• PMASUP420B - Minimise environmental impact of process

Assessor Resource

PMASUP420B
Minimise environmental impact of process

Assessment tool

Version 1.0
Issue Date: March 2024


In this competency, an operator would develop practices or procedures for:

conserving resources

minimising pollution

minimising waste.

This requires the operator to have a good understanding of the resources used by the plant, the nature and source of pollutants and the waste materials produced by the plant. It also requires the operator to understand the impact of using resources, and the effect pollutants and waste can have on the local environment.

When developing a process or practice, the operator would identify which resource, pollutant or waste product that if reduced would give the most benefit. After developing procedures to conserve resources or minimise pollution/waste produced by the plant, the operator would then document the procedures to implement the changes.

This competency covers minimising waste and environmental threats from a plant and/or a process. It covers all resources used and products made by the plant, and is performed by more experienced operators who might be expected to develop and implement improvements to processes within the plant. This unit may be performed individually or as part of a team.

This competency also applies to capital projects, as well as improvements brought about by changes in work practices and procedures

You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)

Employability Skills

This unit contains employability skills.




Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

The Evidence Guide provides advice on assessment and must be read in conjunction with the Performance Criteria, Required Skills and Knowledge, the Range Statement and the Assessment Guidelines for the Training Package.

Overview of assessment

Assessment of this unit should include demonstrated competence on actual plant and equipment in a work environment. The unit will be assessed in as holistic a manner as is practical and may be integrated with the assessment of other relevant units of competency. Assessment will occur over a range of situations which will include disruptions to normal, smooth operation.

Assessment of this unit may be best achieved with a suitable project. This will minimise possible impact on the environment caused by the process or some aspect of the process. Such a project may be regarded as adequate provided it meets all the Performance Criteria of at least one Element. It is not necessary to cover all elements.

This unit of competency requires a significant body of knowledge which will be assessed through questioning and the use of what-if scenarios both on the plant (during demonstration of normal operations and walk-throughs of abnormal operations) and off the plant.

Critical aspects for assessment and evidence required to demonstrate competency in this unit

Competence must be demonstrated in the ability to recognise and analyse potential situations requiring action and then in implementing appropriate corrective action. The emphasis should be on the ability to stay out of trouble rather than on recovery from a disaster.

Consistent performance should be demonstrated. In particular look to see that:

procedures are developed to reduce the consumption of resources, or to minimise pollution and/or waste products

appropriate documentation is completed to implement changes

the greatest yield is achieved by appropriate selection of type of resource usage, type of pollutant or waste product.

These aspects may be best assessed using a range of scenarios/case studies/what-ifs as the stimulus with a walk-through forming part of the response. These assessment activities should include a range of problems, including new, unusual and improbable situations which may have been generated from the past incident history of the plant, incidents on similar plants around the world, hazard analysis activities and similar sources.

Context of and specific resources for assessment

Assessment will require access to an operating plant over an extended period of time, or a suitable method of gathering evidence of operating ability over a range of situations. A bank of scenarios/case studies/what-ifs will be required as will a bank of questions which will be used to probe the reasoning behind the observable actions.

Method of assessment

In all plants it may be appropriate to assess this unit concurrently with relevant teamwork and communication units. Consider co-assessment with:

Competency units relevant to the type of process equipment.

In a major hazard facility, it may be appropriate to assess this unit concurrently with OHS units.

Guidance information for assessment

Assessment processes and techniques must be culturally appropriate and appropriate to the oracy, language and literacy capacity of the assessee and the work being performed.


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assingnment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

This describes the essential skills and knowledge and their level, required for this unit.

Required skills

Competence to also include the ability to apply and explain:

nature and severity of potential environmental hazards caused by the plant/process

sensitivity of local environment to these environmental threats

pathways of entry to the environment from the plant

regulatory requirements such as environment protection regulations, OHS, HAZCHEM, duty of care, dangerous goods

external licensing requirements such as EPA, water authorities, local councils

enterprise procedures and practices.

Required knowledge

Knowledge and understanding of the control of environmental incident process and the importance of critical parameters enough to minimise waste and environmental threats from a plant and/or a process within an organisation.

The Range Statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the Performance Criteria, is detailed below. Add any essential operating conditions that may be present with training and assessment depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts.

Codes of practice/ standards

Where reference is made to industry codes of practice, and/or Australian/international standards, the latest version must be used.

Context

This competency is performed by more experienced operators and may be performed individually or as part of a team. It includes the following indicative functions:

examining plant records

examining operating procedures and practices

liaising with a range of internal people

modifying/updating standard operating procedures to 'lock in' any changes.

Typical objectives will include:

minimisation of waste

maximisation of product yield from raw materials

reduction in volume of pollutants made

reduction in concentration/intensity of pollutants made

reduction in emissions.

All operations are performed in accordance with standard procedures and policies.

Health, safety and environment (HSE)

All operations to which this unit applies are subject to stringent health, safety and environment requirements, which may be imposed through State or Federal legislation, and these must not be compromised at any time. Where there is an apparent conflict between Performance Criteria and HSE requirements, the HSE requirements take precedence.

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Identify the nature of resources used in the plant/process 
Determine the primary source of these resources 
Describe the impact of the depletion of these resources on the environment and society 
Determine which resource(s) will yield a greater benefit from their conservation 
Develop methods to reduce the consumption of these resources 
Complete required documentation to implement change 
Identify the nature of pollutants produced by the plant/process 
Determine the source(s) of these pollutants within the plant/process 
Describe the impact of these pollutants on the environment and society 
Determine which pollutant(s) will yield a greater benefit from their reduction 
Develop methods to reduce the production of this pollutant 
Complete required documentation to implement change. 
Identify the nature of wastes produced by the plant/process 
Determine the source(s) of these wastes within the plant/process 
Describe the impact of these wastes on the environment and society 
Determine which waste(s) will yield a greater benefit from their reduction 
Develop methods to reduce the production of this waste 
Complete required documentation to implement change. 

Forms

Assessment Cover Sheet

PMASUP420B - Minimise environmental impact of process
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

PMASUP420B - Minimise environmental impact of process

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: