Assessor Resource

MSFFL3116
Install resilient sheet to walls

Assessment tool

Version 1.0
Issue Date: May 2024


You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)

Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assingnment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.
Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Interpret resilient sheet installation requirements from job and manufacturer instructions and calculate the quantities of materials required 
Identify hazards relating to the work site, work practices, materials, tools and equipment, and check risk treatments are in place and operating 
Select and check all required tools and equipment are ready to use, and organise to fix any deficiencies according to workplace procedures 
Gather the resilient sheet, coatings, adhesives and other materials required by job instructions, and check they meet quality requirements and are prepared and ready to use or install according to the manufacturer instructions, product labels, safety data sheets and workplace procedures 
Confirm the wall substrate is clean and suitable for installing the resilient sheet, and fix or report any deficiencies according to workplace procedures 
Establish a mixing station in a safe, suitable location, and prepare the surface coating 
Trial the surface coating to check the equipment is operating correctly and the consistency of the coating material and the surface finish are according to the manufacturer instructions 
Apply surface coating to the required depth and coverage according to the manufacturer instructions and job requirements 
Check internal and external corners for square 
Check wall surfaces for plane, and smooth and clear them for further processing 
Prepare feathering systems and applications and apply according to the manufacturer instructions and job instructions 
Establish the starting point and mark out working lines 
Cut and fasten any required pre-form fillet according to job instructions 
Measure, mark and cut the resilient sheet as required 
Apply adhesive to the wall according to the manufacturer instructions, product labels, safety data sheets and workplace procedures 
Position and fasten the resilient sheet according to workplace procedures 
Heat the resilient sheet to form profiles as required by job instructions 
Weld the resilient sheet’s seams and joins according to the manufacturer instructions 
Finish installing the resilient sheet and trim joins and seams 
Check the resilient sheet is installed correctly according to job instructions and quality requirements, and fix any deficiencies 
Clean up the work area, identify items for recycling and dispose of waste 
Identify, tag and report any damage to equipment and tools 
Check, clean and do routine maintenance of equipment and tools and store them and unused materials 
Complete task outcome documentation 

Forms

Assessment Cover Sheet

MSFFL3116 - Install resilient sheet to walls
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

MSFFL3116 - Install resilient sheet to walls

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: