Prerequisite Unit(s)
4)
Competencies
4.1)
Granting competency in this unit shall be made only after competency in the following unit(s) has/have been confirmed.
UEENEEE102A
Fabricate, assemble and dismantle utilities industry components
UEENEEE105A
Fix and secure electrotechnology equipment
UEENEEJ102A
Prepare and connect refrigerant tubing and fittings
UEENEEJ103A
Establish the basic operating conditions of vapour compression systems
UEENEEJ104A
Establish the basic operating conditions of air conditioning systems
UEENEEJ106A
Install refrigerant pipe work, flow controls and accessories
UEENEEJ107A
Install air conditioning and refrigeration systems, major components and associated equipment
UEENEEJ108A
Recover, pressure test, evacuate, charge and leak test refrigerants
UEENEEJ111A
Diagnose and rectify faults in air conditioning and refrigeration systems and components
UEENEEJ113A
Commission air conditioning and refrigeration systems
UEENEEJ153A
Find and rectify fault motors and associated controls in refrigeration and air conditioning
UEENEEJ170A
Diagnose and rectify faults in air conditioning and refrigeration control systems
UEENEEP013A
Disconnect / reconnect control devices connected to low voltage installation wiring
UEENEEP016A
Locate and rectify faults in low voltage appliances using set procedures
For the full prerequisite chain details for this unit please refer to Table 2 in Volume 1, Part 2
Literacy and numeracy skills
4.2)
Participants are best equipped to achieve competency in this unit if they have reading, writing and numeracy skills indicated by the following scales. Description of each scale is given in Volume 2, Part 3 ‘Literacy and Numeracy’
Reading
3
Writing
3
Numeracy
3