This unit describes a participant’s skills and knowledge required to install sub-soil drainage in Civil Construction.

This unit is appropriate for those working in operational roles.

Licensing, legislative, regulatory and certification requirements that apply to this unit can vary between states, territories, and Industry sectors. Relevant information much be sourced prior to application of this unit.

You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)



Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

1. Plan and prepare for installing sub-soil drainage

1.1 Access, interpret and apply sub-soil drainage installation documentation and ensure the work activity is complaint

1.2 Obtain, read, interpret, clarify and confirm work requirements

1.3 Identify and address potential risks, hazards and environmental issues, and implement control measures

1.4 Select and wear correct personal protective equipment appropriate for work activities

1.5 Identify, obtain, confirm and implement signage requirements

1.6 Select and check for faults all plant, tools and equipment to carry out tasks

1.7 Plan stock-piling of materials for ease of access and hazard reduction

2. Set out and excavate trenches

2.1 Check trench depths and grades to ensure conformity with plans and specifications

2.2 Set out and clearly mark trench location

2.3 Communicate with plant operator to ensure correct excavation of trenches, placement of shoring and battering

3. Install bedding materials

3.1 Identify bedding material type and depth from plans and specifications

3.2 Lay bedding materials to specified depths and grades

4. Install sub-soil drainage

4.1 Place geo-textile according to specifications

4.2 Prepare drain sections and fittings

4.3 Lay subsoil drain

4.4 Provide inspection opening and flush out points according to plans

4.5 Fit out and/or connect end structures/outlets/clean outs to culverts, storm water or subsoil drain systems

4.6 Install packing and prepare system for backfilling

4.7 Monitor backfill procedure to ensure work completed to specification

5. Clean up

5.1 Clear work area and recycle or dispose of materials

5.2 Clean, check, maintain and store plant, tools and equipment

Evidence is required to be collected that demonstrates a candidate’s competency in this unit. Evidence must be relevant to the roles within this sector’s work operations and satisfy all of the requirements of the performance criteria of this unit and include evidence that the candidate:

locates and applies applicable documentation, policies and procedures

implements the requirements, procedures and techniques for the safe, effective and efficient completion of sub-soil drainage installation including:

accessing, interpreting and applying relevant documentation to the installing sub-soil drainage work activity including relevant drawings and job specifications

identifying, addressing and reporting potential hazards and risks

identifying, obtaining, confirming and implementing signage requirements

selecting and checking for faults all plant, tools and equipment to carry out tasks

identifying, addressing and reporting environmental issues and ground conditions

planning stock-piling of materials for ease of access and hazard reduction

works effectively with others to undertake and complete the installation of sub-soil drainage in a way that meets all of the required outcomes including:

preparing for and organising work activities to meet all task requirements

communicating clearly and concisely with others to receive and clarify work instructions

using a range of communication techniques and aids to advise others of work activity and exclusion zones

monitoring hazards and identifying and communicating changes to the work environment during the work process

demonstrates completion of installing sub-soil drainage that safely, effectively and efficiently meets all of the required outcomes on more than one (1) occasion including:

setting out and excavating trenches to the correct location, depth and grade

installing sub-soil drainage using specified materials and meeting backfill requirements

clearing work area and recycling or disposing of materials

cleaning, checking, maintaining and storing plant, tools and equipment

installation of a minimum of one hundred (100) metres of sub-soil drain in two (2) separate locations, including end structures or outlets to design specifications

The candidate must demonstrate knowledge in installing sub-soil drainage through:

accessing, interpreting and applying, organisation and site requirements and procedures for:

identifying and managing risks

setting up the work activity

utilising signage for creating an exclusion zone

environmental protection

work health and safety

managing waste

selection of appropriate plant, tools and materials

carrying out work to plans and specifications

applying effective installation of sub-soil drainage techniques

An assessor of this unit must satisfy the requirements of the NVR/AQTF or their successors; and Industry regulations for certification and licensing; and,

this unit must be assessed in the context of this sector’s work environment; and,

this unit must be assessed in compliance with relevant legislation/regulation and using policies, procedures, processes and operational manuals directly related to the industry sector for which it is being assessed; and,

assessment may be conducted in conjunction with the assessment of other Units of Competency; and,

assessment must confirm consistent performance can be applied in a range of relevant workplace circumstances; and,

assessors must demonstrate the performance evidence, and knowledge evidence as outlined in this Unit of Competency, and through the minimum years of current* work experience specified below in an Industry sector relevant to the outcomes of the unit; or,

where the assessor does not meet experience requirements a co-assessment or partnership arrangement must exist between the qualified assessor and an Industry subject matter expert. The Industry subject matter expert should hold the unit being assessed (or an equivalent unit) and/or demonstrate equivalence of skills and knowledge at the unit level. An Industry technical expert must also demonstrate skills and knowledge from the minimum years of current work experience specified below in the Industry sector, including time spent in roles related to the unit being assessed; and,

assessor and Industry subject matter expert requirements differ depending on the Australian Qualifications Framework Level (AQF) of the qualification being assessed and/or Industry Sector as follows:

Industry sector

AQF** Level

Required assessor or Industry subject matter expert experience

Drilling, Metalliferous Mining, Coal Mining, Extractive (Quarrying) and Civil Construction

1

1 Year

2

2 Years

Drilling, Coal Mining and Extractive (Quarrying)

3-6

3 Years

Metalliferous Mining and Civil Construction

3-6

5 Years

Other sectors

Where this Unit is being assessed outside of the Resources and Infrastructure Sectors assessor and/or Industry subject matter expert experience should be in-line with industry standards for the sector in which it is being assessed and where no Industry standard is specified should comply with any relevant regulation.

*Assessors can demonstrate current work experience through employment within Industry in a role relevant to the outcomes of the Unit; or, for external assessors this can be demonstrated through exposure to Industry by conducting frequent site assessments across various locations.

**Where a unit is being delivered outside of a Qualification the first numeric character in the Unit code should be considered to indicate the AQF level


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assingnment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

1. Plan and prepare for installing sub-soil drainage

1.1 Access, interpret and apply sub-soil drainage installation documentation and ensure the work activity is complaint

1.2 Obtain, read, interpret, clarify and confirm work requirements

1.3 Identify and address potential risks, hazards and environmental issues, and implement control measures

1.4 Select and wear correct personal protective equipment appropriate for work activities

1.5 Identify, obtain, confirm and implement signage requirements

1.6 Select and check for faults all plant, tools and equipment to carry out tasks

1.7 Plan stock-piling of materials for ease of access and hazard reduction

2. Set out and excavate trenches

2.1 Check trench depths and grades to ensure conformity with plans and specifications

2.2 Set out and clearly mark trench location

2.3 Communicate with plant operator to ensure correct excavation of trenches, placement of shoring and battering

3. Install bedding materials

3.1 Identify bedding material type and depth from plans and specifications

3.2 Lay bedding materials to specified depths and grades

4. Install sub-soil drainage

4.1 Place geo-textile according to specifications

4.2 Prepare drain sections and fittings

4.3 Lay subsoil drain

4.4 Provide inspection opening and flush out points according to plans

4.5 Fit out and/or connect end structures/outlets/clean outs to culverts, storm water or subsoil drain systems

4.6 Install packing and prepare system for backfilling

4.7 Monitor backfill procedure to ensure work completed to specification

5. Clean up

5.1 Clear work area and recycle or dispose of materials

5.2 Clean, check, maintain and store plant, tools and equipment

Evidence is required to be collected that demonstrates a candidate’s competency in this unit. Evidence must be relevant to the roles within this sector’s work operations and satisfy all of the requirements of the performance criteria of this unit and include evidence that the candidate:

locates and applies applicable documentation, policies and procedures

implements the requirements, procedures and techniques for the safe, effective and efficient completion of sub-soil drainage installation including:

accessing, interpreting and applying relevant documentation to the installing sub-soil drainage work activity including relevant drawings and job specifications

identifying, addressing and reporting potential hazards and risks

identifying, obtaining, confirming and implementing signage requirements

selecting and checking for faults all plant, tools and equipment to carry out tasks

identifying, addressing and reporting environmental issues and ground conditions

planning stock-piling of materials for ease of access and hazard reduction

works effectively with others to undertake and complete the installation of sub-soil drainage in a way that meets all of the required outcomes including:

preparing for and organising work activities to meet all task requirements

communicating clearly and concisely with others to receive and clarify work instructions

using a range of communication techniques and aids to advise others of work activity and exclusion zones

monitoring hazards and identifying and communicating changes to the work environment during the work process

demonstrates completion of installing sub-soil drainage that safely, effectively and efficiently meets all of the required outcomes on more than one (1) occasion including:

setting out and excavating trenches to the correct location, depth and grade

installing sub-soil drainage using specified materials and meeting backfill requirements

clearing work area and recycling or disposing of materials

cleaning, checking, maintaining and storing plant, tools and equipment

installation of a minimum of one hundred (100) metres of sub-soil drain in two (2) separate locations, including end structures or outlets to design specifications

The candidate must demonstrate knowledge in installing sub-soil drainage through:

accessing, interpreting and applying, organisation and site requirements and procedures for:

identifying and managing risks

setting up the work activity

utilising signage for creating an exclusion zone

environmental protection

work health and safety

managing waste

selection of appropriate plant, tools and materials

carrying out work to plans and specifications

applying effective installation of sub-soil drainage techniques

An assessor of this unit must satisfy the requirements of the NVR/AQTF or their successors; and Industry regulations for certification and licensing; and,

this unit must be assessed in the context of this sector’s work environment; and,

this unit must be assessed in compliance with relevant legislation/regulation and using policies, procedures, processes and operational manuals directly related to the industry sector for which it is being assessed; and,

assessment may be conducted in conjunction with the assessment of other Units of Competency; and,

assessment must confirm consistent performance can be applied in a range of relevant workplace circumstances; and,

assessors must demonstrate the performance evidence, and knowledge evidence as outlined in this Unit of Competency, and through the minimum years of current* work experience specified below in an Industry sector relevant to the outcomes of the unit; or,

where the assessor does not meet experience requirements a co-assessment or partnership arrangement must exist between the qualified assessor and an Industry subject matter expert. The Industry subject matter expert should hold the unit being assessed (or an equivalent unit) and/or demonstrate equivalence of skills and knowledge at the unit level. An Industry technical expert must also demonstrate skills and knowledge from the minimum years of current work experience specified below in the Industry sector, including time spent in roles related to the unit being assessed; and,

assessor and Industry subject matter expert requirements differ depending on the Australian Qualifications Framework Level (AQF) of the qualification being assessed and/or Industry Sector as follows:

Industry sector

AQF** Level

Required assessor or Industry subject matter expert experience

Drilling, Metalliferous Mining, Coal Mining, Extractive (Quarrying) and Civil Construction

1

1 Year

2

2 Years

Drilling, Coal Mining and Extractive (Quarrying)

3-6

3 Years

Metalliferous Mining and Civil Construction

3-6

5 Years

Other sectors

Where this Unit is being assessed outside of the Resources and Infrastructure Sectors assessor and/or Industry subject matter expert experience should be in-line with industry standards for the sector in which it is being assessed and where no Industry standard is specified should comply with any relevant regulation.

*Assessors can demonstrate current work experience through employment within Industry in a role relevant to the outcomes of the Unit; or, for external assessors this can be demonstrated through exposure to Industry by conducting frequent site assessments across various locations.

**Where a unit is being delivered outside of a Qualification the first numeric character in the Unit code should be considered to indicate the AQF level

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Access, interpret and apply sub-soil drainage installation documentation and ensure the work activity is complaint 
Obtain, read, interpret, clarify and confirm work requirements 
Identify and address potential risks, hazards and environmental issues, and implement control measures 
Select and wear correct personal protective equipment appropriate for work activities 
Identify, obtain, confirm and implement signage requirements 
Select and check for faults all plant, tools and equipment to carry out tasks 
Plan stock-piling of materials for ease of access and hazard reduction 
Check trench depths and grades to ensure conformity with plans and specifications 
Set out and clearly mark trench location 
Communicate with plant operator to ensure correct excavation of trenches, placement of shoring and battering 
Identify bedding material type and depth from plans and specifications 
Lay bedding materials to specified depths and grades 
Place geo-textile according to specifications 
Prepare drain sections and fittings 
Lay subsoil drain 
Provide inspection opening and flush out points according to plans 
Fit out and/or connect end structures/outlets/clean outs to culverts, storm water or subsoil drain systems 
Install packing and prepare system for backfilling 
Monitor backfill procedure to ensure work completed to specification 
Clear work area and recycle or dispose of materials 
Clean, check, maintain and store plant, tools and equipment 
Access, interpret and apply sub-soil drainage installation documentation and ensure the work activity is complaint 
Obtain, read, interpret, clarify and confirm work requirements 
Identify and address potential risks, hazards and environmental issues, and implement control measures 
Select and wear correct personal protective equipment appropriate for work activities 
Identify, obtain, confirm and implement signage requirements 
Select and check for faults all plant, tools and equipment to carry out tasks 
Plan stock-piling of materials for ease of access and hazard reduction 
Check trench depths and grades to ensure conformity with plans and specifications 
Set out and clearly mark trench location 
Communicate with plant operator to ensure correct excavation of trenches, placement of shoring and battering 
Identify bedding material type and depth from plans and specifications 
Lay bedding materials to specified depths and grades 
Place geo-textile according to specifications 
Prepare drain sections and fittings 
Lay subsoil drain 
Provide inspection opening and flush out points according to plans 
Fit out and/or connect end structures/outlets/clean outs to culverts, storm water or subsoil drain systems 
Install packing and prepare system for backfilling 
Monitor backfill procedure to ensure work completed to specification 
Clear work area and recycle or dispose of materials 
Clean, check, maintain and store plant, tools and equipment 

Forms

Assessment Cover Sheet

RIICRC203D - Install sub-soil drainage
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

RIICRC203D - Install sub-soil drainage

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date: