Assessor Resource

RIINHB305A
Conduct continuous flight auger drilling

Assessment tool

Version 1.0
Issue Date: April 2024


Flight auger drilling is used in environmental, foundation, geotechnical, minerals exploration, seismic and waterwell drilling. This unit is appropriate for those working in driller roles, at worksites within:

Civil construction

Coal mining

Drilling

Extractive industries

Metalliferous mining

This unit covers the conduct of continuous flight auger drilling in resources and infrastructure industries. It includes planning and preparing for conducting continuous flight auger drilling; operating continuous flight auger drills; maintaining equipment; and respond to problems.

You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)

Prerequisites

Not applicable.


Co-Requisites

Not applicable.


Employability Skills

This unit contains employability skills.




Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.

Overview of assessment

Critical aspects for assessment and evidence required to demonstrate competency in this unit

The evidence required to demonstrate competency in this unit must be relevant to worksite operations and satisfy all of the requirements of the performance criteria, required skills and knowledge and the range statement of this unit and include evidence of the following:

knowledge of the requirements, procedures and instructions for conducting of continuous flight auger drilling

implementation of requirements, procedures and techniques for the safe, effective and efficient completion of continuous flight auger drilling

working with others to undertake and complete the continuous flight auger drilling tasks that meets all of the required outcomes

consistent timely completion of continuous flight auger drilling tasks that safely, effectively and efficiently meets the required outcomes

Context of and specific resources for assessment

This unit must be assessed in the context of the work environment. Where personal safety or environmental damage are limiting factors, assessment may occur in a simulated environment provided it is realistic and sufficiently rigorous to cover all aspects of workplace performance, including task skills, task management skills, contingency management skills and job role environment skills.

The assessment environment should not disadvantage the participant. For example, language, literacy and numeracy demands of assessment should not be greater than those required on the job.

Customisation of assessment and delivery environment to sensitively accommodate cultural diversity.

Aboriginal people and other people from a non English speaking background may have second language issues.

Assessment of this competency requires typical resources normally used in the work environment. Selection and use of resources for particular worksites may differ due to site circumstances.

Where applicable, physical resources should include equipment modified for people with disabilities. Access must be provided to appropriate learning and/or assessment support when required.

Method of assessment

This unit may be assessed in a holistic way with other units of competency. The assessment strategy for this unit must verify required knowledge and skill and practical application using more than one of the following assessment methods:

written and/or oral assessment of the candidate's required knowledge

observed, documented and/or first hand testimonial evidence of the candidate's:

implementation of appropriate requirement, procedures and techniques for the safe, effective and efficient achievement of required outcomes

consistently achieving the required outcomes

first hand testimonial evidence of the candidate's:

working with others to undertake and complete continuous flight auger drilling tasks

Guidance information for assessment

Consult the SkillsDMC User Guide for further information on assessment including access and equity issues.


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assingnment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Required skills

Specific skills are required to achieve the performance criteria in this unit, particularly for the application in the various circumstances in which this unit may be applied. This includes the ability to carry out the following as required to conduct continuous flight auger drilling:

apply legislative, organisation and site requirements and procedures for conducting of continuous flight auger drilling

apply occupational health and safety requirement and procedures

interpret geological maps, bore logs, diagrams, plans and instructions used for recording and prediction

apply procedure to operate the rig carrier to position and move between holes

apply rig stabilisation and levelling procedures

identify components in various auger techniques and sizes

apply equipment assembly, inspection and servicing procedures

apply rig operating functions and controls with safety

apply grout mixing techniques and placement methods

apply test hole grouting and abandonment requirements and procedures

apply water levels recording requirements

use a calculator to calculate hole volume

apply mechanical and manual handling safety procedures

apply pressure cleaning devices procedures to decontaminate augers and equipment

apply 'wireline' deployment and recovery techniques for sampling equipment

apply, record and report on standard penetration test method

apply deployment and recovery procedures of drilling and sampling systems using hollow augers as casing and recovery techniques for hollow auger inner rods and plug bits

use tape measures

apply conversion between metric and imperial units

calculate using addition, subtraction, multiplication and division

Required knowledge

Specific knowledge is required to achieve the Performance Criteria of this unit, particularly its application in a variety of circumstances in which the unit may be used. This includes knowledge of the following, as required to conduct continuous flight auger drilling:

OHS responsibilities

site hazards identification, assessment and control measures requirements and procedures

environmental protection measures and aspects

equipment and spares identification and characteristics

equipment technical capabilities, system limitations, gauge readings and their interpretation

soil sampling techniques, deployment methods and record keeping

operational maintenance procedures for rig and equipment including pre-start checks

basic geological formations likely to be encountered and their properties

use of water, mud and foam injection for jet auger drilling

The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

Relevant compliance documentation may include:

legislative, organisational and site requirements and procedures

manufacturer's guidelines and specifications

Australian standards

code of practice

Employment and workplace relations legislation

Equal Employment Opportunity and Disability Discrimination legislation

Work instructions may come from:

briefings, handovers, plans and work orders and may be written or verbal, formal or informal and may include:

nature and scope of tasks

specifications

quality of finished works

achievement targets

operational conditions

obtaining of permits required

site layout

out of bounds areas

worksite inspection requirements

lighting conditions

plant or equipment defects

hazards and potential hazards

coordination requirements or issues

contamination control requirements

environmental control requirements

barricade and signage requirements

Coordination requirements may include

drill team

other equipment operators

maintenance personnel

supervisors

worksite personnel

Hazards may include:

release of gases from formation or samples obtained

spread of contaminants as a result of drilling or cleaning processes

change in the chemistry of contaminants as a result of drilling and recovery of the samples

working in proximity to drilling rig

use of high pressure air for drilling operations

entanglement in rotating pipes

string makeup and breakout hazards

drilling equipment and down-hole tools will depend on the air drilling method being used

Personal protective equipment includes:

steel-capped boots and hardhat

gloves

dust mask

eye and hearing protection

general protective and reflective clothing

Equipment includes:

solid flight augers including hex coupled augers, hex pins, D clips, screw taper thread (jet augers) and thread lube

hollow flight augers including overshot deployment of sampling tools, various manufacturer's tooling, taper screw threads and dog coupled reversible hollow augers, older hollow auger systems using parallel wall threads and plug bits deployed on inner rods

sampling systems including SPT hammers and split spoons

auger recovery tools, auger retaining plate, lifting sockets and hoisting plugs

O rings and flush hole plug spares for dog couples reversible hollow augers, circlip pliers

Operational problems may include:

straighten holes and starting straight holes

encountering excessive water

sand blowback with hollow augers in wet unconsolidated formations

cork screwing effect when hold back not set properly

rotating too fast so that flights are not properly filled

cross contamination of samples when using solid flight augers

balancing bit cutting action with hole clearing action

recovering samples in wet conditions

OHS issues relating to rotating plant including catching long hair, loose clothing, finger injuries, safety with lifting and carrying

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Access, interpret and apply compliance documentation relevant to the work activity 
Obtain, confirm and apply work instructions for the allocated task 
Identify, manage and report all potential hazards 
Resolve coordination requirements with others at the site prior to commencing and during work activities 
Take steps to protect the environment and record any environmental incidents 
Collar borehole, start hole, maintain hole alignment, take corrective action for deflections 
Make up appropriate drill string 
Handle additional augers, inserting them in the drill string 
Apply rotation, feed and holdback so that flights are substantially full for the soil being drilled at any given depth 
Interpret flow from the flights and other factors to determine conditions at the bit 
Describe and log, or record, description of the soils being excavated 
Make, break auger string and drive head connections safely 
Deploy and recover associated sampling equipment, obtain samples, bag, label and record samples 
Maintain a clear hole and a clear bottom and deploy tools for cleaning hole bottom at completed depth and/or prior to sampling tool deployment 
Interpret and/or calculate actual depth at any point during drilling, interpret depth of strata changes and identify fill depth in any bore 
Select appropriate strategies for recovery of dropped augers 
Recover drill string using winch and/or head/kelly and disassemble drill string 
Select bits for formation being drilled 
Select appropriate augering method for situation 
Maintain spoil removal from hole collar with appropriate safety protocols and constantly maintain safe working conditions 
Abandon, cover and/or secure bores to ensure safety of others and crew 
Communicate effectively with crew, clients and management 
Prepare and submit paperwork for daily activities including bore logs where appropriate 
Ensure appropriate personal protective equipment and work clothing for the task is worn 
Monitor external wear in drill string, rotate string elements to ensure even wear 
Interchange drill bits and/or drill bit elements to maintain free cutting ability 
Check all string and equipment elements for wear and proper function 
Replace worn elements in string, bits and equipment and recycle 'out of specification' equipment for repair or redundancy 
Apply lubrication as appropriate 
Maintain good housekeeping on site and for equipment in storage 
Keep auger equipment clean 
Identify possible operational problems in equipment or process 
Identify symptoms of problems needing remedial action 
Determine possible fault causes 
Rectify problem using appropriate solution within area of responsibility 
Follow through items initiated until final resolution has occurred 
Report problems outside area of responsibility to designated person 

Forms

Assessment Cover Sheet

RIINHB305A - Conduct continuous flight auger drilling
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

RIINHB305A - Conduct continuous flight auger drilling

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: