Assessor Resource

MSFFL3119
Install timber battens and plywood in preparation to install strip timber

Assessment tool

Version 1.0
Issue Date: May 2024


You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)

Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assingnment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.
Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Interpret timber batten and plywood installation requirements from job instructions and calculate the quantities of materials required 
Identify hazards relating to the work site, work practices, materials, tools and equipment, and check risk treatments are in place and operating 
Select and check all required tools and equipment are ready to use, and organise to fix any deficiencies according to workplace procedures 
Gather the moisture vapour barrier, timber battens or plywood, adhesives, trims and other materials required by job instructions, and check they meet quality requirements and are prepared and ready to install according to the manufacturer instructions, product labels, safety data sheets and workplace procedures 
Confirm the subfloor is clean and suitable for installing the moisture vapour barrier and timber battens or plywood, and fix or report any deficiencies according to workplace procedures 
Remove or undercut door jambs, cover trims and other joinery, and store for refitting or send for machining according to job instructions 
Fasten the moisture vapour barrier according to manufacturer instructions 
Establish the starting point and mark out working lines 
Measure, mark and cut the timber battens or plywood according to job instructions to length and size, to minimise waste and joints, and to ensure an efficient, quality installation 
Fasten the timber battens or plywood according to the manufacturer instructions 
Adjust battens for levels according to job instructions 
Clean up the work area, identify items for recycling and dispose of waste 
Identify, tag and report any damage to equipment and tools 
Check, clean and do routine maintenance on equipment and tools and store them and unused materials 
Complete task outcome documentation 

Forms

Assessment Cover Sheet

MSFFL3119 - Install timber battens and plywood in preparation to install strip timber
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

MSFFL3119 - Install timber battens and plywood in preparation to install strip timber

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: