This unit describes a participant’s skills and knowledge required to apply construct formwork and false work on concrete bridges in Civil Construction.

This unit is appropriate for those working in operational roles.

Licensing, legislative, regulatory and certification requirements that apply to this unit can vary between states, territories, and Industry sectors. Relevant information must be sourced prior to application of the unit.

You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)



Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

1. Plan and prepare

1.1 Access, interpret and apply construct formwork and false work on concrete bridges documentation and ensure the work activity is compliant

1.2 Obtain, interpret, clarify and confirm work instructions before proceeding

1.3 Confirm and apply environmental protection and safety requirements

1.4 Obtain, interpret and implement traffic management signage requirements

1.5 Select and check for faults plant, tools and equipment to carry out tasks

1.6 Identify, address and report hazards, risks and environmental issues

2. Prepare for formwork erection

2.1 Identify and confirm location and design of formwork/false work

2.2 Accurately place key set out locations

2.3 Prepare work area and materials for the erection of formwork/false work

2.4 Assemble formwork shutters

2.5 Sequentially erect formwork support system (false work)

2.6 Check scaffolding and/or hand railing where required

2.7 Place bracing of formwork support to maintain rigidity and stability

2.8 Set support system to correct height level, line and tolerance

3. Erect formwork

3.1 Fabricate, position and fix formwork for beams, drop panels and cantilevers into place

3.2 Assemble, erect and fix formwork for walls into place, plumb and to specified tolerance

3.3 Fabricate, position and fix soffit formwork into place

3.4 Fix edge boxing to formwork in correct position and plumb to alignment.

3.5 Brace formwork

3.6 Install cast-ins, inserts and penetration blocks to locations

4. Inspect formwork

4.1 Inspect erected formwork and formwork support system for safety and quality of work

4.2 Remove loose dirt, sawdust and other waste material with due care to welfare of site personnel and public

4.3 Apply release agent to formwork

4.4 Monitor formwork and support system during concrete pour

5. Stripping of formwork

5.1 Obtain approval to remove formwork/false work support

5.2 Carefully remove edge boxing and braces, denail, clean and store/stack

5.3 Back off support system to appropriate height to loosen soffit decking

5.4 Safely and sequentially remove formwork, denail and relocate or store

5.5 Select and install appropriate back propping system, where applicable

6. Clean up

6.1 Clear work area and dispose of or recycle materials

6.2 Clean, check, maintain and store plant, tools and equipment

Evidence is required to be collected that demonstrates a candidate’s competency in this unit. Evidence must be relevant to the roles within this sector’s work operations and satisfy all of the requirements of the performance criteria of this unit and include evidence that the candidate:

locates and applies applicable legislation, documentation, policies and procedures

works effectively with others to undertake and complete the construction of formwork and false work on concrete bridges that meets all of the required outcomes including:

communicating clearly and concisely with others to receive and clarify work instructions

using a range of communication techniques and systems such as signage to advise others of work activity and exclusion zones

demonstrates completion of constructing formwork and false work on concrete bridges that safely, effectively and efficiently meets all of the required outcomes on more than one (1) occasion including:

preparing for formwork erection

erecting and dismantling formwork and false work on concrete multi-span bridge with a minimum length of twenty (20) metres for each:

casting in situ decks

concrete footings/pile caps/abutments

piers and headstocks

inspecting and monitoring erected formwork and support system

The candidate must demonstrate knowledge of the following in applying the construct formwork and false work on concrete bridges through:

applying legislative, organisation and site requirements for:

site and equipment safety requirements

bridge construction and sequencing

formwork and falsework

steel reinforcement

concrete

bracing and loading

structural characteristics of reinforced concrete

working in confined spaces

working at heights and over water

project quality requirements

civil construction terminology

interpreting engineering drawings

equipment types, characteristics, technical capabilities and limitations

operational, maintenance and basic diagnostic procedures

applying site isolation and traffic control responsibilities and authorities

safety data sheets and materials handling methods

JSA/JSEA/safe work method statements

An assessor of this unit must satisfy the requirements of the NVR/AQTF or their successors; and Industry regulations for certification and licensing; and,

this unit must be assessed in the context of this sector’s work environment; and,

this unit must be assessed in compliance with relevant legislation/regulation and using policies, procedures, processes and operational manuals directly related to the industry sector for which it is being assessed; and,

assessment may be conducted in conjunction with the assessment of other Units of Competency; and,

assessment must confirm consistent performance can be applied in a range of relevant workplace circumstances; and,

assessors must demonstrate the performance evidence, and knowledge evidence as outlined in this Unit of Competency, and through the minimum years of current* work experience specified below in an Industry sector relevant to the outcomes of the unit; or,

where the assessor does not meet experience requirements a co-assessment or partnership arrangement must exist between the qualified assessor and an Industry subject matter expert. The Industry subject matter expert should hold the unit being assessed (or an equivalent unit) and/or demonstrate equivalence of skills and knowledge at the unit level. An Industry technical expert must also demonstrate skills and knowledge from the minimum years of current work experience specified below in the Industry sector, including time spent in roles related to the unit being assessed; and,

assessor and Industry subject matter expert requirements differ depending on the Australian Qualifications Framework Level (AQF) of the qualification being assessed and/or Industry Sector as follows:

Industry sector

AQF** Level

Required assessor or Industry subject matter expert experience

Drilling, Metalliferous Mining, Coal Mining, Extractive (Quarrying) and Civil Construction

1

1 Year

2

2 Years

Drilling, Coal Mining and Extractive (Quarrying)

3-6

3 Years

Metalliferous Mining and Civil Construction

3-6

5 Years

Other sectors

Where this Unit is being assessed outside of the Resources and Infrastructure Sectors assessor and/or Industry subject matter expert experience should be in-line with industry standards for the sector in which it is being assessed and where no Industry standard is specified should comply with any relevant regulation.

*Assessors can demonstrate current work experience through employment within Industry in a role relevant to the outcomes of the Unit; or, for external assessors this can be demonstrated through exposure to Industry by conducting frequent site assessments across various locations.

**Where a unit is being delivered outside of a Qualification the first numeric character in the Unit code should be considered to indicate the AQF level


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assingnment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

1. Plan and prepare

1.1 Access, interpret and apply construct formwork and false work on concrete bridges documentation and ensure the work activity is compliant

1.2 Obtain, interpret, clarify and confirm work instructions before proceeding

1.3 Confirm and apply environmental protection and safety requirements

1.4 Obtain, interpret and implement traffic management signage requirements

1.5 Select and check for faults plant, tools and equipment to carry out tasks

1.6 Identify, address and report hazards, risks and environmental issues

2. Prepare for formwork erection

2.1 Identify and confirm location and design of formwork/false work

2.2 Accurately place key set out locations

2.3 Prepare work area and materials for the erection of formwork/false work

2.4 Assemble formwork shutters

2.5 Sequentially erect formwork support system (false work)

2.6 Check scaffolding and/or hand railing where required

2.7 Place bracing of formwork support to maintain rigidity and stability

2.8 Set support system to correct height level, line and tolerance

3. Erect formwork

3.1 Fabricate, position and fix formwork for beams, drop panels and cantilevers into place

3.2 Assemble, erect and fix formwork for walls into place, plumb and to specified tolerance

3.3 Fabricate, position and fix soffit formwork into place

3.4 Fix edge boxing to formwork in correct position and plumb to alignment.

3.5 Brace formwork

3.6 Install cast-ins, inserts and penetration blocks to locations

4. Inspect formwork

4.1 Inspect erected formwork and formwork support system for safety and quality of work

4.2 Remove loose dirt, sawdust and other waste material with due care to welfare of site personnel and public

4.3 Apply release agent to formwork

4.4 Monitor formwork and support system during concrete pour

5. Stripping of formwork

5.1 Obtain approval to remove formwork/false work support

5.2 Carefully remove edge boxing and braces, denail, clean and store/stack

5.3 Back off support system to appropriate height to loosen soffit decking

5.4 Safely and sequentially remove formwork, denail and relocate or store

5.5 Select and install appropriate back propping system, where applicable

6. Clean up

6.1 Clear work area and dispose of or recycle materials

6.2 Clean, check, maintain and store plant, tools and equipment

Evidence is required to be collected that demonstrates a candidate’s competency in this unit. Evidence must be relevant to the roles within this sector’s work operations and satisfy all of the requirements of the performance criteria of this unit and include evidence that the candidate:

locates and applies applicable legislation, documentation, policies and procedures

works effectively with others to undertake and complete the construction of formwork and false work on concrete bridges that meets all of the required outcomes including:

communicating clearly and concisely with others to receive and clarify work instructions

using a range of communication techniques and systems such as signage to advise others of work activity and exclusion zones

demonstrates completion of constructing formwork and false work on concrete bridges that safely, effectively and efficiently meets all of the required outcomes on more than one (1) occasion including:

preparing for formwork erection

erecting and dismantling formwork and false work on concrete multi-span bridge with a minimum length of twenty (20) metres for each:

casting in situ decks

concrete footings/pile caps/abutments

piers and headstocks

inspecting and monitoring erected formwork and support system

The candidate must demonstrate knowledge of the following in applying the construct formwork and false work on concrete bridges through:

applying legislative, organisation and site requirements for:

site and equipment safety requirements

bridge construction and sequencing

formwork and falsework

steel reinforcement

concrete

bracing and loading

structural characteristics of reinforced concrete

working in confined spaces

working at heights and over water

project quality requirements

civil construction terminology

interpreting engineering drawings

equipment types, characteristics, technical capabilities and limitations

operational, maintenance and basic diagnostic procedures

applying site isolation and traffic control responsibilities and authorities

safety data sheets and materials handling methods

JSA/JSEA/safe work method statements

An assessor of this unit must satisfy the requirements of the NVR/AQTF or their successors; and Industry regulations for certification and licensing; and,

this unit must be assessed in the context of this sector’s work environment; and,

this unit must be assessed in compliance with relevant legislation/regulation and using policies, procedures, processes and operational manuals directly related to the industry sector for which it is being assessed; and,

assessment may be conducted in conjunction with the assessment of other Units of Competency; and,

assessment must confirm consistent performance can be applied in a range of relevant workplace circumstances; and,

assessors must demonstrate the performance evidence, and knowledge evidence as outlined in this Unit of Competency, and through the minimum years of current* work experience specified below in an Industry sector relevant to the outcomes of the unit; or,

where the assessor does not meet experience requirements a co-assessment or partnership arrangement must exist between the qualified assessor and an Industry subject matter expert. The Industry subject matter expert should hold the unit being assessed (or an equivalent unit) and/or demonstrate equivalence of skills and knowledge at the unit level. An Industry technical expert must also demonstrate skills and knowledge from the minimum years of current work experience specified below in the Industry sector, including time spent in roles related to the unit being assessed; and,

assessor and Industry subject matter expert requirements differ depending on the Australian Qualifications Framework Level (AQF) of the qualification being assessed and/or Industry Sector as follows:

Industry sector

AQF** Level

Required assessor or Industry subject matter expert experience

Drilling, Metalliferous Mining, Coal Mining, Extractive (Quarrying) and Civil Construction

1

1 Year

2

2 Years

Drilling, Coal Mining and Extractive (Quarrying)

3-6

3 Years

Metalliferous Mining and Civil Construction

3-6

5 Years

Other sectors

Where this Unit is being assessed outside of the Resources and Infrastructure Sectors assessor and/or Industry subject matter expert experience should be in-line with industry standards for the sector in which it is being assessed and where no Industry standard is specified should comply with any relevant regulation.

*Assessors can demonstrate current work experience through employment within Industry in a role relevant to the outcomes of the Unit; or, for external assessors this can be demonstrated through exposure to Industry by conducting frequent site assessments across various locations.

**Where a unit is being delivered outside of a Qualification the first numeric character in the Unit code should be considered to indicate the AQF level

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Access, interpret and apply construct formwork and false work on concrete bridges documentation and ensure the work activity is compliant 
Obtain, interpret, clarify and confirm work instructions before proceeding 
Confirm and apply environmental protection and safety requirements 
Obtain, interpret and implement traffic management signage requirements 
Select and check for faults plant, tools and equipment to carry out tasks 
Identify, address and report hazards, risks and environmental issues 
Identify and confirm location and design of formwork/false work 
Accurately place key set out locations 
Prepare work area and materials for the erection of formwork/false work 
Assemble formwork shutters 
Sequentially erect formwork support system (false work) 
Check scaffolding and/or hand railing where required 
Place bracing of formwork support to maintain rigidity and stability 
Set support system to correct height level, line and tolerance 
Fabricate, position and fix formwork for beams, drop panels and cantilevers into place 
Assemble, erect and fix formwork for walls into place, plumb and to specified tolerance 
Fabricate, position and fix soffit formwork into place 
Fix edge boxing to formwork in correct position and plumb to alignment. 
Brace formwork 
Install cast-ins, inserts and penetration blocks to locations 
Inspect erected formwork and formwork support system for safety and quality of work 
Remove loose dirt, sawdust and other waste material with due care to welfare of site personnel and public 
Apply release agent to formwork 
Monitor formwork and support system during concrete pour 
Obtain approval to remove formwork/false work support 
Carefully remove edge boxing and braces, denail, clean and store/stack 
Back off support system to appropriate height to loosen soffit decking 
Safely and sequentially remove formwork, denail and relocate or store 
Select and install appropriate back propping system, where applicable 
Clear work area and dispose of or recycle materials 
Clean, check, maintain and store plant, tools and equipment 
Access, interpret and apply construct formwork and false work on concrete bridges documentation and ensure the work activity is compliant 
Obtain, interpret, clarify and confirm work instructions before proceeding 
Confirm and apply environmental protection and safety requirements 
Obtain, interpret and implement traffic management signage requirements 
Select and check for faults plant, tools and equipment to carry out tasks 
Identify, address and report hazards, risks and environmental issues 
Identify and confirm location and design of formwork/false work 
Accurately place key set out locations 
Prepare work area and materials for the erection of formwork/false work 
Assemble formwork shutters 
Sequentially erect formwork support system (false work) 
Check scaffolding and/or hand railing where required 
Place bracing of formwork support to maintain rigidity and stability 
Set support system to correct height level, line and tolerance 
Fabricate, position and fix formwork for beams, drop panels and cantilevers into place 
Assemble, erect and fix formwork for walls into place, plumb and to specified tolerance 
Fabricate, position and fix soffit formwork into place 
Fix edge boxing to formwork in correct position and plumb to alignment. 
Brace formwork 
Install cast-ins, inserts and penetration blocks to locations 
Inspect erected formwork and formwork support system for safety and quality of work 
Remove loose dirt, sawdust and other waste material with due care to welfare of site personnel and public 
Apply release agent to formwork 
Monitor formwork and support system during concrete pour 
Obtain approval to remove formwork/false work support 
Carefully remove edge boxing and braces, denail, clean and store/stack 
Back off support system to appropriate height to loosen soffit decking 
Safely and sequentially remove formwork, denail and relocate or store 
Select and install appropriate back propping system, where applicable 
Clear work area and dispose of or recycle materials 
Clean, check, maintain and store plant, tools and equipment 

Forms

Assessment Cover Sheet

RIICBM307D - Construct formwork and false work on concrete bridges
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

RIICBM307D - Construct formwork and false work on concrete bridges

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: