

MSFFL3017
Install resilient sheet to walls

Assessment tool

Version 1.0
Issue Date: April 2024


This unit of competency covers installing resilient sheet to dry and wet walls.

Licensing, legislative or certification requirements may apply to this unit and relevant state/territory and local government agencies should be consulted to determine any necessary certification or licensing for undertaking flooring work. Access to construction sites requires certification of general induction training specified by the National Code of Practice for Induction for Construction Work (ASCC 2007).

You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)



Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Prepare for installation

1.1

Applicable work health and safety (WHS), legislative and organisational requirements relevant to installing resilient sheet to walls are verified and complied with

1.2

Instructions and/or plans are read and interpreted to identify process required to complete work tasks

1.3

Substrate condition is assessed for suitability for installation of resilient coverings to the walls

1.4

Suitable adhesives, trims and accessories are selected

1.5

Tools, equipment and materials are selected and checked prior to use to ensure that they are appropriate for the work, serviceable and in a safe condition

1.6

Sequence of work is planned, including the starting point, to ensure efficiency and quality of installation

2

Set out floor coverings

2.1

Resilient sheet to be installed is checked against work order

2.2

Resilient sheets are acclimatised according to manufacturer recommendations

2.3

Resilient sheets for fixing are organised and used in accordance with relevant safety management requirements

2.4

Working lines and starting point are established

2.5

Pre-form fillet is cut and fitted, if required

2.6

Feathering systems and applications are prepared and applied in accordance with the installation plan

3

Install resilient sheet

3.1

Resilient sheet are laid out to meet directional sequence, pattern match, specification requirements and to minimise waste and joins as appropriate

3.2

The aesthetics of the materials is maximised, where appropriate, matching grains, colours and patterns

3.3

Materials are cut to length and size, allowing for final adjustment, trimming and welding processes

3.4

Header and/or perimeter contact adhesive is applied to surfaces

3.5

Adhesive is applied to the body of the walls as specified by the adhesive manufacturer

3.6

Resilient sheet is positioned in accordance with the plan, pressed out and hand-rolled

3.7

Resilient sheet is heated to form required profiles

3.8

Seams are prepared and welded in accordance with the plan, manufacturer instructions and industry standards

3.9

Joins and/or seams are trimmed and finished to industry standards

3.10

Resilient sheet are sealed to floor coverings, door and window frames, as well as fixtures and fittings in wet area installations

3.11

Completed installation is checked for flaws in installation and materials and faults rectified following workplace procedures

4

Complete housekeeping

4.1

Unused materials are stored or recycled as required

4.2

Tools and equipment are cleaned and stored appropriately

4.3

Work area is cleaned and rubbish disposed of appropriately

4.4

Workplace documentation is completed

Interpret work order and locate and apply relevant information

Apply safe handling requirements for equipment, products and materials, including use of personal protective equipment

Identify materials used in the work process

Follow work instructions, operating procedures and inspection processes to:

minimise the risk of injury to self or others

prevent damage to goods, equipment and products

maintain required production output and product quality

Complete a minimum of:

one (1) installation of a wet wall resilient wall covering installation using a horizontal installation system, including internal and external corners to walls, the covering of window reveals, and sealing to door frames and fittings

one (1) installation of a wet wall resilient wall covering installation using a vertical installation system, including internal and external corners to walls, the covering of window reveals and sealing to door frames and fittings

Use mathematical ideas and techniques to correctly complete measurements, calculate area and estimate material requirements

Communicate ideas and information to enable confirmation of work requirements and specifications and the reporting of work outcomes and problems, interpret basic plans and follow safety procedures

Avoid backtracking, work flow interruptions or wastage

Work with others and in a team by recognising dependencies and using cooperative approaches to optimise work flow and productivity

State or territory WHS legislation, regulations, standards and codes of practice relevant to installing resilient sheet to walls

Organisational and site standards, requirements, policies and procedures for installing resilient sheet to walls

Environmental protection requirements

Established communication channels and protocols

Relevant problem identification and resolution

Types of tools and equipment and procedures for their safe use, operation and maintenance

Characteristics of materials, products and defects

Set-up and operation of equipment

Products assembly techniques

Procedures for the recording, reporting and maintenance of workplace records and information

Appropriate mathematical procedures for estimation and measurement

Type, characteristics, uses and limitations of:

weldable resilient wall coverings

resilient wall covering installation adhesives

Types and uses of resilient wall covering installation tools and equipment

Workplace safety system requirements related to resilient wall covering installation

Characteristics and requirements of substrate preparation for wall coverings

Work flow in relation to fixing, welding and finishing of resilient wall coverings

Assessors must:

hold training and assessment competencies as determined by the National Skills Standards Council (NSSC) or its successors

have vocational competency in the furnishing industry at least to the level being assessed with broad industry knowledge and experience, usually combined with a relevant industry qualification

be familiar with the current skills and knowledge used and have relevant, current experience in the furnishing industry.

Assessment methods must confirm consistency of performance over time rather than a single assessment event and in a range of workplace relevant contexts.

Assessment must be by observation of relevant tasks with questioning on underpinning knowledge and, where applicable, multimedia evidence, supervisor’s reports, projects and work samples.

Assessment is to be conducted on single units of competency or in conjunction with other related units of competency. Foundation skills are integral to competent performance in the unit and should not be assessed separately.

Assessment must occur on the job or in a workplace simulated facility with relevant process, equipment, materials, work instructions and deadlines.

Access is required to materials, equipment and specifications relevant to installing resilient sheet to walls.


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assingnment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Prepare for installation

1.1

Applicable work health and safety (WHS), legislative and organisational requirements relevant to installing resilient sheet to walls are verified and complied with

1.2

Instructions and/or plans are read and interpreted to identify process required to complete work tasks

1.3

Substrate condition is assessed for suitability for installation of resilient coverings to the walls

1.4

Suitable adhesives, trims and accessories are selected

1.5

Tools, equipment and materials are selected and checked prior to use to ensure that they are appropriate for the work, serviceable and in a safe condition

1.6

Sequence of work is planned, including the starting point, to ensure efficiency and quality of installation

2

Set out floor coverings

2.1

Resilient sheet to be installed is checked against work order

2.2

Resilient sheets are acclimatised according to manufacturer recommendations

2.3

Resilient sheets for fixing are organised and used in accordance with relevant safety management requirements

2.4

Working lines and starting point are established

2.5

Pre-form fillet is cut and fitted, if required

2.6

Feathering systems and applications are prepared and applied in accordance with the installation plan

3

Install resilient sheet

3.1

Resilient sheet are laid out to meet directional sequence, pattern match, specification requirements and to minimise waste and joins as appropriate

3.2

The aesthetics of the materials is maximised, where appropriate, matching grains, colours and patterns

3.3

Materials are cut to length and size, allowing for final adjustment, trimming and welding processes

3.4

Header and/or perimeter contact adhesive is applied to surfaces

3.5

Adhesive is applied to the body of the walls as specified by the adhesive manufacturer

3.6

Resilient sheet is positioned in accordance with the plan, pressed out and hand-rolled

3.7

Resilient sheet is heated to form required profiles

3.8

Seams are prepared and welded in accordance with the plan, manufacturer instructions and industry standards

3.9

Joins and/or seams are trimmed and finished to industry standards

3.10

Resilient sheet are sealed to floor coverings, door and window frames, as well as fixtures and fittings in wet area installations

3.11

Completed installation is checked for flaws in installation and materials and faults rectified following workplace procedures

4

Complete housekeeping

4.1

Unused materials are stored or recycled as required

4.2

Tools and equipment are cleaned and stored appropriately

4.3

Work area is cleaned and rubbish disposed of appropriately

4.4

Workplace documentation is completed

Specifies different work environments and conditions that may affect performance. Essential operating conditions that may be present (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) are included. Range is restricted to essential operating conditions and any other variables essential to the work environment.

Unit context includes:

WHS requirements, including legislation, building codes, material safety management systems, hazardous and dangerous goods codes, and local safe operating procedures or equivalent

work is carried out in accordance with legislative obligations, environmental legislation, relevant health regulations, manual handling procedures and organisation insurance requirements

work requires individuals to demonstrate some discretion, judgement and problem solving

Resilient wall coverings include:

homogeneous/heterogeneous

linoleum sheet

encapsulated glass fibre

inlaid

rotogravure

Adhesives include:

acrylic adhesives

water and solvent-based contacts recommended by manufacturers

Tools and equipment include:

flat trowel

notched trowel

pencil

cove roller

wall roller

hand roller

corner roller

recess scriber

hook and straight knife

chalk-line

spirit level

tape measure

water level

laser level

height gauge

wall trolley

contact bucket/tray/roller brushes

scaffolding

step ladder

Materials include:

resilient wall coverings

skirting

reducing and edge strips

welding rod

coving accessories

tapes

pattern paper

fillers

adhesives

Feathering systems include:

fitment of PVC edge fillet diminishing strip and the use of pre-mixed or mixed cementitious compounds

Welding includes:

rod welding

self welding

fusion

Profiles include:

internal and external angles

bullnoses

coves

profiling to pipe work

Trimmed and finished includes:

trimming weld rod

abrading and fusing external corners

chemically finishing to industry standards and manufacturer specifications

Sealed includes:

the sealing of the resilient wall coverings at door and window frames, pipes, fixtures, fittings and floor coverings

Personal protective equipment includes:

that prescribed under legislation, regulations and enterprise policies and practices

Information and procedures include:

workplace procedures relating to the use of tools and equipment

work instructions, including job sheets, cutting lists, plans, drawings and designs

workplace procedures relating to reporting and communication

manufacturer specifications and operational procedures

Interpret work order and locate and apply relevant information

Apply safe handling requirements for equipment, products and materials, including use of personal protective equipment

Identify materials used in the work process

Follow work instructions, operating procedures and inspection processes to:

minimise the risk of injury to self or others

prevent damage to goods, equipment and products

maintain required production output and product quality

Complete a minimum of:

one (1) installation of a wet wall resilient wall covering installation using a horizontal installation system, including internal and external corners to walls, the covering of window reveals, and sealing to door frames and fittings

one (1) installation of a wet wall resilient wall covering installation using a vertical installation system, including internal and external corners to walls, the covering of window reveals and sealing to door frames and fittings

Use mathematical ideas and techniques to correctly complete measurements, calculate area and estimate material requirements

Communicate ideas and information to enable confirmation of work requirements and specifications and the reporting of work outcomes and problems, interpret basic plans and follow safety procedures

Avoid backtracking, work flow interruptions or wastage

Work with others and in a team by recognising dependencies and using cooperative approaches to optimise work flow and productivity

State or territory WHS legislation, regulations, standards and codes of practice relevant to installing resilient sheet to walls

Organisational and site standards, requirements, policies and procedures for installing resilient sheet to walls

Environmental protection requirements

Established communication channels and protocols

Relevant problem identification and resolution

Types of tools and equipment and procedures for their safe use, operation and maintenance

Characteristics of materials, products and defects

Set-up and operation of equipment

Products assembly techniques

Procedures for the recording, reporting and maintenance of workplace records and information

Appropriate mathematical procedures for estimation and measurement

Type, characteristics, uses and limitations of:

weldable resilient wall coverings

resilient wall covering installation adhesives

Types and uses of resilient wall covering installation tools and equipment

Workplace safety system requirements related to resilient wall covering installation

Characteristics and requirements of substrate preparation for wall coverings

Work flow in relation to fixing, welding and finishing of resilient wall coverings

Assessors must:

hold training and assessment competencies as determined by the National Skills Standards Council (NSSC) or its successors

have vocational competency in the furnishing industry at least to the level being assessed with broad industry knowledge and experience, usually combined with a relevant industry qualification

be familiar with the current skills and knowledge used and have relevant, current experience in the furnishing industry.

Assessment methods must confirm consistency of performance over time rather than a single assessment event and in a range of workplace relevant contexts.

Assessment must be by observation of relevant tasks with questioning on underpinning knowledge and, where applicable, multimedia evidence, supervisor’s reports, projects and work samples.

Assessment is to be conducted on single units of competency or in conjunction with other related units of competency. Foundation skills are integral to competent performance in the unit and should not be assessed separately.

Assessment must occur on the job or in a workplace simulated facility with relevant process, equipment, materials, work instructions and deadlines.

Access is required to materials, equipment and specifications relevant to installing resilient sheet to walls.

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Applicable work health and safety (WHS), legislative and organisational requirements relevant to installing resilient sheet to walls are verified and complied with 
Instructions and/or plans are read and interpreted to identify process required to complete work tasks 
Substrate condition is assessed for suitability for installation of resilient coverings to the walls 
Suitable adhesives, trims and accessories are selected 
Tools, equipment and materials are selected and checked prior to use to ensure that they are appropriate for the work, serviceable and in a safe condition 
Sequence of work is planned, including the starting point, to ensure efficiency and quality of installation 
Resilient sheet to be installed is checked against work order 
Resilient sheets are acclimatised according to manufacturer recommendations 
Resilient sheets for fixing are organised and used in accordance with relevant safety management requirements 
Working lines and starting point are established 
Pre-form fillet is cut and fitted, if required 
Feathering systems and applications are prepared and applied in accordance with the installation plan 
Resilient sheet are laid out to meet directional sequence, pattern match, specification requirements and to minimise waste and joins as appropriate 
The aesthetics of the materials is maximised, where appropriate, matching grains, colours and patterns 
Materials are cut to length and size, allowing for final adjustment, trimming and welding processes 
Header and/or perimeter contact adhesive is applied to surfaces 
Adhesive is applied to the body of the walls as specified by the adhesive manufacturer 
Resilient sheet is positioned in accordance with the plan, pressed out and hand-rolled 
Resilient sheet is heated to form required profiles 
Seams are prepared and welded in accordance with the plan, manufacturer instructions and industry standards 
Joins and/or seams are trimmed and finished to industry standards 
Resilient sheet are sealed to floor coverings, door and window frames, as well as fixtures and fittings in wet area installations 
Completed installation is checked for flaws in installation and materials and faults rectified following workplace procedures 
Unused materials are stored or recycled as required 
Tools and equipment are cleaned and stored appropriately 
Work area is cleaned and rubbish disposed of appropriately 
Workplace documentation is completed 

Forms

Assessment Cover Sheet

MSFFL3017 - Install resilient sheet to walls
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

MSFFL3017 - Install resilient sheet to walls

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: