This unit describes a participant’s skills and knowledge required to carry out basic levelling in Civil construction.

This unit is appropriate for those working in operational roles.

Licensing, legislative, regulatory and certification requirements that apply to this unit can vary between states, territories, and Industry sectors. Relevant information must be sourced prior to application of the unit.

You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)



Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

1. Plan and prepare for basic levelling

1.1 Access, interpret and apply basic levelling documentation, and ensure the work activity is complaint

1.2 Obtain, read, interpret, clarify and confirm work requirements

1.3 Identify and address potential risks, hazards and environmental issues, and implement control measures

1.4 Select and wear personal protective equipment appropriate for work activities

1.5 Identify, obtain and implement traffic signage requirements

1.6 Select equipment and/or attachments for work activities, and check for faults and serviceability within specified tolerances

1.7 Identify environmental protection requirements

1.8 Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency

2. Establish offsets to plans and drawings

2.1 Establish offset and recovery pegs from survey controls to specified plans and drawings

2.2 Re-establish earthwork and pavement control lines from offsets and/or recovery pegs

2.3 Establish drainage offsets from survey control

3. Set up and use levelling device

3.1 Identify heights to be transferred/established from project plans or instructions

3.2 Set up and use levelling instruments, and complete levelling

3.3 Transfer heights from the known to the required

3.4 Document results of levelling procedure

4. Conduct housekeeping activities

4.1 Clear work area and dispose of or recycle materials

4.2 Clean and maintain condition of equipment, ensure suitability for use, and address/report issues

4.3 Manage/report hazards, and maintain a safe working environment

4.4 Process written records


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assingnment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

1. Plan and prepare for basic levelling

1.1 Access, interpret and apply basic levelling documentation, and ensure the work activity is complaint

1.2 Obtain, read, interpret, clarify and confirm work requirements

1.3 Identify and address potential risks, hazards and environmental issues, and implement control measures

1.4 Select and wear personal protective equipment appropriate for work activities

1.5 Identify, obtain and implement traffic signage requirements

1.6 Select equipment and/or attachments for work activities, and check for faults and serviceability within specified tolerances

1.7 Identify environmental protection requirements

1.8 Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency

2. Establish offsets to plans and drawings

2.1 Establish offset and recovery pegs from survey controls to specified plans and drawings

2.2 Re-establish earthwork and pavement control lines from offsets and/or recovery pegs

2.3 Establish drainage offsets from survey control

3. Set up and use levelling device

3.1 Identify heights to be transferred/established from project plans or instructions

3.2 Set up and use levelling instruments, and complete levelling

3.3 Transfer heights from the known to the required

3.4 Document results of levelling procedure

4. Conduct housekeeping activities

4.1 Clear work area and dispose of or recycle materials

4.2 Clean and maintain condition of equipment, ensure suitability for use, and address/report issues

4.3 Manage/report hazards, and maintain a safe working environment

4.4 Process written records

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Access, interpret and apply basic levelling documentation, and ensure the work activity is complaint 
Obtain, read, interpret, clarify and confirm work requirements 
Identify and address potential risks, hazards and environmental issues, and implement control measures 
Select and wear personal protective equipment appropriate for work activities 
Identify, obtain and implement traffic signage requirements 
Select equipment and/or attachments for work activities, and check for faults and serviceability within specified tolerances 
Identify environmental protection requirements 
Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency 
Establish offset and recovery pegs from survey controls to specified plans and drawings 
Re-establish earthwork and pavement control lines from offsets and/or recovery pegs 
Establish drainage offsets from survey control 
Identify heights to be transferred/established from project plans or instructions 
Set up and use levelling instruments, and complete levelling 
Transfer heights from the known to the required 
Document results of levelling procedure 
Clear work area and dispose of or recycle materials 
Clean and maintain condition of equipment, ensure suitability for use, and address/report issues 
Manage/report hazards, and maintain a safe working environment 
Process written records 

Forms

Assessment Cover Sheet

RIICCM208D - Carry out basic levelling
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

RIICCM208D - Carry out basic levelling

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: