Assessor Resource

PMAOPS312B
Undertake ship loading_unloading operations

Assessment tool

Version 1.0
Issue Date: April 2024


Loading areas can include:

terminal facilities

jetties

production platforms

floating storage and offtake/floating production storage and offtake (FSO/FPSO).

The operations technician will control the cargo transfer rate within safe limits, which are agreed between the ship and/or the terminal prior to commencing transfer. Jetty and platform operators will observe the mooring and direct the positioning of ships in order to facilitate the safe connection and operation of loading arms and gantries. The operations technician will complete all necessary documentation for the control and calculation of product volumes.

Generally the operations technician would be part of a team during loading activities and may be expected to be capable of performing all parts of this unit. At all times they would be liaising and cooperating with other members of the team.

This unit applies to products such as liquefied natural gas (LNG), liquefied petroleum gas (LPG), oil, chemicals and particulates.

In a typical scenario, the operations technician is responsible for the custody transfer of materials/products from the loading area to vessels or from vessels to storage areas. The operations technician will report the state of readiness of the loading facilities before starting transfer to the loading master and to the terminal operator.

You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)

Prerequisites

Not applicable


Co-Requisites

Not applicable


Employability Skills

This unit contains employability skills.




Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

The Evidence Guide provides advice on assessment and must be read in conjunction with the Performance Criteria, Required Skills and Knowledge, the Range Statement and the Assessment Guidelines for the Training Package.

Overview of assessment

Assessment of this unit should include demonstrated competence on actual plant and equipment in a work environment. The unit will be assessed in as holistic a manner as is practical and may be integrated with the assessment of other relevant units of competency. Assessment will occur over a range of situations, which will include disruptions to normal, smooth operation.

Simulation may be required to allow for assessment of parts of this unit. Simulation should be based on the actual plant and will include walk-throughs of the relevant competency components. Simulations may also include the use of case studies/scenarios, role plays and 3-D virtual reality interactive systems. In the case of evacuation training or of training for competencies practised in life threatening situations, simulation may be used for the bulk of the training.

This unit of competency requires an application of the knowledge contained in the use of ship loading and its integral equipment, to the level needed to maintain control and recognise and resolve problems. This can be assessed through questioning and the use of what-if scenarios both on the plant (during demonstration of normal operations and walk-throughs of abnormal operations) and off the plant.

Critical aspects for assessment and evidence required to demonstrate competency in this unit

Competence must be demonstrated in the ability to recognise and analyse potential situations requiring action and then in implementing appropriate corrective action. The emphasis should be on the ability to stay out of trouble rather than on recovery from a disaster.

Consistent performance should be demonstrated. In particular look to see that:

early warning signs of equipment/processes needing attention or with potential problems are recognised

the range of possible causes can be identified and analysed and the most likely cause determined

appropriate action is taken to ensure a timely return to full performance

obvious problems in related plant areas are recognised and an appropriate contribution made to their solution.

These aspects may be best assessed using a range of scenarios/case studies/what-ifs as the stimulus with a walk-through forming part of the response. These assessment activities should include a range of problems, including new, unusual and improbable situations which may have been generated from the past incident history of the plant, incidents on similar plants around the world, hazard analysis activities and similar sources.

Context of and specific resources for assessment

Assessment will require access to an operating plant over an extended period of time, or a suitable method of gathering evidence of operating ability over a range of situations. A bank of scenarios/case studies/what-ifs will be required as will a bank of questions which will be used to probe the reasoning behind the observable actions.

Method of assessment

In all plants it may be appropriate to assess this unit concurrently with relevant teamwork and communication units. Consider co-assessment with relevant fluid flow and tank farming units.

Guidance information for assessment

Assessment processes and techniques must be culturally appropriate and appropriate to the oracy, language and literacy capacity of the assessee and the work being performed.


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assingnment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

This describes the essential skills and knowledge and their level, required for this unit.

Required skills

Competence includes the ability to isolate the causes of problems to an item of equipment within the compressor system and distinguish between causes of problems/alarm/fault indications, such as:

instrument failure/wrong reading

electrical failure

mechanical failure

operational problems

metering problems

spills/leaks

meteorological events

Required knowledge

The knowledge referred to in the Evidence Guide for this unit includes:

all items on a schematic of the ship loading/unloading system and the function of each

the nature/condition of materials being transferred to and from the vessel and the factors to be considered in the transfer operation

effects of temperature and pressure in transfer operations

storage and product transfer techniques and mediums

principles of operation of plant/equipment

physics and chemistry relevant to the process unit and the materials/products being transferred

process parameters and limits (e.g. temperature, pressure, flow, pH and amps)

duty of care obligations

hierarchy of control

communication protocols (e.g. radio, phone, computer, paper and permissions/authorities)

routine problems, faults and their resolution

relevant alarms and actions

plant process idiosyncrasies

correct methods of starting, stopping, operating and controlling flow

corrective action appropriate to the problem cause

function and troubleshooting of major internal components and their problems

types and causes of flow problems within operator's scope of skill level and responsibility

The Range Statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the Performance Criteria, is detailed below. Add any essential operating conditions that may be present with training and assessment depending on the work situation, needs if the candidate, accessibility of the item, and local industry and regional contexts.

Codes of practice/ standards

Where reference is made to industry codes of practice, and/or Australian/international standards, the latest version must be used.

Context

This unit of competency includes all items of equipment and unit operations which form part of the ship loading/unloading system. For your plant this may include (select relevant items):

loading/unloading systems

loading arms

gantries

fire extinguishers, hoses and jets

gas and other hazard monitoring systems

mooring lines

compressors

storage tanks

pipelines, trunklines and conveyors

pig launcher, pig trap and batching pigs

measurement systems

Typical problems

Typical problems for your plant may include:

surging

control of temperature and pressure

variations in feed

product leakage

environmental hazards

Ship transfer

Ship transfer includes:

the transfer of product or materials to or from ships (i.e. loading or unloading of ships)

Ready for transfer

Ready for transfer includes:

secured and properly moored

transfer points aligned

Safety systems

Safety systems include systems required to protect the vessel and personnel during product transfer, such as:

deluge

fire protection

Operational conditions for transfer

Operational conditions for transfer include:

connect and initiate loading pumps/conveyors

arms/hoses

Control of transfer rates

Transfer rates may be controlled to ensure:

the product is transferred safely

transfer is within the defined storage capacities

Appropriate action

Appropriate action includes:

determining problems needing action

determining possible fault causes

rectifying problem using appropriate solution within area of responsibility

following through items initiated until final resolution has occurred

reporting problems outside area of responsibility to designated person

Procedures

Procedures may be written, verbal, computer-based or in some other form. They include:

all work instructions

standard operating procedures

formulas/recipes

batch sheets

temporary instructions

any similar instructions provided for the smooth running of the plant

For the purposes of this Training Package, 'procedures' also includes good operating practice as may be defined by industry codes of practice (e.g. Responsible Care) and government regulations.

Health, safety and environment (HSE)

All operations to which this unit applies are subject to stringent HSE requirements, which may be imposed through state or federal legislation, and these must not be compromised at any time. Where there is an apparent conflict between performance criteria and HSE requirements, the HSE requirements take precedence.

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Identify work requirements 
Identify and control hazards 
Coordinate with appropriate personnel 
Check that the vessel is ready for product transfer 
Activate/bring on line all safety systems 
Ensure all operational conditions for transfer of product are satisfied 
Ensure safety check documentation is completed. 
Check transfer advice/documentation and complete required records 
Engage fire and deluge protection systems as required 
Launch and retrieve batching pigs as required 
Start pumps to commence the transfer process of the specified product 
Control and monitor transfer rates and take appropriate action 
Monitor the progress of the transfer and tank levels and take appropriate action 
Identify vapour or product leakages/spills and take appropriate action 
Apply emergency procedures as required. 
Achieve or satisfy capacities and transfer requirements within the allowable timeframes and schedules 
Retrieve batching pigs as required 
Decommission, isolate and disengage transfer pumps and arms/hoses from or to the vessel as required 
Continue to monitor and control fire, deluge and safety systems during the finalisation of the loading process and let-go of the vessel as required 
Complete all required logs and documentation and communicate the results of the transfer to the appropriate personnel 
Shut down and bring transfer facilities off line, ensuring that the area has been made safe after the transfer has been completed. 
Isolate plant 
Make safe for required work 
Check plant is ready to be returned to service 
Prepare plant for return to service. 
Identify work requirements 
Identify and control hazards 
Coordinate with appropriate personnel 

Forms

Assessment Cover Sheet

PMAOPS312B - Undertake ship loading_unloading operations
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

PMAOPS312B - Undertake ship loading_unloading operations

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: