This unit develops a participant’s skills and knowledge required to drain and dewater civil construction sites in Civil construction.
This unit is appropriate for those working in operational roles.
No licensing, legislation or certification requirements apply to this unit at the time of publication.
You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)
Evidence Required
List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.
1. Plan and prepare for draining and dewatering
1.1 Access, interpret and apply drain and dewatering documentation and ensure the work activity is compliant
1.2 Obtain, read, interpret, clarify and confirm work requirements
1.3 Identify, obtain and implement traffic signage requirements
1.4 Select and inspect required plant, tools and equipment and rectify/report any faults
1.5 Identify, clarify and apply environmental protection requirements
1.6 Identify and address potential risks, hazards and environmental issues, and implement control measures
1.7 Select and wear personal protective equipment appropriate for work activities
2. Position sedimentation control
2.1 Position sedimentation controls
2.2 Construct sedimentation control barriers
2.3 Position geo-fabrics and/or woven wire
3. Remove surface water
3.1 Establish temporary drainage systems and drain or divert surface and sub-surface water to the storm water drainage system
3.2 Remove slab and site surface water and/or direct to the temporary drainage system
3.3 Fill surface holes and depressions
3.4 Drain surface water to drainage system using adequate fall
4. Construct sump/wells
4.1 Locate sump and/or well at the lowest point to be drained
4.2 Construct sumps and/or wells
5. Remove water from sumps/wells, trenches and pits
5.1 Install surface or submersible pumps
5.2 Locate surface pump as close as practicable to the sump or well
5.3 Pump water to temporary drainage system
5.4 Disperse discharged water
6. Clean up
6.1 Clear work area and dispose of or recycle materials
6.2 Clean, check, maintain and store plant, tools and equipment
Submission Requirements
List each assessment task's title, type (eg project, observation/demonstration, essay, assingnment, checklist) and due date here
Assessment task 1: [title] Due date:
(add new lines for each of the assessment tasks)
Assessment Tasks
Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.
1. Plan and prepare for draining and dewatering
1.1 Access, interpret and apply drain and dewatering documentation and ensure the work activity is compliant
1.2 Obtain, read, interpret, clarify and confirm work requirements
1.3 Identify, obtain and implement traffic signage requirements
1.4 Select and inspect required plant, tools and equipment and rectify/report any faults
1.5 Identify, clarify and apply environmental protection requirements
1.6 Identify and address potential risks, hazards and environmental issues, and implement control measures
1.7 Select and wear personal protective equipment appropriate for work activities
2. Position sedimentation control
2.1 Position sedimentation controls
2.2 Construct sedimentation control barriers
2.3 Position geo-fabrics and/or woven wire
3. Remove surface water
3.1 Establish temporary drainage systems and drain or divert surface and sub-surface water to the storm water drainage system
3.2 Remove slab and site surface water and/or direct to the temporary drainage system
3.3 Fill surface holes and depressions
3.4 Drain surface water to drainage system using adequate fall
4. Construct sump/wells
4.1 Locate sump and/or well at the lowest point to be drained
4.2 Construct sumps and/or wells
5. Remove water from sumps/wells, trenches and pits
5.1 Install surface or submersible pumps
5.2 Locate surface pump as close as practicable to the sump or well
5.3 Pump water to temporary drainage system
5.4 Disperse discharged water
6. Clean up
6.1 Clear work area and dispose of or recycle materials
6.2 Clean, check, maintain and store plant, tools and equipment
Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.
Observation Checklist
Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice
Yes
No
Comments/feedback
Access, interpret and apply drain and dewatering documentation and ensure the work activity is compliant
Obtain, read, interpret, clarify and confirm work requirements
Identify, obtain and implement traffic signage requirements
Select and inspect required plant, tools and equipment and rectify/report any faults
Identify, clarify and apply environmental protection requirements
Identify and address potential risks, hazards and environmental issues, and implement control measures
Select and wear personal protective equipment appropriate for work activities
Position sedimentation controls
Construct sedimentation control barriers
Position geo-fabrics and/or woven wire
Establish temporary drainage systems and drain or divert surface and sub-surface water to the storm water drainage system
Remove slab and site surface water and/or direct to the temporary drainage system
Fill surface holes and depressions
Drain surface water to drainage system using adequate fall
Locate sump and/or well at the lowest point to be drained
Construct sumps and/or wells
Install surface or submersible pumps
Locate surface pump as close as practicable to the sump or well
Pump water to temporary drainage system
Disperse discharged water
Clear work area and dispose of or recycle materials
Clean, check, maintain and store plant, tools and equipment
Access, interpret and apply drain and dewatering documentation and ensure the work activity is compliant
Obtain, read, interpret, clarify and confirm work requirements
Identify, obtain and implement traffic signage requirements
Select and inspect required plant, tools and equipment and rectify/report any faults
Identify, clarify and apply environmental protection requirements
Identify and address potential risks, hazards and environmental issues, and implement control measures
Select and wear personal protective equipment appropriate for work activities
Position sedimentation controls
Construct sedimentation control barriers
Position geo-fabrics and/or woven wire
Establish temporary drainage systems and drain or divert surface and sub-surface water to the storm water drainage system
Remove slab and site surface water and/or direct to the temporary drainage system
Fill surface holes and depressions
Drain surface water to drainage system using adequate fall
Locate sump and/or well at the lowest point to be drained
Construct sumps and/or wells
Install surface or submersible pumps
Locate surface pump as close as practicable to the sump or well
Pump water to temporary drainage system
Disperse discharged water
Clear work area and dispose of or recycle materials
Clean, check, maintain and store plant, tools and equipment
Forms
Assessment Cover Sheet
RIIWMG203D - Drain and dewater civil construction site
Assessment task 1: [title]
Student name:
Student ID:
I declare that the assessment tasks submitted for this unit are my own work.
Student signature:
Result: Competent Not yet competent
Feedback to student
Assessor name:
Signature:
Date:
Assessment Record Sheet
RIIWMG203D - Drain and dewater civil construction site
Student name:
Student ID:
Assessment task 1: [title] Result: Competent Not yet competent
(add lines for each task)
Feedback to student:
Overall assessment result: Competent Not yet competent