Assessor Resource

RIIOGD303D
Trip pipe

Assessment tool

Version 1.0
Issue Date: May 2024


This unit describes a participant’s skills and knowledge required to apply trip pipe in Drilling.

This unit is appropriate for those working in operational roles.

Licensing, legislative, regulatory and certification requirements that apply to this unit can vary between states, territories, and industry sectors. Relevant information must be sourced prior to application of the unit.

You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)



Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

1. Plan and prepare for operations

1.1 Access, interpret and apply trip pipe documentation and ensure the work activity is compliant

1.2 Obtain, read, interpret, clarify and confirm work requirements

1.3 Identify and address potential risks, hazards and environmental issues and implement control measures

1.4 Select the personal protective equipment appropriate for the work activity

1.5 Resolve coordination requirements with others at the site prior to commencing and during work activities and ensure briefings/handover details are read/passed on

1.6 Confirm availability and status of necessary permits to work in accordance with operational and legislative requirements

1.7 Confirm availability of necessary third party utilities in accordance with operational requirements

1.8 Check safety lines, ropes and air hoists

1.9 Check equipment for safety and operations

2. Prepare to trip tubulars

2.1 Line up trip tank

2.2 Prepare pipe racking system to stand back, run in, lay down or pick-up pipe, where applicable

3. Trip tubulars

3.1 Latch elevators on to the tubulars which is stabilised by the Derrickman while being stabbed by pulling out of the hole

3.2 Latch elevators on to the tubular which is being stabilised by the Derrickman while running into hole

3.3 Visually check the elevator latch, identify faults and report

3.4 Operate air hoist to manoeuvre tubulars in the derrick

3.5 Record tasks where required

4. Operate racking system

4.1 Release pipe from elevators and rack in proper position when pulling out of the hole

4.2 Latch elevators onto drill string and stabilise while stand stabbed by roughnecks when running in the hole

4.3 Operate air hoists which manoeuvre drill string in the derrick


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assingnment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

1. Plan and prepare for operations

1.1 Access, interpret and apply trip pipe documentation and ensure the work activity is compliant

1.2 Obtain, read, interpret, clarify and confirm work requirements

1.3 Identify and address potential risks, hazards and environmental issues and implement control measures

1.4 Select the personal protective equipment appropriate for the work activity

1.5 Resolve coordination requirements with others at the site prior to commencing and during work activities and ensure briefings/handover details are read/passed on

1.6 Confirm availability and status of necessary permits to work in accordance with operational and legislative requirements

1.7 Confirm availability of necessary third party utilities in accordance with operational requirements

1.8 Check safety lines, ropes and air hoists

1.9 Check equipment for safety and operations

2. Prepare to trip tubulars

2.1 Line up trip tank

2.2 Prepare pipe racking system to stand back, run in, lay down or pick-up pipe, where applicable

3. Trip tubulars

3.1 Latch elevators on to the tubulars which is stabilised by the Derrickman while being stabbed by pulling out of the hole

3.2 Latch elevators on to the tubular which is being stabilised by the Derrickman while running into hole

3.3 Visually check the elevator latch, identify faults and report

3.4 Operate air hoist to manoeuvre tubulars in the derrick

3.5 Record tasks where required

4. Operate racking system

4.1 Release pipe from elevators and rack in proper position when pulling out of the hole

4.2 Latch elevators onto drill string and stabilise while stand stabbed by roughnecks when running in the hole

4.3 Operate air hoists which manoeuvre drill string in the derrick

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Access, interpret and apply trip pipe documentation and ensure the work activity is compliant 
Obtain, read, interpret, clarify and confirm work requirements 
Identify and address potential risks, hazards and environmental issues and implement control measures 
Select the personal protective equipment appropriate for the work activity 
Resolve coordination requirements with others at the site prior to commencing and during work activities and ensure briefings/handover details are read/passed on 
Confirm availability and status of necessary permits to work in accordance with operational and legislative requirements 
Confirm availability of necessary third party utilities in accordance with operational requirements 
Check safety lines, ropes and air hoists 
Check equipment for safety and operations 
Line up trip tank 
Prepare pipe racking system to stand back, run in, lay down or pick-up pipe, where applicable 
Latch elevators on to the tubulars which is stabilised by the Derrickman while being stabbed by pulling out of the hole 
Latch elevators on to the tubular which is being stabilised by the Derrickman while running into hole 
Visually check the elevator latch, identify faults and report 
Operate air hoist to manoeuvre tubulars in the derrick 
Record tasks where required 
Release pipe from elevators and rack in proper position when pulling out of the hole 
Latch elevators onto drill string and stabilise while stand stabbed by roughnecks when running in the hole 
Operate air hoists which manoeuvre drill string in the derrick 

Forms

Assessment Cover Sheet

RIIOGD303D - Trip pipe
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

RIIOGD303D - Trip pipe

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: