This unit of competency applies to operators who install and/or repair mouldable refractory materials. Moulded refractory may be the total requirements for the job, or it may need to join to brick/block or cast refractory.

This unit does NOT cover the installation of brick/block or cast refractory, refer to PMC552091B Prepare for, install and repair refractory brickwork/blockwork or PMC552093B Prepare for and cast refractory materials.

This competency also includes the mixing and application of refractory mortars as part of the installation.

This competency will typically be performed by a team of operators working under direction and to a specification and/or procedures.

This unit of competency covers the installation of mouldable refractory. It includes the use of tools and ancillary equipment and the mixing and application of appropriate mortars.

You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)

Employability Skills

This unit contains employability skills.




Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

The Evidence Guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.

Overview of assessment

The unit will be assessed in as holistic a manner as is practical and may be integrated with the assessment of other relevant units of competency.

Critical aspects for assessment and evidence required to demonstrate competency in this unit

Competence must be demonstrated in the ability to recognise situations requiring action and then in implementing appropriate corrective action. Consistent performance should be demonstrated. In particular look to see that:

signs of problems or potential problems with the equipment/processes are recognised

appropriate action is taken in a timely manner

hazards are recognised and appropriate action is taken to control risks arising from such hazards.

Context of and specific resources for assessment

Assessment will require access to an operating plant over an extended period of time, or a suitable method of gathering evidence of operating ability over a range of situations.

Assessment will occur over a range of situations which will include disruptions to normal, smooth operation.

Simulation or case studies/scenarios may be required to allow for timely assessment of parts of this unit of competency. Simulation should be based on the actual plant and will include 'walk-throughs' of the relevant competency components. A bank of scenarios/case studies/what ifs and questions will be required to probe the reasoning behind observable actions.

Method of assessment

In all plants it may be appropriate to assess this unit concurrently with relevant teamwork and communication units.

Guidance information for assessment

Assessment processes and techniques must be culturally appropriate and appropriate to the language and literacy capacity of the candidate and the work being performed.


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assingnment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Required skills

Required skills include:

adjusting/correcting/responding to work procedures

identifying and solving problems

manual skills

physical handling skills

using tools and equipment correctly and safely

working in a team or individually, as required

reading and numeracy to interpret workplace documents and technical information

Required knowledge

Required knowledge includes:

the organisation's requirements relating to responsibilities for installing mouldable refractory materials

types and characteristics of background surfaces

methods of preparing background surfaces

types, uses and operation of tools and equipment

methods of compacting mouldable materials

effects of under- or over-ramming mouldable materials

reasons for anchors and methods of ensuring compaction of mouldable refractory around the anchors

types and methods of finishing the surface of the installed mouldables

types and uses of temporary support/formwork

methods of protecting work during installation

reasons for, and methods of, providing test panels

methods of cutting

safeguards to take during reinstatement work

methods of removing damaged refractory

methods of keying and bonding new to existing refractories

reasons for, and methods of, obtaining seals between new and existing refractory

materials sources

materials types/categorisation

methods of production

familiarity with installation techniques

familiarity with principles of selection

familiarity with variety of applications

The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

Procedures

All operations are performed in accordance with standard procedures and work instructions

Tools and equipment

Tools and equipment include:

moulding tools

refractory mixing equipment

lifting and placing equipment

equipment allowing access

Installation

Installation includes:

moulding to shape

correct thickness/cover

conforming to required curves and angles while maintain cover

tying mouldable to structure

keying to existing refractory

Occupational health and safety (OHS)

All operations are subject to stringent OHS requirements and these must not be compromised at any time. Where there is an apparent conflict between performance criteria and OHS requirements, the OHS requirements take precedence

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Check all information conforms with resources and pneumatic ramming equipment 
Prepare backgrounds, such as cutting out, demolition and keying 
Organise work to meet work deadlines 
Install refractory to appropriate procedures 
Carry out remedial work to meet the specifications 
Inform the person in charge that installation and any remedial work have been completed 
Store tools and equipment following organisational requirements for current legislation and official guidance 
Identify hazards in work area 
Assess risks arising from those hazards 
Take appropriate action to control risks to procedures and duty of care 

Forms

Assessment Cover Sheet

PMC552092B - Prepare for and install mouldable refractory materials
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

PMC552092B - Prepare for and install mouldable refractory materials

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: