Assessor Resource

UEERE0011
Design grid-connected photovoltaic power supply systems

Assessment tool

Version 1.0
Issue Date: May 2024


This unit involves the skills and knowledge required to design grid-connected photovoltaic (PV) power supply systems.

It includes preparing to design, and developing and obtaining approval for grid connected power supply systems. It also includes designing grid-connected PV power supply system installation, following design briefs, incorporating schemes for protection of persons and property from dangers of system malfunctions, ensuring safety and performance standards and functional requirements are meet, and documenting design calculations and criteria.

No licensing, legislative or certification requirements apply to this unit at the time of publication.

You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)



Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements and performance criteria on at least one occasion and include:

developing outlines of alternative designs

developing the design within the safety and functional requirements and budget limitations

documenting and presenting design effectively

successfully negotiating design alteration requests

obtaining approval for final design

dealing with unplanned events

applying relevant work health and safety (WHS)/occupational health and safety (OHS) requirements

designing grid-connected photovoltaic (PV) power supply system

identifying and applying industry regulations

meeting scheduled timelines

working with relevant person/s.

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements and performance criteria and include knowledge of:

PV power systems design principles, including:

site survey encompassing:

declination angle, reflectance, sunshine hours, extra-terrestrial irradiation

energy efficiency techniques relevant for domestic dwelling and commercial premises to reduce the electrical energy demand

energy efficient initiatives that could be implemented by the site owner

assessing WHS/OHS risks when working on a particular site

solar access for the site

shading and estimates of its effect on the system

solar resource for the site

available area for the solar array

roof is suitable for mounting the array

modules mounted on the roof

switchboard or distribution board is located for connecting the output of inverter

array junction box (if required) and location of inverter

cabling route and estimates of the lengths of the cable runs

monitoring panels or screens and determining a suitable location with the site owner

PV arrays selection encompassing:

selection and sizing of PV array for a grid-connected inverter system, based on annual energy demand, budget constraints, architectural constraints or limitations on available inverter sizes

determining the minimum and maximum number of PV modules in a string for the specified voltage

system components selection encompassing:

balance of the system components, including cabling, circuit protection and isolation equipment for a grid-connected PV system

energy yield, specific energy yield and performance ratio for system

schematic diagrams of common grid-connected inverter circuit configurations, including metering arrangements, isolation and connection with respect to residual circuit devices (RCDs)

major installation details for a proposed grid-connected inverter system, based on the requirements set out in AS/NZS 4777 Grid connection of energy systems via inverters and AS/NZS 5033 Installation and safety requirements for photovoltaic (PV) arrays

other design considerations encompassing:

major non-technical considerations impacting on the design, installation and operation of grid-connected PV systems, including economic, financial, contractual, institutional, legislative and regulatory

calculation of the annual reduction in greenhouse gas emissions achieved by a given PV power system at a given location

inverters encompassing:

types of inverters used in grid connected systems

Australian Standard symbol for a low voltage (LV) inverter

the basic function of an inverter

simple block diagram of a typical inverter used in grid-connected system

inverter operation encompassing:

the basic principle of operation of a single phase inverter (using switch analogue)

the operation of an inverter bridge and half-bridge configuration

operation of a FET inverter

connection of a grid inverter and measurement of the inverter parameters for various loads

inverter characteristics encompassing:

the characteristics which distinguish inverters suitable for grid-connected PV array application from standard inverters

using waveform diagrams, the function of PWM techniques in square wave, modified square wave and synthesised sine wave inverters

output voltage waveforms for square wave, modified square wave and synthesized sine wave inverters showing typical voltages and periodic times

the six (6) essential inverter specifications

PV grid-connected system operation encompassing:

block diagram of a PV grid-connected system

operation of grid interactive PV systems, including synchronisation, safety feature, power flow control, passive and active anti-islanding, and metered energy for systems

schematic diagrams of common grid-connected inverter circuit configurations, including metering arrangements, isolation and connection with respect to RCDs in accordance with AS/NZS 4777.1 Grid connection of energy systems via inverters - Installation requirements

grid-connected inverter selection encompassing:

operating window of the inverter for the expected minimum and maximum effective cell temperatures

selection of an inverter rating with respect to the output power of the array/s

major installation requirements for all system components which will ensure correct operation, long life, safety and ease of maintenance consistent with AS/NZS 4509 Stand-alone power systems, AS 4086.2 Secondary batteries for use with stand-alone power systems - Installation and maintenance, AS/NZS 3000 and relevant WHS/OHS guidelines

selection of a suitable location for the PV array, inverter and other components, at a given installation site in accordance with AS 2676.2 Guide to the installation, maintenance, testing and replacement of secondary batteries in buildings - Sealed cells and AS 3011.2 Electrical installations - Secondary batteries installed in buildings Sealed cells, and the considerations given in AS/NZS4509 Stand-alone power systems and AS 4086.2 Secondary batteries for use with stand-alone power systems - Installation and maintenance

typical installation configurations for grid connection of energy systems via inverters

function and operation of a grid protection device as specified in AS/NZS 4777 Grid connection of energy systems via inverters

draft array wiring plan for series connected modules to minimise power loss due to shading at a particular site

installation requirements for a grid connected system

labelling and signage requirements for switchboards supplied with power from grid connected inverters, as set out in AS/NZS 4777.1 Grid connection of energy systems via inverters Installation requirements

the additional requirements for UPS systems as specified in AS/NZS 4777.1 Grid connection of energy systems via inverters - Installation requirements

relevant manufacturer specifications

relevant risk mitigation processes

relevant WHS/OHS legislated requirements

relevant workplace documentation

relevant workplace policies and procedures

budgeting methods

design briefs

grid systems

hybrid power systems

quality assurance requirements.

Assessors must hold credentials specified within the Standards for Registered Training Organisations current at the time of assessment.

Assessment must satisfy the Principles of Assessment and Rules of Evidence and all regulatory requirements included within the Standards for Registered Training Organisations current at the time of assessment.

Assessment must occur in workplace operational situations where it is appropriate to do so; where this is not appropriate, assessment must occur in simulated workplace operational situations that replicate workplace conditions.

Assessment processes and techniques must be appropriate to the language, literacy and numeracy requirements of the work being performed and the needs of the candidate.

Resources for assessment must include access to:

a range of relevant exercises, case studies and/or other simulations

relevant and appropriate materials, tools, equipment and personal protective equipment (PPE) currently used in industry

applicable documentation, including workplace procedures, equipment specifications, regulations, codes of practice and operation manuals.


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assingnment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions may be found in the UEE Electrotechnology Training Package Companion Volume Implementation Guide.

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements and performance criteria on at least one occasion and include:

developing outlines of alternative designs

developing the design within the safety and functional requirements and budget limitations

documenting and presenting design effectively

successfully negotiating design alteration requests

obtaining approval for final design

dealing with unplanned events

applying relevant work health and safety (WHS)/occupational health and safety (OHS) requirements

designing grid-connected photovoltaic (PV) power supply system

identifying and applying industry regulations

meeting scheduled timelines

working with relevant person/s.

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements and performance criteria and include knowledge of:

PV power systems design principles, including:

site survey encompassing:

declination angle, reflectance, sunshine hours, extra-terrestrial irradiation

energy efficiency techniques relevant for domestic dwelling and commercial premises to reduce the electrical energy demand

energy efficient initiatives that could be implemented by the site owner

assessing WHS/OHS risks when working on a particular site

solar access for the site

shading and estimates of its effect on the system

solar resource for the site

available area for the solar array

roof is suitable for mounting the array

modules mounted on the roof

switchboard or distribution board is located for connecting the output of inverter

array junction box (if required) and location of inverter

cabling route and estimates of the lengths of the cable runs

monitoring panels or screens and determining a suitable location with the site owner

PV arrays selection encompassing:

selection and sizing of PV array for a grid-connected inverter system, based on annual energy demand, budget constraints, architectural constraints or limitations on available inverter sizes

determining the minimum and maximum number of PV modules in a string for the specified voltage

system components selection encompassing:

balance of the system components, including cabling, circuit protection and isolation equipment for a grid-connected PV system

energy yield, specific energy yield and performance ratio for system

schematic diagrams of common grid-connected inverter circuit configurations, including metering arrangements, isolation and connection with respect to residual circuit devices (RCDs)

major installation details for a proposed grid-connected inverter system, based on the requirements set out in AS/NZS 4777 Grid connection of energy systems via inverters and AS/NZS 5033 Installation and safety requirements for photovoltaic (PV) arrays

other design considerations encompassing:

major non-technical considerations impacting on the design, installation and operation of grid-connected PV systems, including economic, financial, contractual, institutional, legislative and regulatory

calculation of the annual reduction in greenhouse gas emissions achieved by a given PV power system at a given location

inverters encompassing:

types of inverters used in grid connected systems

Australian Standard symbol for a low voltage (LV) inverter

the basic function of an inverter

simple block diagram of a typical inverter used in grid-connected system

inverter operation encompassing:

the basic principle of operation of a single phase inverter (using switch analogue)

the operation of an inverter bridge and half-bridge configuration

operation of a FET inverter

connection of a grid inverter and measurement of the inverter parameters for various loads

inverter characteristics encompassing:

the characteristics which distinguish inverters suitable for grid-connected PV array application from standard inverters

using waveform diagrams, the function of PWM techniques in square wave, modified square wave and synthesised sine wave inverters

output voltage waveforms for square wave, modified square wave and synthesized sine wave inverters showing typical voltages and periodic times

the six (6) essential inverter specifications

PV grid-connected system operation encompassing:

block diagram of a PV grid-connected system

operation of grid interactive PV systems, including synchronisation, safety feature, power flow control, passive and active anti-islanding, and metered energy for systems

schematic diagrams of common grid-connected inverter circuit configurations, including metering arrangements, isolation and connection with respect to RCDs in accordance with AS/NZS 4777.1 Grid connection of energy systems via inverters - Installation requirements

grid-connected inverter selection encompassing:

operating window of the inverter for the expected minimum and maximum effective cell temperatures

selection of an inverter rating with respect to the output power of the array/s

major installation requirements for all system components which will ensure correct operation, long life, safety and ease of maintenance consistent with AS/NZS 4509 Stand-alone power systems, AS 4086.2 Secondary batteries for use with stand-alone power systems - Installation and maintenance, AS/NZS 3000 and relevant WHS/OHS guidelines

selection of a suitable location for the PV array, inverter and other components, at a given installation site in accordance with AS 2676.2 Guide to the installation, maintenance, testing and replacement of secondary batteries in buildings - Sealed cells and AS 3011.2 Electrical installations - Secondary batteries installed in buildings Sealed cells, and the considerations given in AS/NZS4509 Stand-alone power systems and AS 4086.2 Secondary batteries for use with stand-alone power systems - Installation and maintenance

typical installation configurations for grid connection of energy systems via inverters

function and operation of a grid protection device as specified in AS/NZS 4777 Grid connection of energy systems via inverters

draft array wiring plan for series connected modules to minimise power loss due to shading at a particular site

installation requirements for a grid connected system

labelling and signage requirements for switchboards supplied with power from grid connected inverters, as set out in AS/NZS 4777.1 Grid connection of energy systems via inverters Installation requirements

the additional requirements for UPS systems as specified in AS/NZS 4777.1 Grid connection of energy systems via inverters - Installation requirements

relevant manufacturer specifications

relevant risk mitigation processes

relevant WHS/OHS legislated requirements

relevant workplace documentation

relevant workplace policies and procedures

budgeting methods

design briefs

grid systems

hybrid power systems

quality assurance requirements.

Assessors must hold credentials specified within the Standards for Registered Training Organisations current at the time of assessment.

Assessment must satisfy the Principles of Assessment and Rules of Evidence and all regulatory requirements included within the Standards for Registered Training Organisations current at the time of assessment.

Assessment must occur in workplace operational situations where it is appropriate to do so; where this is not appropriate, assessment must occur in simulated workplace operational situations that replicate workplace conditions.

Assessment processes and techniques must be appropriate to the language, literacy and numeracy requirements of the work being performed and the needs of the candidate.

Resources for assessment must include access to:

a range of relevant exercises, case studies and/or other simulations

relevant and appropriate materials, tools, equipment and personal protective equipment (PPE) currently used in industry

applicable documentation, including workplace procedures, equipment specifications, regulations, codes of practice and operation manuals.

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Work health and safety (WHS)/occupational health and safety (OHS) requirements and workplace procedures are identified and applied 
 
 
 
Grid-connected power supply systems, performance standards and compliance methods are applied to the design 
 
 
 
 
 
Grid-connected power supply system design is presented and explained to client and/or relevant person/s 
 
 
 

Forms

Assessment Cover Sheet

UEERE0011 - Design grid-connected photovoltaic power supply systems
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

UEERE0011 - Design grid-connected photovoltaic power supply systems

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: