Assessor Resource

NWP608
Design sewerage pumping station systems

Assessment tool

Version 1.0
Issue Date: April 2024


This unit applies to engineering para-professionals who are required to design sewerage pumping station systems as an element of town sewerage.

No licensing, legislative, regulatory or certification requirements apply to this unit at the time of publication.

This unit of competency sets out the knowledge and skills required to apply principles of design for a sewerage pumping station system, using appropriate design standards.

You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)

Prerequisites

Not applicable.


Employability Skills

This unit contains employability skills.




Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.

Overview of assessment

The candidate should:

perform each task outlined in the elements consistently and in a representative range of contexts

meet the performance criteria associated with each element by employing the techniques, procedures, information and resources available in the workplace from those listed in the range statement.

Critical aspects for assessment and evidence required to demonstrate competency in this unit

The candidate should demonstrate the ability to design sewerage pumping station systems including:

identifying, analysing and defining sewerage pumping station design requirements, conditions and constraints

identifying and interpreting legislative, environmental, business and project management requirements

developing scenario options for future needs and conditions

analysing a range of factors to determine catchment impacts

planning, preparing and selecting options for system design

managing and securing documentation to support and report project management

evaluating, and consulting on proposals to gauge impact and support

making recommendations on the planning and design requirements for sewerage pumping station systems

Context of and specific resources for assessment

Access to the workplace and resources including:

documentation that should normally be available in a water industry organisation

workplace specific equipment and technology

supervision and experienced team members to provide observations, feedback and third party reports

enterprise operating procedures and work allocation

relevant codes, standards and government regulations

Where applicable, physical resources should include equipment modified for people with disabilities.

Access must be provided to appropriate learning and assessment support when required.

Method of assessment

The following methods are suggested:

assessment in the workplace or in a simulated workplace and under the normal range of workplace conditions

assessment should also be conducted in conjunction with aspects of technical competencies that are consistent with the work environment

techniques for gathering evidence of competency may include:

observation of performance

written and/or oral questioning to assess knowledge and understanding

completion of workplace documents and reports produced as part of routine work activities

third-party reports from experienced practitioners

completion of performance feedback from supervisors and colleagues

Guidance information for assessment

Assessment processes and techniques must be culturally appropriate, and appropriate to the language and literacy capacity of the candidate and the work being performed.

Validity and sufficiency of evidence require that:

competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace

where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice

a decision of competence only taken at the point when the assessor has complete confidence in the person’s competence over time and in various contexts

all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence

where assessment is for the purpose of recognition (RCC/RPL), the evidence provided will need to be authenticated and show that it represents competency demonstrated over a period of time

assessment can be through simulated projectbased activity and must include evidence relating to each of the elements in this unit

In all cases where practical assessment is used it will be combined with targeted questioning to assess the underpinning knowledge. Questioning will be undertaken in a manner appropriate to the skill levels of the operator and cultural issues that may affect responses to the questions, and will reflect the requirements of the competency and the work being performed.


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assingnment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Required skills:

interpret and apply legislative requirements, codes and standards

assess environmental impacts

apply quality requirements

analyse complex information

operate computer software

conduct investigations

prepare documentation

collaborate with a diverse team of specialists

conduct consultations with a range of community interests

data management

project planning

Required knowledge:

legislative requirements, codes and standards for the design of sewerage pumping station systems including environmental protection and occupational health and safety

output quality specification requirements

cost benefit analysis procedures

risk analysis procedures

investigation procedures and methodologies

documentation and information management requirements

The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

Design standards and specifications may include:

government legislation and by-laws

enterprise and organisational plans, policies and procedures

codes

Australian standards

ISO standards

specific design guidelines

manufacturers’ and contractors’ conditions, contracts and standards

Sewerage pumping station system may include:

sewage pumping stations

pressure mains

storage

Initial data may include:

costs

existing and future flows

customer requirements

locations

catchments

demographics

land use

meteorological information

topographic information

Project design requirements may include:

sewer sizes, location and staging

pump station location

overflows (licensed)

odour control, ventilation

system layout

staging of developments

system configuration

water quality

pumping stations

pressure main sizes and location

storage tanks

future system expansion options

design flow estimation

design flow containment standard

Legislative and organisation requirements may include:

Federal and State legislation

codes

national guidelines

environmental protection agencies

Impacts may include:

visual

odour

noise

social

political

natural

cultural

infrastructure

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Identify system requirements, constraints, and areas requiring clarification from the concept proposal. 
Negotiate alternative options to concept proposal to resolve problems. 
Confirm design standards and specifications relevant to the sewerage pumping station system. 
Define and document detailed design requirements. 
Identify and apply initial data to the design. 
Review project design requirements prior to proceeding with detailed design. 
Determine system characteristics (static and dynamic head conditions) 
Establish design pump duties. 
Determine pressure main and pipe work requirements. 
Calculate wet well volume and operating levels. 
Finalise horizontal and vertical pressure main alignment in accordance with project design requirements and design standards and specifications. 
Nominate appropriate pipe materials. 
Prepare structural design of pressure main. 
Determine emergency storage and overflow containment requirements. 
Design starter system to meet project design requirements and design standards and specifications. 
Design to make allowance for OHS during construction in service life. 
Prepare design drawings in accordance with design standards, codes and Water Agency requirements. 
Prepare supporting documentation in accordance with legislative and organisation requirements. 
Maintain engineering and project records in accordance with legislative and organisation requirements. 
Review design to ensure objectives and specifications have been met. 
Identify and evaluate compliance with environmental standards and impacts of the design. 
Identify and evaluate compliance with legislation, codes and standards including OHS. 
Conduct consultations with parties with an interest in the design and report on adjustments and proposed design changes. 
Investigate and assess alternative design options. 
Recommend the most appropriate design proposal for adoption. 

Forms

Assessment Cover Sheet

NWP608 - Design sewerage pumping station systems
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

NWP608 - Design sewerage pumping station systems

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: