Lay up rubber lining or lag pulleys

Assessment tool

Version 1.0
Issue Date: March 2024


This unit of competency covers the skills and knowledge required to lay up rubber or similar materials to line vessels or components or to lag pulleys. Vessels and tanks are typically lined in order to retard abrasion, impact or corrosion. The re-lagging of pulleys for conveyors provides a positive drive.

This unit of competency applies to operators who are required to prepare materials and surfaces, plan and sequence the work, position, join and cure the lining/lagging and recognise routine and non-routine problems and take appropriate action.

The key factors are the preparation of the surfaces to be lined/lagged and the successful application of the rubber to the surfaces without contaminating the materials. This unit of competency is typically performed by operators working either independently or as part of a work team.

This unit of competency applies to lining/lagging that is carried out in a workshop or other off-site facility.

No licensing, legislative or certification requirements apply to this unit at the time of publication.

You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)



Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Plan rubber lining or lagging work

1.1

Review specifications and work order documentation

1.2

Identify hazards and risk controls, including emergency evacuation and adequate ventilation, including breathing apparatus, where required

1.3

Plan work, including materials, sequences, times and process stages

1.4

Plan to minimise downtime, economically use materials and meet repair quality specifications

1.5

Assemble equipment, tools and materials required, checking them for condition, quality and compliance tags

2

Prepare surfaces for rubber lining or lagging

2.1

Lay out materials in an appropriate contamination free area

2.2

Ensure materials are clean and free of debris and damage

2.3

Identify non-conforming materials and report, as required

2.4

Examine component, vessel or pulley and ensure the surfaces to be lined or lagged are free of defects and contaminants

2.5

Plan the sequence for application of the adhesives and materials

2.6

Prepare lining or lagging surfaces

2.7

Monitor surface coatings for setting time and manage the staggered supply of adhesives and materials, where appropriate

3

Lay up rubber lining or lagging

3.1

Ensure adequate ventilation is provided and monitored during the laying up process

3.2

Monitor any confined space activity and conform to regulations and procedures

3.3

Position lining/lagging segments according to the lay-up plan

3.4

Exclude entrapped air and ensure complete contact between the lining/lagging and surface is obtained

3.5

Ensure joins are sealed and adhered properly with no gaps or overlaps

3.6

Check for slips, sagging or other separation of the lining/lagging from the surface

3.7

Ensure lining/lagging material is finished off as required at the extremities

3.8

Cure rubber lining/lagging where appropriate

4

Clean work area

4.1

Clean, inspect and store tools and equipment used

4.2

Tag unserviceable tools and equipment, identify faults and inform relevant personnel

4.3

Clean work area and return to approved condition

4.4

Dispose of waste or recycle according to procedures

4.5

Complete appropriate workplace documentation

5

Respond to routine problems to procedures

5.1

Recognise known faults that occur during the operation

5.2

Identify and take action on causes of routine faults

5.3

Log problems as required

5.4

Identify non-routine process and quality problems and take appropriate action

Evidence required to demonstrate competence in this unit must be relevant to and satisfy the requirements of the elements and performance criteria and demonstrate the ability to:

read and interpret procedures, job specifications, material labels and safety data sheets (SDS)

select and use tools, equipment and materials to meet job specifications

prepare surfaces, adhesives and materials

lay up, join and cure lining or lagging to meet specifications

monitor equipment operation

monitor key variables, including:

compatibility of materials, adhesives, solvents and cleaning agents

cleanliness and condition of lining/lagging materials

effect of surface condition of the component on the quality of the lining/lagging

identify hazards and apply relevant hazard controls

apply safety procedures

apply housekeeping procedures

apply waste management procedures

recognise routine and non-routine problems

identify when the operator is able to rectify faults, when assistance is required and who is the appropriate source for assistance

take action to resolve faults or report faults to appropriate personnel

distinguish between possible causes of routine faults, including:

wrong raw materials/additives/catalyst

incorrect quantity of materials/additives/catalyst

contaminated materials/additives/catalyst

procedural errors

equipment malfunction/failures

communicate effectively with team/work group and supervisors

complete workplace records

do basic arithmetical manipulations, including additions, subtractions, divisions and multiplications

make and interpret measurements and shapes.

Must provide evidence that demonstrates knowledge relevant to their job sufficient to operate under routine only supervision and to solve routine problems, including knowledge of:

types of adhesives, additives and catalysts commonly used in lining or lagging and their suitability for different materials and applications

the potential effects of variations in raw materials and equipment operation in relation to quality of product

factors which may affect product quality or production output and appropriate remedies

routine problems, their probable causes and relevant corrective actions

organisation procedures relevant to the work environment/job role

hierarchy of control

hazards that may arise in the job/work environment and:

their possible causes

potential consequences

appropriate risk controls.

The unit should be assessed holistically and the judgement of competence shall be based on a holistic assessment of the evidence.

In all plants it may be appropriate to assess this unit concurrently with units such as:

teamwork

communication.

The collection of performance evidence:

should occur over a range of situations which include typical disruptions to normal, smooth operations and provide for demonstration of responding to problems

will typically include a supervisor/third-party report or other evidence, focusing on consistent performance and problem recognition and solving. A supervisor/third-party report must be prepared by someone who has a direct, relevant, current relationship with the person being assessed and who is in a position to form a judgement on workplace performance relevant to the unit of competency

must include the use of industry appropriate materials, tools, equipment, data and documentation

may use industry-based simulation for all or part of the unit particularly where safety, lack of opportunity or significant cost is an issue.

Assessment should occur in operational workplace situations. Where this is not possible or where personal safety or environmental damage are limiting factors assessment must occur in a sufficiently rigorous simulated environment that reflects realistic operational workplace conditions. This must cover all aspects of workplace performance, including environment, task skills, task management skills, contingency management skills and job role environment skills.

Assessment in a simulated environment should use evidence collected from demonstration of skills and one or more of:

walk-throughs

pilot plant operation

industry-based case studies/scenarios

‘what ifs’.

Knowledge evidence may be collected concurrently with performance evidence or through an independent process, such as workbooks, written assessments or interviews.

Assessment processes and techniques must be appropriate to the language, literacy and numeracy requirements of the work being performed and the needs of the candidate.

Conditions for assessment must include access to all tools, equipment, materials and documentation required, including relevant workplace procedures, product and manufacturing specifications associated with this unit.

The regulatory framework will be reflected in workplace policies and procedures and is not required to be independently assessed.

Foundation skills are integral to competent performance of the unit and should not be assessed separately.

Assessors must satisfy the assessor competency requirements that are in place at the time of the assessment as set by the VET regulator.

In addition the assessor or anyone acting in subject matter expert role in assessment shall demonstrate both technical competency and currency. If the assessor cannot demonstrate technical competency and currency they shall assess with a subject matter expert who does meet these requirements.

Technical competence can be demonstrated through one or more of:

relevant VET or other qualification/Statement of Attainment

appropriate workplace experience undertaking the type of work being assessed under routine and non-routine conditions

appropriate workplace experience supervising/evaluating the type of work being assessed under routine and non-routine conditions

Currency can be demonstrated through one or more of:

being currently employed undertaking the type of work being assessed

being employed by the organisation undertaking the type of work being assessed and having maintained currency in accordance with that organisation’s policies and procedures

having consulted/had contact with an organisation undertaking the type of work being assessed within the last twelve months, the consultation/contact being related to assessment

conducting on the job training/assessments of the type of work being assessed

being an active member of a relevant professional body and participating in activities relevant to the assessment of this type of work.


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assingnment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Plan rubber lining or lagging work

1.1

Review specifications and work order documentation

1.2

Identify hazards and risk controls, including emergency evacuation and adequate ventilation, including breathing apparatus, where required

1.3

Plan work, including materials, sequences, times and process stages

1.4

Plan to minimise downtime, economically use materials and meet repair quality specifications

1.5

Assemble equipment, tools and materials required, checking them for condition, quality and compliance tags

2

Prepare surfaces for rubber lining or lagging

2.1

Lay out materials in an appropriate contamination free area

2.2

Ensure materials are clean and free of debris and damage

2.3

Identify non-conforming materials and report, as required

2.4

Examine component, vessel or pulley and ensure the surfaces to be lined or lagged are free of defects and contaminants

2.5

Plan the sequence for application of the adhesives and materials

2.6

Prepare lining or lagging surfaces

2.7

Monitor surface coatings for setting time and manage the staggered supply of adhesives and materials, where appropriate

3

Lay up rubber lining or lagging

3.1

Ensure adequate ventilation is provided and monitored during the laying up process

3.2

Monitor any confined space activity and conform to regulations and procedures

3.3

Position lining/lagging segments according to the lay-up plan

3.4

Exclude entrapped air and ensure complete contact between the lining/lagging and surface is obtained

3.5

Ensure joins are sealed and adhered properly with no gaps or overlaps

3.6

Check for slips, sagging or other separation of the lining/lagging from the surface

3.7

Ensure lining/lagging material is finished off as required at the extremities

3.8

Cure rubber lining/lagging where appropriate

4

Clean work area

4.1

Clean, inspect and store tools and equipment used

4.2

Tag unserviceable tools and equipment, identify faults and inform relevant personnel

4.3

Clean work area and return to approved condition

4.4

Dispose of waste or recycle according to procedures

4.5

Complete appropriate workplace documentation

5

Respond to routine problems to procedures

5.1

Recognise known faults that occur during the operation

5.2

Identify and take action on causes of routine faults

5.3

Log problems as required

5.4

Identify non-routine process and quality problems and take appropriate action

This field allows for different work environments and conditions that may affect performance. Essential operating conditions that may be present (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) are included.

Regulatory framework

The latest version of all legislation, regulations, industry codes of practice and Australian/international standards, or the version specified by the local regulatory authority, must be used.

Applicable legislation, regulations, standards and codes of practice include:

health, safety and environmental (HSE) legislation, regulations and codes of practice relevant to the workplace, equipment and production processes and hazardous materials

Australian/international standards relevant to the materials being used and products being made

any relevant licence and certification requirements.

All operations to which this unit applies are subject to stringent HSE requirements, which may be imposed through state/territory or federal legislation, and these must not be compromised at any time. Where there is an apparent conflict between performance criteria and such requirements the legislative requirements take precedence.

Procedures

All operations must be performed in accordance with relevant procedures.

Procedures are written, verbal, visual, computer-based or in some other form, and include one or any combination of:

emergency procedures

work instructions

standard operating procedures (SOPs)

safe work method statements (SWMS)

formulae/recipes

batch sheets

temporary instructions

any similar instructions provided for the smooth running of the plant.

Tools and equipment

Tools and equipment include one or more of:

hand tools (e.g. spanners, wrenches and hammers)

knives and other trimming devices

hoists/lifting equipment not requiring any special permits or licences

rollers and other surface compression tools

ventilation equipment (e.g. fans)

relevant personal protective equipment (PPE).

Hazards

Hazards must be identified and controlled. Identifying hazards requires consideration of:

confined spaces

working at heights

blades and cutting equipment

weight, shape, volume of materials to be handled

hazardous products and materials

sharp edges, protrusions or obstructions

slippery surfaces, spills or leaks

rotational equipment or vibration

smoke, dust, vapours or other atmospheric hazards

electricity

gas

gases and liquids under pressure

structural hazards

equipment failures

machinery, equipment and product mass

other hazards that might arise.

Routine problems

Routine problems must be resolved by applying known solutions.

Routine problems are predictable and include one or more of:

variations in materials

incorrectly cut material shapes

contamination of materials

contamination of the surfaces to be lined or lagged

physical size and complexity of some components

entrapped air

gaps between lining segments

inappropriate laps or joins.

Known solutions are drawn from one or more of:

procedures

training

remembered experience.

Non-routine problems must be reported according to according to relevant procedures.

Evidence required to demonstrate competence in this unit must be relevant to and satisfy the requirements of the elements and performance criteria and demonstrate the ability to:

read and interpret procedures, job specifications, material labels and safety data sheets (SDS)

select and use tools, equipment and materials to meet job specifications

prepare surfaces, adhesives and materials

lay up, join and cure lining or lagging to meet specifications

monitor equipment operation

monitor key variables, including:

compatibility of materials, adhesives, solvents and cleaning agents

cleanliness and condition of lining/lagging materials

effect of surface condition of the component on the quality of the lining/lagging

identify hazards and apply relevant hazard controls

apply safety procedures

apply housekeeping procedures

apply waste management procedures

recognise routine and non-routine problems

identify when the operator is able to rectify faults, when assistance is required and who is the appropriate source for assistance

take action to resolve faults or report faults to appropriate personnel

distinguish between possible causes of routine faults, including:

wrong raw materials/additives/catalyst

incorrect quantity of materials/additives/catalyst

contaminated materials/additives/catalyst

procedural errors

equipment malfunction/failures

communicate effectively with team/work group and supervisors

complete workplace records

do basic arithmetical manipulations, including additions, subtractions, divisions and multiplications

make and interpret measurements and shapes.

Must provide evidence that demonstrates knowledge relevant to their job sufficient to operate under routine only supervision and to solve routine problems, including knowledge of:

types of adhesives, additives and catalysts commonly used in lining or lagging and their suitability for different materials and applications

the potential effects of variations in raw materials and equipment operation in relation to quality of product

factors which may affect product quality or production output and appropriate remedies

routine problems, their probable causes and relevant corrective actions

organisation procedures relevant to the work environment/job role

hierarchy of control

hazards that may arise in the job/work environment and:

their possible causes

potential consequences

appropriate risk controls.

The unit should be assessed holistically and the judgement of competence shall be based on a holistic assessment of the evidence.

In all plants it may be appropriate to assess this unit concurrently with units such as:

teamwork

communication.

The collection of performance evidence:

should occur over a range of situations which include typical disruptions to normal, smooth operations and provide for demonstration of responding to problems

will typically include a supervisor/third-party report or other evidence, focusing on consistent performance and problem recognition and solving. A supervisor/third-party report must be prepared by someone who has a direct, relevant, current relationship with the person being assessed and who is in a position to form a judgement on workplace performance relevant to the unit of competency

must include the use of industry appropriate materials, tools, equipment, data and documentation

may use industry-based simulation for all or part of the unit particularly where safety, lack of opportunity or significant cost is an issue.

Assessment should occur in operational workplace situations. Where this is not possible or where personal safety or environmental damage are limiting factors assessment must occur in a sufficiently rigorous simulated environment that reflects realistic operational workplace conditions. This must cover all aspects of workplace performance, including environment, task skills, task management skills, contingency management skills and job role environment skills.

Assessment in a simulated environment should use evidence collected from demonstration of skills and one or more of:

walk-throughs

pilot plant operation

industry-based case studies/scenarios

‘what ifs’.

Knowledge evidence may be collected concurrently with performance evidence or through an independent process, such as workbooks, written assessments or interviews.

Assessment processes and techniques must be appropriate to the language, literacy and numeracy requirements of the work being performed and the needs of the candidate.

Conditions for assessment must include access to all tools, equipment, materials and documentation required, including relevant workplace procedures, product and manufacturing specifications associated with this unit.

The regulatory framework will be reflected in workplace policies and procedures and is not required to be independently assessed.

Foundation skills are integral to competent performance of the unit and should not be assessed separately.

Assessors must satisfy the assessor competency requirements that are in place at the time of the assessment as set by the VET regulator.

In addition the assessor or anyone acting in subject matter expert role in assessment shall demonstrate both technical competency and currency. If the assessor cannot demonstrate technical competency and currency they shall assess with a subject matter expert who does meet these requirements.

Technical competence can be demonstrated through one or more of:

relevant VET or other qualification/Statement of Attainment

appropriate workplace experience undertaking the type of work being assessed under routine and non-routine conditions

appropriate workplace experience supervising/evaluating the type of work being assessed under routine and non-routine conditions

Currency can be demonstrated through one or more of:

being currently employed undertaking the type of work being assessed

being employed by the organisation undertaking the type of work being assessed and having maintained currency in accordance with that organisation’s policies and procedures

having consulted/had contact with an organisation undertaking the type of work being assessed within the last twelve months, the consultation/contact being related to assessment

conducting on the job training/assessments of the type of work being assessed

being an active member of a relevant professional body and participating in activities relevant to the assessment of this type of work.

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Review specifications and work order documentation 
Identify hazards and risk controls, including emergency evacuation and adequate ventilation, including breathing apparatus, where required 
Plan work, including materials, sequences, times and process stages 
Plan to minimise downtime, economically use materials and meet repair quality specifications 
Assemble equipment, tools and materials required, checking them for condition, quality and compliance tags 
Lay out materials in an appropriate contamination free area 
Ensure materials are clean and free of debris and damage 
Identify non-conforming materials and report, as required 
Examine component, vessel or pulley and ensure the surfaces to be lined or lagged are free of defects and contaminants 
Plan the sequence for application of the adhesives and materials 
Prepare lining or lagging surfaces 
Monitor surface coatings for setting time and manage the staggered supply of adhesives and materials, where appropriate 
Ensure adequate ventilation is provided and monitored during the laying up process 
Monitor any confined space activity and conform to regulations and procedures 
Position lining/lagging segments according to the lay-up plan 
Exclude entrapped air and ensure complete contact between the lining/lagging and surface is obtained 
Ensure joins are sealed and adhered properly with no gaps or overlaps 
Check for slips, sagging or other separation of the lining/lagging from the surface 
Ensure lining/lagging material is finished off as required at the extremities 
Cure rubber lining/lagging where appropriate 
Clean, inspect and store tools and equipment used 
Tag unserviceable tools and equipment, identify faults and inform relevant personnel 
Clean work area and return to approved condition 
Dispose of waste or recycle according to procedures 
Complete appropriate workplace documentation 
Recognise known faults that occur during the operation 
Identify and take action on causes of routine faults 
Log problems as required 
Identify non-routine process and quality problems and take appropriate action 

Forms

Assessment Cover Sheet

PMBPROD241 - Lay up rubber lining or lag pulleys
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

PMBPROD241 - Lay up rubber lining or lag pulleys

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: