This unit describes a participant’s skills and knowledge required to place and compact concrete in Civil Construction.

This unit is appropriate for those working in operational roles.

Licensing, legislative, regulatory and certification requirements that apply to this unit can vary between states, territories and Industry sectors. Relevant information must be sourced prior to application of the unit.

You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)



Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

1. Plan and prepare to place and compact concrete

1.1 Access, interpret and apply concrete compaction documentation and ensure the work activity is compliant

1.2 Obtain, read, interpret, clarify and confirm work requirements

1.3 Identify and address potential risks, hazards and environmental issues, and implement control measures

1.4 Select and wear correct personal protective equipment appropriate for work activities

1.5 Identify, obtain, confirm and implement signage requirements

1.6 Select and check for faults all plant, tools and equipment to carry out tasks

2. Define and prepare work area

2.1 Check location of concrete placement is determined from plans and specifications and location for placement is free of debris and waste

2.2 Maintain safe working area around pour location using barriers and signage

2.3 Locate plant, tools and equipment to suit planned placement

2.4 Undertake pre-pour inspections before concrete arrives on site

3. Place concrete and compact

3.1 Place concrete in horizontal layers into location to levels indicated by markers, level pegs or lines

3.2 Minimise height of vertical drop of concrete to avoid segregation of concrete materials

3.3 Consolidate poured concrete during process using approved compaction or vibration method

3.4 Check finished levels against datum using levelling device

4. Screed/level concrete

4.1 Screed concrete to correct levels and grades using straight edged tool/formwork mounted screed

5. Clean up

5.1 Clear work area and dispose, reuse or recycle materials

5.2 Clean, check, maintain and store plant, tools and equipment

Evidence is required to be collected that demonstrates a candidate’s competency in this unit. Evidence must be relevant to the roles within this sector’s work operations and satisfy all of the requirements of the performance criteria of this unit and include evidence that the candidate:

locates and applies applicable documentation, policies and procedures

implements the requirements, procedures and techniques for the safe, effective and efficient placement and compaction of concrete including:

accessing, interpreting and applying documentation for placing and compacting concrete

identifying and applying relevant specifications to all work activities

identifying, addressing and reporting potential hazards and risks

identifying, obtaining, confirming and implementing signage requirements

selecting and checking for faults all plant, tools and equipment to carry out tasks

identifying, addressing and reporting environmental issues

works effectively with others to undertake the placement and compaction of concrete that meets all of the required outcomes including:

preparing for and organising work activities to meet all task requirements

communicating clearly and concisely with others to receive and clarify work instructions

using a range of communication techniques and aids to advise others of work activity and exclusion zones

monitoring movements and hazards and identifying and communicating changes to the work environment during the work process

demonstrates completion of placing and compacting concrete that safely, effectively and efficiently meets all of the required outcomes on more than one (1) occasion including:

defining and preparing work, locating plant, tools and equipment to suit planned placement and undertaking pre-pour inspections

placing concrete using a minimum of two (2) of the following techniques

kibble

pumping equipment

shovelling

tremmies

truck placed

vibrating

wheelbarrows

using method/s used to avoid segregation of concrete

compacting or vibrating concrete to specifications

using techniques to finish concrete

screeding concrete to correct levels and grades

clearing work area and disposing of, recycling or storing materials

cleaning, checking, maintaining and storing plant, tools and equipment

The candidate must demonstrate knowledge in placing and compacting concrete through:

accessing, interpreting and applying the organisation and site requirements and procedures for:

identifying and managing risks

identifying, addressing and reporting environmental issues

setting up work activity

site isolation, signage, erecting barriers and traffic control

work health and safety

managing waste

selecting and checking for faults, all tools and equipment to carry out tasks

carrying out work to specifications

manufacturer’s design specifications

applying effective techniques for placing and compacting concrete

An assessor of this unit must satisfy the requirements of the NVR/AQTF or their successors; and Industry regulations for certification and licensing; and,

this unit must be assessed in the context of this sector’s work environment; and,

this unit must be assessed in compliance with relevant legislation/regulation and using policies, procedures, processes and operational manuals directly related to the industry sector for which it is being assessed; and,

assessment may be conducted in conjunction with the assessment of other Units of Competency; and,

assessment must confirm consistent performance can be applied in a range of relevant workplace circumstances; and,

assessors must demonstrate the performance evidence, and knowledge evidence as outlined in this Unit of Competency, and through the minimum years of current* work experience specified below in an Industry sector relevant to the outcomes of the unit; or,

where the assessor does not meet experience requirements a co-assessment or partnership arrangement must exist between the qualified assessor and an Industry subject matter expert. The Industry subject matter expert should hold the unit being assessed (or an equivalent unit) and/or demonstrate equivalence of skills and knowledge at the unit level. An Industry technical expert must also demonstrate skills and knowledge from the minimum years of current work experience specified below in the Industry sector, including time spent in roles related to the unit being assessed; and,

assessor and Industry subject matter expert requirements differ depending on the Australian Qualifications Framework Level (AQF) of the qualification being assessed and/or Industry Sector as follows:

Industry sector

AQF** Level

Required assessor or Industry subject matter expert experience

Drilling, Metalliferous Mining, Coal Mining, Extractive (Quarrying) and Civil Construction

1

1 Year

2

2 Years

Drilling, Coal Mining and Extractive (Quarrying)

3-6

3 Years

Metalliferous Mining and Civil Construction

3-6

5 Years

Other sectors

Where this Unit is being assessed outside of the Resources and Infrastructure Sectors assessor and/or Industry subject matter expert experience should be in-line with industry standards for the sector in which it is being assessed and where no Industry standard is specified should comply with any relevant regulation.

*Assessors can demonstrate current work experience through employment within Industry in a role relevant to the outcomes of the Unit; or, for external assessors this can be demonstrated through exposure to Industry by conducting frequent site assessments across various locations.

**Where a unit is being delivered outside of a Qualification the first numeric character in the Unit code should be considered to indicate the AQF level


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assingnment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

1. Plan and prepare to place and compact concrete

1.1 Access, interpret and apply concrete compaction documentation and ensure the work activity is compliant

1.2 Obtain, read, interpret, clarify and confirm work requirements

1.3 Identify and address potential risks, hazards and environmental issues, and implement control measures

1.4 Select and wear correct personal protective equipment appropriate for work activities

1.5 Identify, obtain, confirm and implement signage requirements

1.6 Select and check for faults all plant, tools and equipment to carry out tasks

2. Define and prepare work area

2.1 Check location of concrete placement is determined from plans and specifications and location for placement is free of debris and waste

2.2 Maintain safe working area around pour location using barriers and signage

2.3 Locate plant, tools and equipment to suit planned placement

2.4 Undertake pre-pour inspections before concrete arrives on site

3. Place concrete and compact

3.1 Place concrete in horizontal layers into location to levels indicated by markers, level pegs or lines

3.2 Minimise height of vertical drop of concrete to avoid segregation of concrete materials

3.3 Consolidate poured concrete during process using approved compaction or vibration method

3.4 Check finished levels against datum using levelling device

4. Screed/level concrete

4.1 Screed concrete to correct levels and grades using straight edged tool/formwork mounted screed

5. Clean up

5.1 Clear work area and dispose, reuse or recycle materials

5.2 Clean, check, maintain and store plant, tools and equipment

Evidence is required to be collected that demonstrates a candidate’s competency in this unit. Evidence must be relevant to the roles within this sector’s work operations and satisfy all of the requirements of the performance criteria of this unit and include evidence that the candidate:

locates and applies applicable documentation, policies and procedures

implements the requirements, procedures and techniques for the safe, effective and efficient placement and compaction of concrete including:

accessing, interpreting and applying documentation for placing and compacting concrete

identifying and applying relevant specifications to all work activities

identifying, addressing and reporting potential hazards and risks

identifying, obtaining, confirming and implementing signage requirements

selecting and checking for faults all plant, tools and equipment to carry out tasks

identifying, addressing and reporting environmental issues

works effectively with others to undertake the placement and compaction of concrete that meets all of the required outcomes including:

preparing for and organising work activities to meet all task requirements

communicating clearly and concisely with others to receive and clarify work instructions

using a range of communication techniques and aids to advise others of work activity and exclusion zones

monitoring movements and hazards and identifying and communicating changes to the work environment during the work process

demonstrates completion of placing and compacting concrete that safely, effectively and efficiently meets all of the required outcomes on more than one (1) occasion including:

defining and preparing work, locating plant, tools and equipment to suit planned placement and undertaking pre-pour inspections

placing concrete using a minimum of two (2) of the following techniques

kibble

pumping equipment

shovelling

tremmies

truck placed

vibrating

wheelbarrows

using method/s used to avoid segregation of concrete

compacting or vibrating concrete to specifications

using techniques to finish concrete

screeding concrete to correct levels and grades

clearing work area and disposing of, recycling or storing materials

cleaning, checking, maintaining and storing plant, tools and equipment

The candidate must demonstrate knowledge in placing and compacting concrete through:

accessing, interpreting and applying the organisation and site requirements and procedures for:

identifying and managing risks

identifying, addressing and reporting environmental issues

setting up work activity

site isolation, signage, erecting barriers and traffic control

work health and safety

managing waste

selecting and checking for faults, all tools and equipment to carry out tasks

carrying out work to specifications

manufacturer’s design specifications

applying effective techniques for placing and compacting concrete

An assessor of this unit must satisfy the requirements of the NVR/AQTF or their successors; and Industry regulations for certification and licensing; and,

this unit must be assessed in the context of this sector’s work environment; and,

this unit must be assessed in compliance with relevant legislation/regulation and using policies, procedures, processes and operational manuals directly related to the industry sector for which it is being assessed; and,

assessment may be conducted in conjunction with the assessment of other Units of Competency; and,

assessment must confirm consistent performance can be applied in a range of relevant workplace circumstances; and,

assessors must demonstrate the performance evidence, and knowledge evidence as outlined in this Unit of Competency, and through the minimum years of current* work experience specified below in an Industry sector relevant to the outcomes of the unit; or,

where the assessor does not meet experience requirements a co-assessment or partnership arrangement must exist between the qualified assessor and an Industry subject matter expert. The Industry subject matter expert should hold the unit being assessed (or an equivalent unit) and/or demonstrate equivalence of skills and knowledge at the unit level. An Industry technical expert must also demonstrate skills and knowledge from the minimum years of current work experience specified below in the Industry sector, including time spent in roles related to the unit being assessed; and,

assessor and Industry subject matter expert requirements differ depending on the Australian Qualifications Framework Level (AQF) of the qualification being assessed and/or Industry Sector as follows:

Industry sector

AQF** Level

Required assessor or Industry subject matter expert experience

Drilling, Metalliferous Mining, Coal Mining, Extractive (Quarrying) and Civil Construction

1

1 Year

2

2 Years

Drilling, Coal Mining and Extractive (Quarrying)

3-6

3 Years

Metalliferous Mining and Civil Construction

3-6

5 Years

Other sectors

Where this Unit is being assessed outside of the Resources and Infrastructure Sectors assessor and/or Industry subject matter expert experience should be in-line with industry standards for the sector in which it is being assessed and where no Industry standard is specified should comply with any relevant regulation.

*Assessors can demonstrate current work experience through employment within Industry in a role relevant to the outcomes of the Unit; or, for external assessors this can be demonstrated through exposure to Industry by conducting frequent site assessments across various locations.

**Where a unit is being delivered outside of a Qualification the first numeric character in the Unit code should be considered to indicate the AQF level

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Access, interpret and apply concrete compaction documentation and ensure the work activity is compliant 
Obtain, read, interpret, clarify and confirm work requirements 
Identify and address potential risks, hazards and environmental issues, and implement control measures 
Select and wear correct personal protective equipment appropriate for work activities 
Identify, obtain, confirm and implement signage requirements 
Select and check for faults all plant, tools and equipment to carry out tasks 
Check location of concrete placement is determined from plans and specifications and location for placement is free of debris and waste 
Maintain safe working area around pour location using barriers and signage 
Locate plant, tools and equipment to suit planned placement 
Undertake pre-pour inspections before concrete arrives on site 
Place concrete in horizontal layers into location to levels indicated by markers, level pegs or lines 
Minimise height of vertical drop of concrete to avoid segregation of concrete materials 
Consolidate poured concrete during process using approved compaction or vibration method 
Check finished levels against datum using levelling device 
Screed concrete to correct levels and grades using straight edged tool/formwork mounted screed 
Clear work area and dispose, reuse or recycle materials 
Clean, check, maintain and store plant, tools and equipment 
Access, interpret and apply concrete compaction documentation and ensure the work activity is compliant 
Obtain, read, interpret, clarify and confirm work requirements 
Identify and address potential risks, hazards and environmental issues, and implement control measures 
Select and wear correct personal protective equipment appropriate for work activities 
Identify, obtain, confirm and implement signage requirements 
Select and check for faults all plant, tools and equipment to carry out tasks 
Check location of concrete placement is determined from plans and specifications and location for placement is free of debris and waste 
Maintain safe working area around pour location using barriers and signage 
Locate plant, tools and equipment to suit planned placement 
Undertake pre-pour inspections before concrete arrives on site 
Place concrete in horizontal layers into location to levels indicated by markers, level pegs or lines 
Minimise height of vertical drop of concrete to avoid segregation of concrete materials 
Consolidate poured concrete during process using approved compaction or vibration method 
Check finished levels against datum using levelling device 
Screed concrete to correct levels and grades using straight edged tool/formwork mounted screed 
Clear work area and dispose, reuse or recycle materials 
Clean, check, maintain and store plant, tools and equipment 

Forms

Assessment Cover Sheet

RIICRC316D - Place and compact concrete
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

RIICRC316D - Place and compact concrete

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: