List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.
Elements describe the essential outcomes. | Performance criteria describe the performance needed to demonstrate achievement of the element. |
1 | Prepare for installation | 1.1 | Applicable work health and safety (WHS), legislative and organisational requirements relevant to installing cork tiles are verified and complied with |
1.2 | Instructions and/or plans are read and interpreted to identify the process required to complete work tasks |
1.3 | Floor condition is assessed for suitability for installation of cork tiles |
1.4 | Suitable adhesives, trims and accessories are selected |
1.5 | Tools, equipment and materials are selected and checked prior to use to ensure that they are appropriate for the work, serviceable and in a safe condition |
1.6 | Sequence of work is planned to correctly identify the starting point and to ensure lay out and fixing is in logical order |
2 | Set out materials | 2.1 | Cork tiles to be installed are checked against work order |
2.2 | Cork tiles are acclimatised according to manufacturer recommendation |
2.3 | Materials for fixing are organised and used in accordance with relevant safety management requirements |
2.4 | Working lines and starting point are established |
3 | Lay cork tiles | 3.1 | Instructions and sequence for laying and fixing are followed |
3.2 | Tiles are laid out to meet specification requirements and to minimise waste |
3.3 | Tile grains and patterns are matched or contrasted as appropriate |
3.4 | Tiles are accurately and clearly marked for cutting |
3.5 | Tiles are cut to required shape with minimum waste of materials and laid |
3.6 | Completed installation is checked for flaws in installation and materials and faults rectified |
4 | Complete housekeeping | 4.1 | Unused materials are stored or recycled as required |
4.2 | Tools and equipment are cleaned and stored appropriately |
4.3 | Work area is cleaned and rubbish disposed of appropriately |
4.4 | Workplace documentation is completed |
Interpret work order and locate and apply relevant information
Apply safe handling requirements for equipment, products and materials, including use of personal protective equipment
Identify materials used in the work process
Follow work instructions, operating procedures and inspection processes to:
minimise the risk of injury to self or others
prevent damage to goods, equipment and products
maintain required production output and product quality
Complete at least one (1) installation using either a wet or dry method, including basic set-out and installation
Use mathematical ideas and techniques to correctly complete measurements, calculate area and estimate material requirements
Communicate ideas and information to enable confirmation of work requirements and specifications and the reporting of work outcomes and problems, interpret basic plans and follow safety procedures
Avoid backtracking, work flow interruptions or wastage
Work with others and in a team by recognising dependencies and using cooperative approaches to optimise work flow and productivity
State or territory WHS legislation, regulations, standards and codes of practice relevant to installing cork tiles
Organisational and site standards, requirements, policies and procedures for the installation of cork tiles
Environmental protection requirements
Established communication channels and protocols
Relevant problem identification and resolution
Types of tools and equipment and procedures for their safe use, operation and maintenance
Characteristics of materials, products and defects
Set-up and operation of equipment
Products assembly techniques
Procedures for the recording, reporting and maintenance of workplace records and information
Appropriate mathematical procedures for estimation and measurement
Type, characteristics, uses and limitations of:
cork tiles
cork tile installation adhesives
Types and uses of tile installation tools and equipment
Workplace safety system requirements related to cork tile laying
Characteristics and requirements of sub-floor preparation
Work flow in relation to the cork tile floor covering operations
Assessors must:
hold training and assessment competencies as determined by the National Skills Standards Council (NSSC) or its successors
have vocational competency in the furnishing industry at least to the level being assessed with broad industry knowledge and experience, usually combined with a relevant industry qualification
be familiar with the current skills and knowledge used and have relevant, current experience in the furnishing industry.
Assessment methods must confirm consistency of performance over time rather than a single assessment event and in a range of workplace relevant contexts.
Assessment must be by observation of relevant tasks with questioning on underpinning knowledge and, where applicable, multimedia evidence, supervisor’s reports, projects and work samples.
Assessment is to be conducted on single units of competency or in conjunction with other related units of competency. Foundation skills are integral to competent performance in the unit and should not be assessed separately.
Assessment must occur on the job or in a workplace simulated facility with relevant process, equipment, materials, work instructions and deadlines.
Access is required to materials, equipment and specifications relevant to installing cork tiles.