Assessor Resource
UEENEED009B
Develop, enter and verify programs for industrial control systems using high level instructions
Assessment tool
Version 1.0
Issue Date: April 2024
4)
This unit is intended to augment formally-acquired competencies. It is suitable for employment-based programs under an approved contract of training.
Note:1. Compliance with permits may be required in various jurisdictions and typically relates to the operation of plant, machinery and equipment such as elevating work platforms, powder operated fixing tools, power operated tools, vehicles, road signage and traffic control, lifting equipment. Permits may also be required for some work environments such as confined spaces, working aloft, near live electrical apparatus, site rehabilitation.
2. Compliance may be required in various jurisdictions relating to currency in First Aid, confined space, lifting and risk safety measures.
1)
1.1)
This unit covers development, installation and testing of programs for an industrial system requiring advance control functions. It encompasses working safely, using structure logic, acceptable design techniques, applying knowledge of high level instructions, and documenting development and programming activities.
You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)