Assessor Resource

NWP342A
Commission, decommission and monitor hydrometric sites, stations and facilities

Assessment tool

Version 1.0
Issue Date: March 2024


This unit supports the attainment of skills and knowledge required for hydrographers and related staff.

This unit of competency describes the outcomes required to commission, decommission and monitor hydrometric sites, stations and facilities to organisational standards. The ability to interpret and apply technical specifications and undertake the commissioning of sites to support the collection of hydrometric data are central to successful performance.

You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)

Prerequisites

Not applicable.


Employability Skills

This unit of competency contains employability skills.




Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

The evidence guide provides advice on assessment and must be read in conjunction with the Performance Criteria, Required Skills and Knowledge, the Range Statement and the Assessment Guidelines for the Training Package.

Critical aspects for assessment and evidence required to demonstrate competency in this unit

The candidate should demonstrate the ability to commission, decommission and monitor hydrometric sites, stations and facilities including:

gathering, interpreting and applying construction and technical documentation related to the commissioning and decommissioning of hydrometric sites, stations and facilities

commissioning hydrometric sites, stations and facilities

closely adhering to organisational and industry standards for the testing and monitoring of instruments

preparing clear and accurate reports

working safely

minimising environmental impacts from the commissioning and decommissioning process

identifying, reporting and (within scope of job function) solving potential or actual problems.

Context of and specific resources for assessment

Access to the workplace and resources including:

documentation that should normally be available in a water industry organisation

relevant codes, standards, and government regulations.

Where applicable, physical resources should include equipment modified for people with disabilities.

Access must be provided to appropriate learning and/or assessment support when required.

Assessment processes and techniques must be culturally appropriate, and appropriate to the language and literacy capacity of the candidate and the work being performed.

Validity and sufficiency of evidence requires that:

competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace

where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice

a decision of competence should only be made when the assessor has complete confidence in the person's competence over time and in various contexts

all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence

where assessment is for the purpose of recognition (RCC/RPL), the evidence provided will need to be authenticated and show that it represents competency demonstrated over a period of time

assessment can be through simulated project-based activity and must include evidence relating to each of the elements in this unit.

In all cases where practical assessment is used it will be combined with targeted questioning to assess the underpinning knowledge. Questioning will be undertaken in a manner appropriate to the skill levels of the operator, any cultural issues that may affect responses to the questions, and reflecting the requirements of the competency and the work being performed.


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assingnment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

This describes the essential skills and knowledge and their level, required for this unit.

Required skills:

interprets and applies technical documentation to commissioning and decommissioning of hydrometric sites, stations and facilities

applies construction and mechanical skills to the effective commissioning and decommissioning of hydrometric sites, stations and facilities

uses appropriate work practices to minimise environmental impact of the commissioning and decommissioning process

uses safety equipment and personal protective equipment appropriately

uses hand and power tools and other relevant equipment effectively and safely

identifies potential or actual operational problems

conducts inspections

produces reports

reads and interprets plans, specifications, maps and job instructions

communicates with employees and customers

uses communication systems

gives and receives instructions

applies skills specific to the industry and for working safely in remote locations including:

remote area survival

water safety

high voltage work

hazardous environments.

Required knowledge:

mathematics, atmospheric physics and hydrology relevant to the role

operating parameters, processes and capacity limitations of hydrometric sites, stations and facilities

risk factors and potential hazards involved with commissioning and decommissioning sites, stations and facilities

occupational health and safety procedures

policies and standard operating procedures

relevant utilities and service bodies

communication systems

Standards relevant to the installation tasks including:

AS 3778 for water measurement installations

WMO / Bureau of Meteorology guidelines for siting of meteorological sensors and systems

application of best practice methodology where standards not applicable or available

relevant construction standards and codes (Federal, State and Local).

The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the Performance Criteria, is detailed below. Add any essential operating conditions that may be present with training and assessment depending on the work situation, needs if the candidate, accessibility of the item, and local industry and regional contexts.

Monitoring is conducted for a range of data collection purposes including:

stage and discharge

surface water and ground water measurement, assessment and management

snow pack measurement

estuarine monitoring

water quality

other purposes relevant to the specific requirements of the monitoring site.

Equipment required for installation and maintenance may include:

personal protective equipment

hand and power tools

portable power supplies

computer equipment

pumping equipment

test equipment

communications equipment

signage

4WD vehicles

bore drilling rig

surveying equipment (staffs, levels, GPS, EDM).

Organisational standards and safe work practices may include reference to:

by-laws and organisational policies

standard operating procedures

environment protection standards and requirements

occupational health and safety standards and requirements, including use of personal protective equipment

safe handling of hazardous substances

appropriate use of road and worksite signage.

The compilation of reports and documentation requires:

rigorous application of appropriate industry standards for the collection and reporting of data

the application of knowledge appropriate to the task across a broad range of areas including hydrology, physics and mathematics to ensure appropriate and accurate analysis and reporting of hydrometric data.

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Identify and confirm the commissioning procedures for the site, station or facility. 
Identify the monitoring requirements supported by the site, station or facility. 
Conduct site investigations and surveys in accordance with organisational procedures in order to select appropriate sites. 
Prepare plans for the commissioning or decommissioning of the site, station or facility and secure appropriate authorisation. 
Identify, assemble and check the equipment required for the task prior to use. 
Prepare the site, station or facility according to the work plan and in accordance with organisational standards and safe work practices. 
Commission and register hydrometric stations and ancillary infrastructure. 
Complete records of the commissioning process in accordance with organisational procedures. 
Apply instrument and site maintenance schedules. 
Apply testing schedules. 
Put in place processes to monitor instrument performance and take corrective action as required in accordance with organisational and industry standards. 
Maintain test records in accordance with organisational requirements. 
Compile and store reports and documentation according to organisational requirements. 
Demolish or decommission structures in accordance with organisational standards and safe work practices. 
Restore sites in accordance with organisational standards, safe work practices and environmental requirements. 
Identify and address potential or actual problems and report to appropriate personnel. 

Forms

Assessment Cover Sheet

NWP342A - Commission, decommission and monitor hydrometric sites, stations and facilities
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

NWP342A - Commission, decommission and monitor hydrometric sites, stations and facilities

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: