Assessor Resource

RIIUMM305D
Install and remove a secondary fan

Assessment tool

Version 1.0
Issue Date: May 2024


This unit describes a participant’s skills and knowledge required to install and remove a secondary fan in Metalliferous mining.

This unit is appropriate for those working in operational roles.

Licensing, legislative, regulatory and certification requirements that apply to this unit can vary between states, territories, and Industry sectors. Relevant information must be sourced prior to application of the unit.

You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)



Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

1. Plan and prepare for the installation/removal of secondary fan

1.1. Access, interpret and apply installation of secondary fan documentation and ensure the work activity is compliant

1.2. Obtain, interpret, clarify and confirm work instructions

1.3. Select, and check for faults, equipment/tools for the activity

1.4. Select and wear personal protective equipment appropriate for work activities

1.5. Inspect and assess site conditions and determine if scaling is required and take action

1.6. Perform equipment pre-start checks start-up procedures

1.7. Identify, address and report potential risks and hazards

1.8. Communicate with other equipment operators and personnel using approved communication methods

1.9. Identify, address and report environmental issues

1.10. Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency

1.11. Use approved dust suppression and extraction methods

1.12. Ensure work area is well ventilated before entry

2. Install and maintain secondary fan

2.1. Isolate and lock out ventilation devices

2.2. Install and/or check secondary fan installation structure for soundness

2.3. Install and secure secondary fan using approved methods

2.4. Check secondary fan for correct operation in accordance with maintenance schedule and replace and/or adjust as required

3. Remove secondary fan

3.1. Isolate and lock out ventilation devices

3.2. Safely loosen and remove secondary fan

3.3. Ensure the safety of personnel and associated equipment and services

3.4. Seal any reticulation system openings and prevent entry of foreign material

4. Conduct post operational procedures

4.1. Carry out routine maintenance on equipment

4.2. Clean and store auxiliary services equipment

4.3. Complete housekeeping requirements

4.4. Process written and verbal recording and reporting requirements

Evidence is required to be collected that demonstrates a candidate’s competency in this unit. Evidence must be relevant to the roles within this sector’s work operations and satisfy all of the requirements of the performance criteria of this unit and include evidence that the candidate:

locates and applies relevant documentation, policies and procedures

implements the requirements, procedures and techniques for the safe, effective and efficient completion of secondary fan installation and removal including:

using appropriate dust suppression and extraction methods

works effectively with others to undertake and complete the installation and removal of a secondary fan that meets all of the required outcomes including:

communicating clearly and concisely with others to receive and clarify work instructions, and convey work progress

demonstrates completion of the installation and removal of a secondary fan that safely, effectively and efficiently meets all of the required outcomes on more than one (1) occasion including:

conducting equipment pre-start checks and start-up procedures

completing installing and removing secondary fans

conducting secondary fan installation checks, including;

air filter restriction indicator

computer systems

display instrumentation and gauges (indicators, gauges, levels)

vibration

correct alignment

visual and audio warning devices and lights

types of fans

power source connection

conducting routine maintenance on equipment and housekeeping activities

maintaining written and verbal reporting requirements and procedures

The candidate must demonstrate knowledge in installing and removing a secondary fan through:

capabilities and limitations of secondary fans

operational maintenance schedules and secondary fan installation checks

basic geological and technical data

installation and removal methods for secondary fans

being prepared for fire/accident/emergency

An assessor of this unit must satisfy the requirements of the NVR/AQTF or their successors; and Industry regulations for certification and licensing; and,

this unit must be assessed in the context of this sector’s work environment; and,

this unit must be assessed in compliance with relevant legislation/regulation and using policies, procedures, processes and operational manuals directly related to the industry sector for which it is being assessed; and,

assessment may be conducted in conjunction with the assessment of other Units of Competency; and,

assessment must confirm consistent performance can be applied in a range of relevant workplace circumstances; and,

assessors must demonstrate the performance evidence, and knowledge evidence as outlined in this Unit of Competency, and through the minimum years of current* work experience specified below in an Industry sector relevant to the outcomes of the unit; or,

where the assessor does not meet experience requirements a co-assessment or partnership arrangement must exist between the qualified assessor and an Industry subject matter expert. The Industry subject matter expert should hold the unit being assessed (or an equivalent unit) and/or demonstrate equivalence of skills and knowledge at the unit level. An Industry technical expert must also demonstrate skills and knowledge from the minimum years of current work experience specified below in the Industry sector, including time spent in roles related to the unit being assessed; and,

assessor and Industry subject matter expert requirements differ depending on the Australian Qualifications Framework Level (AQF) of the qualification being assessed and/or Industry Sector as follows:

Industry sector

AQF** Level

Required assessor or Industry subject matter expert experience

Drilling, Metalliferous Mining, Coal Mining, Extractive (Quarrying) and Civil Construction

1

1 Year

2

2 Years

Drilling, Coal Mining and Extractive (Quarrying)

3-6

3 Years

Metalliferous Mining and Civil Construction

3-6

5 Years

Other sectors

Where this Unit is being assessed outside of the Resources and Infrastructure Sectors assessor and/or Industry subject matter expert experience should be in-line with industry standards for the sector in which it is being assessed and where no Industry standard is specified should comply with any relevant regulation.

*Assessors can demonstrate current work experience through employment within Industry in a role relevant to the outcomes of the Unit; or, for external assessors this can be demonstrated through exposure to Industry by conducting frequent site assessments across various locations.

**Where a unit is being delivered outside of a Qualification the first numeric character in the Unit code should be considered to indicate the AQF level


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assingnment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

1. Plan and prepare for the installation/removal of secondary fan

1.1. Access, interpret and apply installation of secondary fan documentation and ensure the work activity is compliant

1.2. Obtain, interpret, clarify and confirm work instructions

1.3. Select, and check for faults, equipment/tools for the activity

1.4. Select and wear personal protective equipment appropriate for work activities

1.5. Inspect and assess site conditions and determine if scaling is required and take action

1.6. Perform equipment pre-start checks start-up procedures

1.7. Identify, address and report potential risks and hazards

1.8. Communicate with other equipment operators and personnel using approved communication methods

1.9. Identify, address and report environmental issues

1.10. Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency

1.11. Use approved dust suppression and extraction methods

1.12. Ensure work area is well ventilated before entry

2. Install and maintain secondary fan

2.1. Isolate and lock out ventilation devices

2.2. Install and/or check secondary fan installation structure for soundness

2.3. Install and secure secondary fan using approved methods

2.4. Check secondary fan for correct operation in accordance with maintenance schedule and replace and/or adjust as required

3. Remove secondary fan

3.1. Isolate and lock out ventilation devices

3.2. Safely loosen and remove secondary fan

3.3. Ensure the safety of personnel and associated equipment and services

3.4. Seal any reticulation system openings and prevent entry of foreign material

4. Conduct post operational procedures

4.1. Carry out routine maintenance on equipment

4.2. Clean and store auxiliary services equipment

4.3. Complete housekeeping requirements

4.4. Process written and verbal recording and reporting requirements

Evidence is required to be collected that demonstrates a candidate’s competency in this unit. Evidence must be relevant to the roles within this sector’s work operations and satisfy all of the requirements of the performance criteria of this unit and include evidence that the candidate:

locates and applies relevant documentation, policies and procedures

implements the requirements, procedures and techniques for the safe, effective and efficient completion of secondary fan installation and removal including:

using appropriate dust suppression and extraction methods

works effectively with others to undertake and complete the installation and removal of a secondary fan that meets all of the required outcomes including:

communicating clearly and concisely with others to receive and clarify work instructions, and convey work progress

demonstrates completion of the installation and removal of a secondary fan that safely, effectively and efficiently meets all of the required outcomes on more than one (1) occasion including:

conducting equipment pre-start checks and start-up procedures

completing installing and removing secondary fans

conducting secondary fan installation checks, including;

air filter restriction indicator

computer systems

display instrumentation and gauges (indicators, gauges, levels)

vibration

correct alignment

visual and audio warning devices and lights

types of fans

power source connection

conducting routine maintenance on equipment and housekeeping activities

maintaining written and verbal reporting requirements and procedures

The candidate must demonstrate knowledge in installing and removing a secondary fan through:

capabilities and limitations of secondary fans

operational maintenance schedules and secondary fan installation checks

basic geological and technical data

installation and removal methods for secondary fans

being prepared for fire/accident/emergency

An assessor of this unit must satisfy the requirements of the NVR/AQTF or their successors; and Industry regulations for certification and licensing; and,

this unit must be assessed in the context of this sector’s work environment; and,

this unit must be assessed in compliance with relevant legislation/regulation and using policies, procedures, processes and operational manuals directly related to the industry sector for which it is being assessed; and,

assessment may be conducted in conjunction with the assessment of other Units of Competency; and,

assessment must confirm consistent performance can be applied in a range of relevant workplace circumstances; and,

assessors must demonstrate the performance evidence, and knowledge evidence as outlined in this Unit of Competency, and through the minimum years of current* work experience specified below in an Industry sector relevant to the outcomes of the unit; or,

where the assessor does not meet experience requirements a co-assessment or partnership arrangement must exist between the qualified assessor and an Industry subject matter expert. The Industry subject matter expert should hold the unit being assessed (or an equivalent unit) and/or demonstrate equivalence of skills and knowledge at the unit level. An Industry technical expert must also demonstrate skills and knowledge from the minimum years of current work experience specified below in the Industry sector, including time spent in roles related to the unit being assessed; and,

assessor and Industry subject matter expert requirements differ depending on the Australian Qualifications Framework Level (AQF) of the qualification being assessed and/or Industry Sector as follows:

Industry sector

AQF** Level

Required assessor or Industry subject matter expert experience

Drilling, Metalliferous Mining, Coal Mining, Extractive (Quarrying) and Civil Construction

1

1 Year

2

2 Years

Drilling, Coal Mining and Extractive (Quarrying)

3-6

3 Years

Metalliferous Mining and Civil Construction

3-6

5 Years

Other sectors

Where this Unit is being assessed outside of the Resources and Infrastructure Sectors assessor and/or Industry subject matter expert experience should be in-line with industry standards for the sector in which it is being assessed and where no Industry standard is specified should comply with any relevant regulation.

*Assessors can demonstrate current work experience through employment within Industry in a role relevant to the outcomes of the Unit; or, for external assessors this can be demonstrated through exposure to Industry by conducting frequent site assessments across various locations.

**Where a unit is being delivered outside of a Qualification the first numeric character in the Unit code should be considered to indicate the AQF level

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Access, interpret and apply installation of secondary fan documentation and ensure the work activity is compliant 
Obtain, interpret, clarify and confirm work instructions 
Select, and check for faults, equipment/tools for the activity 
Select and wear personal protective equipment appropriate for work activities 
Inspect and assess site conditions and determine if scaling is required and take action 
Perform equipment pre-start checks start-up procedures 
Identify, address and report potential risks and hazards 
Communicate with other equipment operators and personnel using approved communication methods 
Identify, address and report environmental issues 
Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency 
Use approved dust suppression and extraction methods 
Ensure work area is well ventilated before entry 
Isolate and lock out ventilation devices 
Install and/or check secondary fan installation structure for soundness 
Install and secure secondary fan using approved methods 
Check secondary fan for correct operation in accordance with maintenance schedule and replace and/or adjust as required 
Isolate and lock out ventilation devices 
Safely loosen and remove secondary fan 
Ensure the safety of personnel and associated equipment and services 
Seal any reticulation system openings and prevent entry of foreign material 
Carry out routine maintenance on equipment 
Clean and store auxiliary services equipment 
Complete housekeeping requirements 
Process written and verbal recording and reporting requirements 
Access, interpret and apply installation of secondary fan documentation and ensure the work activity is compliant 
Obtain, interpret, clarify and confirm work instructions 
Select, and check for faults, equipment/tools for the activity 
Select and wear personal protective equipment appropriate for work activities 
Inspect and assess site conditions and determine if scaling is required and take action 
Perform equipment pre-start checks start-up procedures 
Identify, address and report potential risks and hazards 
Communicate with other equipment operators and personnel using approved communication methods 
Identify, address and report environmental issues 
Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency 
Use approved dust suppression and extraction methods 
Ensure work area is well ventilated before entry 
Isolate and lock out ventilation devices 
Install and/or check secondary fan installation structure for soundness 
Install and secure secondary fan using approved methods 
Check secondary fan for correct operation in accordance with maintenance schedule and replace and/or adjust as required 
Isolate and lock out ventilation devices 
Safely loosen and remove secondary fan 
Ensure the safety of personnel and associated equipment and services 
Seal any reticulation system openings and prevent entry of foreign material 
Carry out routine maintenance on equipment 
Clean and store auxiliary services equipment 
Complete housekeeping requirements 
Process written and verbal recording and reporting requirements 

Forms

Assessment Cover Sheet

RIIUMM305D - Install and remove a secondary fan
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

RIIUMM305D - Install and remove a secondary fan

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: