Assessor Resource

RIICFW302A
Install temporary and permanent rock anchors

Assessment tool

Version 1.0
Issue Date: April 2024


This unit is appropriate for those working in an operational role at worksites within:

Civil construction

This unit covers the installation of temporary and permanent rock anchors in the civil construction industry. It includes planning and preparing, setting up and preparing anchor holes, installing anchors to anchor holes, setting up anchorage assembly to stress anchors, and cleaning up. Licensing, legislative, regulatory and certification requirements that apply to this unit can vary between states, territories, and industry sectors. Relevant information must be sourced prior to application of the unit.

You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)

Prerequisites

Not applicable.


Co-Requisites

Not applicable.


Employability Skills

This unit contains employability skills.




Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.

Overview of assessment

Critical aspects for assessment and evidence required to demonstrate competency in this unit

The evidence required to demonstrate competency in this unit must be relevant to worksite operations and satisfy all of the requirements of the performance criteria, required skills and knowledge and the range statement of this unit and include evidence of the following:

knowledge of the requirements, procedures and instructions for installing temporary and permanent rock anchors

implementation of requirements, procedures and techniques for the safe, effective and efficient completion of temporary and permanent rock anchor installation

working with others to undertake and complete the installation of temporary and permanent rock anchors that meets all of the required outcomes

consistent timely completion of temporary and permanent rock anchor installation that safely, effectively and efficiently meets the required outcomes

installation of a minimum of ten permanent anchor bolts, finished with mesh and shotcrete

installation of a minimum of ten temporary anchor bolts

Context of and specific resources for assessment

This unit must be assessed in the context of the work environment. Where personal safety or environmental damage are limiting factors, assessment may occur in a simulated environment provided it is realistic and sufficiently rigorous to cover all aspects of workplace performance, including task skills, task management skills, contingency management skills and job role environment skills.

Assessment of this competency requires typical resources normally used in a resources and infrastructure sector environment. Selection and use of resources for particular worksites may differ due to the site circumstances.

The assessment environment should not disadvantage the participant. For example, language, literacy and numeracy demands of assessment should not be greater than those required on the job.

Customisation of assessment and delivery environment to sensitively accommodate cultural diversity.

Aboriginal people and other people from a non English speaking background may have second language issues.

Where applicable, physical resources should include equipment modified for people with disabilities. Access must be provided to appropriate learning and/or assessment support when required.

Method of assessment

This unit may be assessed in a holistic way with other units of competency. The assessment strategy for this unit must verify required knowledge and skill and practical application using more than one of the following assessment methods:

written and/or oral assessment of the candidate's required knowledge

observed, documented and/or first hand testimonial evidence of the candidate's:

implementation of appropriate requirement, procedures and techniques for the safe, effective and efficient achievement of required outcomes

consistent achievement of required outcomes

first hand testimonial evidence of the candidate's:

working with others to undertake and complete the installation of temporary and permanent rock anchors

Guidance information for assessment

Consult the SkillsDMC User Guide for further information on assessment including access and equity issues.


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assingnment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Required skills

Specific skills are required to achieve the Performance Criteria of this unit, particularly for its application in the various circumstances in which this unit may be used. This includes the ability to carry out the following, as required to install temporary and permanent rock anchors:

apply legislative, organisation and site requirements and procedures for installing temporary and permanent rock anchors

apply legislative, organisation and site requirements and procedures for conducting earthworks

organise work activities

select and use relevant tools and equipment safely

identify and report on hazards related to the worksite and work activity

communicate effectively to receive and clarify work instructions

Required knowledge

Specific knowledge is required to achieve the Performance Criteria of this unit, particularly for its application in the various circumstances in which this unit may be used. This includes knowledge of the following, as required to install temporary and permanent rock anchors:

site and equipment safety requirements

foundation work

temporary and permanent rock anchors and their installation techniques

scaffolding and work platform installation

construction principles

processes for interpreting engineering drawings

soil, sand, rock, clay, shale, gravel and silt types and characteristics

water erosion

equipment types, characteristics, technical capabilities and limitations

operational, maintenance and basic diagnostic procedures

site isolation and traffic control responsibilities and authorities

materials safety data sheets and materials handling methods

project quality requirements

civil construction terminology

JSAs/safe work method statements

The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

Relevant compliance documentation may include:

legislative, organisational and site requirements and procedures

manufacturer's guidelines and specifications

Australian standards

Employment and workplace relations legislation

Equal Employment Opportunity and Disability Discrimination legislation

Safety requirements may include:

OHS requirements are to be in accordance with state or territory legislation and regulations, organisational safety policies and procedures, and project safety plan. This may include protective clothing and equipment, use of tools and equipment, workplace environment and safety, handling of materials, use of fire fighting equipment, use of First Aid equipment, hazard control and hazardous materials and substances

safe operating procedures are to include but not be limited to recognising and preventing hazards associated with overhead and underground services, other machines, personnel, traffic control, working in proximity to others, worksite visitors and the public

hazards and risks may include but not be limited to uneven/unstable terrain, trees, fires, overhead and underground services, bridges, buildings, excavations, traffic, embankments, cuttings, structures and hazardous materials

emergency procedures related to equipment operation are to include but may not be limited to emergency shutdown and stopping, extinguishing fires, organisational First Aid requirements and evacuation

Site may include:

cuttings

tunnels

embankments

Signage may include:

escort vehicle

highway traffic signs

site safety signage

temporary signage for the benefit of motorists and pedestrians

barricades

traffic conditions signage

Traffic may include:

congested urban environments

low traffic rural areas

off-road un-trafficked areas

buildings

parking sites

pedestrian areas

Plant, tools and equipment may include:

compressors

pneumatic tools

spanners

drilling rigs

attachments

grouting rigs

Environmental requirements may include:

organisational/project environmental management plan

waste management

water quality protection

noise

vibration

dust and clean-up management

Requirements may include:

ground stabilisation

roof and wall support

stressing

Anchors may include:

anchor bolts

cable anchoring

spiling bars

grouted anchors and bolts

mechanically anchored bolts

dowels

Temporary anchors be required for:

construction processes

stability for temporary structures

stability to operating plant

Materials may include:

anchor bolts

spiling bars

steel cables

ribbed steel bards

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Access, interpret and apply compliance documentation relevant to the work activity 
Obtain, confirm and apply work instructions, including plans, specifications, quality requirements and operational details to the allotted task 
Obtain and confirm safety requirements from the site safety plan and organisational policies and procedures, and apply to the allotted task 
Identify, obtain and implement signage requirements from the project traffic management plan 
Select plant, tools and equipment to carry out tasks consistent with the requirements of the job, check for serviceability and rectify or report any faults 
Identify environmental protection requirements from the project environmental management plan, and confirm and apply to the allotted task 
Check components to verify conformity with job requirements 
Grease, sheathe and assemble anchors to specifications 
Prepare temporary anchors with spacers and fit grout tubes 
Prepare permanent anchors with spacers, fit grout tubes and prepare external polyethylene sheath 
Install anchors and sheaths to full depth, without damage and to specifications 
Set up grouting plant and flow monitoring apparatus to design requirements 
Mix and pump grout into hole 
Check components to verify conformity with job requirements 
Grease, sheathe and assemble anchors to specifications 
Prepare temporary anchors with spacers and fit grout tubes 
Prepare permanent anchors with spacers, fit grout tubes and prepare external polyethylene sheath 
Install anchors and sheaths to full depth, without damage and to specifications 
Set up grouting plant and flow monitoring apparatus to design requirements 
Mix and pump grout into hole 
Correctly place anchorage using packing materials as specified 
Stress anchors to nominated loads 
Lock off anchors to nominated loads as designed 
Install mesh to job specification 
Apply shotcrete to design depth, tolerance and job specification 
Monitor permanent anchors at scheduled intervals to determine and record anchor's residual load 
Cut anchors where required and seal to specification requirements 
Clear work area and dispose of or recycle materials in accordance with project environmental management plan 
Clean, check, maintain and store plant, tools and equipment 

Forms

Assessment Cover Sheet

RIICFW302A - Install temporary and permanent rock anchors
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

RIICFW302A - Install temporary and permanent rock anchors

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: