Assessor Resource

RIICRC312D
Setup and maintain concrete paver stringlines

Assessment tool

Version 1.0
Issue Date: April 2024


This unit describes a participant’s skills and knowledge required to setup and maintain concrete paver stringlines in Civil Construction.

This unit is appropriate for those working in operational roles.

Licensing, legislative, regulatory and certification requirements that apply to this unit can vary between states, territories, and Industry sectors. Relevant information must be sourced prior to application of the unit.

You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)



Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

1. Plan and prepare for operations

1.1 Access, interpret and apply concrete paver stringlines documentation and ensure the work activity is compliant

1.2 Obtain, read, interpret, clarify and confirm work requirements

1.3 Identify and address potential risks, hazards and environmental issues, and implement control measures

1.4 Select and wear correct personal protective equipment appropriate for work activities

1.5 Identify, obtain and implement signage requirements

1.6 Select and check for faults all plant, tools and equipment to carry out tasks

2. Inspect equipment and layout

2.1 Conduct visual inspection of stringlines to ensure compliance with workplace specifications

2.2 Conduct inspection of stringline flags and pins and ensure compliance with worksite plans

2.3 Inspect hand or car winch and other pulling devices for safe and accurate operation

2.4 Conduct visual inspection of ground conditions for conformance to work requirements

2.5 Load and unload stringline pins onto vehicle within workplace specifications

2.6 Set up barricades and exclusion zones around work area/PTE

3. Conduct placement of stringline and pins

3.1 Drive in stringline pins and placement of pins within workplace specifications

3.2 Ensure correct tension of stringlines

3.3 Use tension measuring devices to establish accurate tensions on stringlines

3.4 Set up anchor pins within workplace specifications

3.5 Communicate with work teams using workplace hand or radio communication procedures

3.6 Tie off stringline to anchor pins

3.7 Release stringline from anchor pins

3.8 Set out from survey pins heights/level and undertake visual verification of alignment

3.9 Reset stringline to specification after it breaks

4. Install and remove access gates

4.1 Release stringline from the flags and fix on ground to allow vehicles to cross

4.2 Install and remove protective devices for crossing vehicles where required

4.3 Verify stringline vertical and horizontal upon resetting via measurement and visual inspection

5. Store and maintain pins and stringline

5.1 Check and maintain clamps, nuts and drive pins

5.2 Clean, check, maintain and store stringline to protect it from damage

Evidence is required to be collected that demonstrates a candidate’s competency in this unit. Evidence must be relevant to the roles within this sector’s work operations and satisfy all of the requirements of the performance criteria of this unit and include evidence that the candidate:

locates and applies applicable documentation, policies and procedures

implements the requirements, procedures and techniques for the safe, effective and efficient setup and maintenance of concrete paver stringlines including:

accessing, interpreting and applying documentation relevant to setup and maintenance of concrete paver stringlines

identifying and applying relevant specifications to all work activities

identifying, addressing and reporting potential hazards and risks

identifying, obtaining, confirming and implementing signage requirements

selecting and checking for faults all plant, tools and equipment to carry out tasks

identifying, addressing and reporting environmental issues and ground conditions

works effectively with others to setup and maintain concrete paver stringlines in a way that meets all of the required outcomes including:

preparing for and organising work activities to meet all task requirements

communicating clearly and concisely with others to receive and clarify work instructions

using a range of communication techniques and aids to advise others of work activity and exclusion zones

monitoring movements and hazards and identifying and communicating changes to the work environment during the work process

demonstrates completion of the setup and maintenance of concrete paver stringlines that safely, effectively and efficiently meets all of the required outcomes on more than one (1) occasion including:

inspecting equipment and layout for compliance with workplace specifications

setting up barricades and exclusion zones

conducting placement of stringline and pins to set specifications

installing and removing access gates and carrying out inspections

storing and maintaining pins and stringline correctly

conduct concrete paver stringlines operations by:

installing two (2) access points

installing pins to correct height and horizontal adjustment for a minimum distance of five hundred (500) metres

installing step-up flags

tension string lines to specifications

conducting measurement checks

conducting visual inspections and checks

placing at least one (1) crossover

demonstrating the removal and storage of a string line

The candidate must demonstrate knowledge of the following when setting up and maintaining concrete paver stringlines through:

accessing, interpreting and applying organisation and site requirements and procedures for the setup and maintenance of concrete paver stringlines for:

identifying and managing risks

identifying, addressing and reporting environmental issues

setting up work activity

site isolation, signage, erecting barriers and traffic control

work health and safety

selecting and checking for faults, tools and equipment to carry out tasks

carrying out work to specifications

applying effective techniques for the setup and maintenance of concrete paver stringlines operations

An assessor of this unit must satisfy the requirements of the NVR/AQTF or their successors; and Industry regulations for certification and licensing; and,

this unit must be assessed in the context of this sector’s work environment; and,

this unit must be assessed in compliance with relevant legislation/regulation and using policies, procedures, processes and operational manuals directly related to the industry sector for which it is being assessed; and,

assessment may be conducted in conjunction with the assessment of other Units of Competency; and,

assessment must confirm consistent performance can be applied in a range of relevant workplace circumstances; and,

assessors must demonstrate the performance evidence, and knowledge evidence as outlined in this Unit of Competency, and through the minimum years of current* work experience specified below in an Industry sector relevant to the outcomes of the unit; or,

where the assessor does not meet experience requirements a co-assessment or partnership arrangement must exist between the qualified assessor and an Industry subject matter expert. The Industry subject matter expert should hold the unit being assessed (or an equivalent unit) and/or demonstrate equivalence of skills and knowledge at the unit level. An Industry technical expert must also demonstrate skills and knowledge from the minimum years of current work experience specified below in the Industry sector, including time spent in roles related to the unit being assessed; and,

assessor and Industry subject matter expert requirements differ depending on the Australian Qualifications Framework Level (AQF) of the qualification being assessed and/or Industry Sector as follows:

Industry sector

AQF** Level

Required assessor or Industry subject matter expert experience

Drilling, Metalliferous Mining, Coal Mining, Extractive (Quarrying) and Civil Construction

1

1 Year

2

2 Years

Drilling, Coal Mining and Extractive (Quarrying)

3-6

3 Years

Metalliferous Mining and Civil Construction

3-6

5 Years

Other sectors

Where this Unit is being assessed outside of the Resources and Infrastructure Sectors assessor and/or Industry subject matter expert experience should be in-line with industry standards for the sector in which it is being assessed and where no Industry standard is specified should comply with any relevant regulation.

*Assessors can demonstrate current work experience through employment within Industry in a role relevant to the outcomes of the Unit; or, for external assessors this can be demonstrated through exposure to Industry by conducting frequent site assessments across various locations.

**Where a unit is being delivered outside of a Qualification the first numeric character in the Unit code should be considered to indicate the AQF level


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assingnment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

1. Plan and prepare for operations

1.1 Access, interpret and apply concrete paver stringlines documentation and ensure the work activity is compliant

1.2 Obtain, read, interpret, clarify and confirm work requirements

1.3 Identify and address potential risks, hazards and environmental issues, and implement control measures

1.4 Select and wear correct personal protective equipment appropriate for work activities

1.5 Identify, obtain and implement signage requirements

1.6 Select and check for faults all plant, tools and equipment to carry out tasks

2. Inspect equipment and layout

2.1 Conduct visual inspection of stringlines to ensure compliance with workplace specifications

2.2 Conduct inspection of stringline flags and pins and ensure compliance with worksite plans

2.3 Inspect hand or car winch and other pulling devices for safe and accurate operation

2.4 Conduct visual inspection of ground conditions for conformance to work requirements

2.5 Load and unload stringline pins onto vehicle within workplace specifications

2.6 Set up barricades and exclusion zones around work area/PTE

3. Conduct placement of stringline and pins

3.1 Drive in stringline pins and placement of pins within workplace specifications

3.2 Ensure correct tension of stringlines

3.3 Use tension measuring devices to establish accurate tensions on stringlines

3.4 Set up anchor pins within workplace specifications

3.5 Communicate with work teams using workplace hand or radio communication procedures

3.6 Tie off stringline to anchor pins

3.7 Release stringline from anchor pins

3.8 Set out from survey pins heights/level and undertake visual verification of alignment

3.9 Reset stringline to specification after it breaks

4. Install and remove access gates

4.1 Release stringline from the flags and fix on ground to allow vehicles to cross

4.2 Install and remove protective devices for crossing vehicles where required

4.3 Verify stringline vertical and horizontal upon resetting via measurement and visual inspection

5. Store and maintain pins and stringline

5.1 Check and maintain clamps, nuts and drive pins

5.2 Clean, check, maintain and store stringline to protect it from damage

Evidence is required to be collected that demonstrates a candidate’s competency in this unit. Evidence must be relevant to the roles within this sector’s work operations and satisfy all of the requirements of the performance criteria of this unit and include evidence that the candidate:

locates and applies applicable documentation, policies and procedures

implements the requirements, procedures and techniques for the safe, effective and efficient setup and maintenance of concrete paver stringlines including:

accessing, interpreting and applying documentation relevant to setup and maintenance of concrete paver stringlines

identifying and applying relevant specifications to all work activities

identifying, addressing and reporting potential hazards and risks

identifying, obtaining, confirming and implementing signage requirements

selecting and checking for faults all plant, tools and equipment to carry out tasks

identifying, addressing and reporting environmental issues and ground conditions

works effectively with others to setup and maintain concrete paver stringlines in a way that meets all of the required outcomes including:

preparing for and organising work activities to meet all task requirements

communicating clearly and concisely with others to receive and clarify work instructions

using a range of communication techniques and aids to advise others of work activity and exclusion zones

monitoring movements and hazards and identifying and communicating changes to the work environment during the work process

demonstrates completion of the setup and maintenance of concrete paver stringlines that safely, effectively and efficiently meets all of the required outcomes on more than one (1) occasion including:

inspecting equipment and layout for compliance with workplace specifications

setting up barricades and exclusion zones

conducting placement of stringline and pins to set specifications

installing and removing access gates and carrying out inspections

storing and maintaining pins and stringline correctly

conduct concrete paver stringlines operations by:

installing two (2) access points

installing pins to correct height and horizontal adjustment for a minimum distance of five hundred (500) metres

installing step-up flags

tension string lines to specifications

conducting measurement checks

conducting visual inspections and checks

placing at least one (1) crossover

demonstrating the removal and storage of a string line

The candidate must demonstrate knowledge of the following when setting up and maintaining concrete paver stringlines through:

accessing, interpreting and applying organisation and site requirements and procedures for the setup and maintenance of concrete paver stringlines for:

identifying and managing risks

identifying, addressing and reporting environmental issues

setting up work activity

site isolation, signage, erecting barriers and traffic control

work health and safety

selecting and checking for faults, tools and equipment to carry out tasks

carrying out work to specifications

applying effective techniques for the setup and maintenance of concrete paver stringlines operations

An assessor of this unit must satisfy the requirements of the NVR/AQTF or their successors; and Industry regulations for certification and licensing; and,

this unit must be assessed in the context of this sector’s work environment; and,

this unit must be assessed in compliance with relevant legislation/regulation and using policies, procedures, processes and operational manuals directly related to the industry sector for which it is being assessed; and,

assessment may be conducted in conjunction with the assessment of other Units of Competency; and,

assessment must confirm consistent performance can be applied in a range of relevant workplace circumstances; and,

assessors must demonstrate the performance evidence, and knowledge evidence as outlined in this Unit of Competency, and through the minimum years of current* work experience specified below in an Industry sector relevant to the outcomes of the unit; or,

where the assessor does not meet experience requirements a co-assessment or partnership arrangement must exist between the qualified assessor and an Industry subject matter expert. The Industry subject matter expert should hold the unit being assessed (or an equivalent unit) and/or demonstrate equivalence of skills and knowledge at the unit level. An Industry technical expert must also demonstrate skills and knowledge from the minimum years of current work experience specified below in the Industry sector, including time spent in roles related to the unit being assessed; and,

assessor and Industry subject matter expert requirements differ depending on the Australian Qualifications Framework Level (AQF) of the qualification being assessed and/or Industry Sector as follows:

Industry sector

AQF** Level

Required assessor or Industry subject matter expert experience

Drilling, Metalliferous Mining, Coal Mining, Extractive (Quarrying) and Civil Construction

1

1 Year

2

2 Years

Drilling, Coal Mining and Extractive (Quarrying)

3-6

3 Years

Metalliferous Mining and Civil Construction

3-6

5 Years

Other sectors

Where this Unit is being assessed outside of the Resources and Infrastructure Sectors assessor and/or Industry subject matter expert experience should be in-line with industry standards for the sector in which it is being assessed and where no Industry standard is specified should comply with any relevant regulation.

*Assessors can demonstrate current work experience through employment within Industry in a role relevant to the outcomes of the Unit; or, for external assessors this can be demonstrated through exposure to Industry by conducting frequent site assessments across various locations.

**Where a unit is being delivered outside of a Qualification the first numeric character in the Unit code should be considered to indicate the AQF level

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Access, interpret and apply concrete paver stringlines documentation and ensure the work activity is compliant 
Obtain, read, interpret, clarify and confirm work requirements 
Identify and address potential risks, hazards and environmental issues, and implement control measures 
Select and wear correct personal protective equipment appropriate for work activities 
Identify, obtain and implement signage requirements 
Select and check for faults all plant, tools and equipment to carry out tasks 
Conduct visual inspection of stringlines to ensure compliance with workplace specifications 
Conduct inspection of stringline flags and pins and ensure compliance with worksite plans 
Inspect hand or car winch and other pulling devices for safe and accurate operation 
Conduct visual inspection of ground conditions for conformance to work requirements 
Load and unload stringline pins onto vehicle within workplace specifications 
Set up barricades and exclusion zones around work area/PTE 
Drive in stringline pins and placement of pins within workplace specifications 
Ensure correct tension of stringlines 
Use tension measuring devices to establish accurate tensions on stringlines 
Set up anchor pins within workplace specifications 
Communicate with work teams using workplace hand or radio communication procedures 
Tie off stringline to anchor pins 
Release stringline from anchor pins 
Set out from survey pins heights/level and undertake visual verification of alignment 
Reset stringline to specification after it breaks 
Release stringline from the flags and fix on ground to allow vehicles to cross 
Install and remove protective devices for crossing vehicles where required 
Verify stringline vertical and horizontal upon resetting via measurement and visual inspection 
Check and maintain clamps, nuts and drive pins 
Clean, check, maintain and store stringline to protect it from damage 
Access, interpret and apply concrete paver stringlines documentation and ensure the work activity is compliant 
Obtain, read, interpret, clarify and confirm work requirements 
Identify and address potential risks, hazards and environmental issues, and implement control measures 
Select and wear correct personal protective equipment appropriate for work activities 
Identify, obtain and implement signage requirements 
Select and check for faults all plant, tools and equipment to carry out tasks 
Conduct visual inspection of stringlines to ensure compliance with workplace specifications 
Conduct inspection of stringline flags and pins and ensure compliance with worksite plans 
Inspect hand or car winch and other pulling devices for safe and accurate operation 
Conduct visual inspection of ground conditions for conformance to work requirements 
Load and unload stringline pins onto vehicle within workplace specifications 
Set up barricades and exclusion zones around work area/PTE 
Drive in stringline pins and placement of pins within workplace specifications 
Ensure correct tension of stringlines 
Use tension measuring devices to establish accurate tensions on stringlines 
Set up anchor pins within workplace specifications 
Communicate with work teams using workplace hand or radio communication procedures 
Tie off stringline to anchor pins 
Release stringline from anchor pins 
Set out from survey pins heights/level and undertake visual verification of alignment 
Reset stringline to specification after it breaks 
Release stringline from the flags and fix on ground to allow vehicles to cross 
Install and remove protective devices for crossing vehicles where required 
Verify stringline vertical and horizontal upon resetting via measurement and visual inspection 
Check and maintain clamps, nuts and drive pins 
Clean, check, maintain and store stringline to protect it from damage 

Forms

Assessment Cover Sheet

RIICRC312D - Setup and maintain concrete paver stringlines
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

RIICRC312D - Setup and maintain concrete paver stringlines

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: