micro-hydro systems ELV installation and maintenance processes, including: micro-hydro systems ELV installation processes encompassing: selection of an appropriate micro-hydro system taking into account the topology of the site, local council approvals, environmental considerations, site access and transport of equipment, water and power transmission distances, and daily and seasonal load profiles appropriate methods and safety procedures for dam or weir construction, watercourse construction and/or penstock installation, and turbine installation appropriate installation, testing, commissioning, fault diagnosis and rectification procedures using appropriate safety procedures schematic and wiring diagrams for the micro-hydro system showing the general circuit layout and protection between the micro-hydro system, batteries, inverter and loads according to Australian Standards AS/NZS 3000 Electrical installations (known as the Australian/New Zealand Wiring Rules), AS/NZS 4509 Stand-alone power systems, and AS 4086.2 Secondary batteries for use with stand-alone power systems - Installation and maintenance requirements safety procedures for the installation, commissioning, fault diagnosis of system components micro-hydro systems maintenance processes encompassing: appropriate maintenance methods using appropriate safety procedures maintenance schedule for the system safety procedures for the maintenance of system components relevant manufacturer specifications relevant safe work method statements (SWMS)/job safety assessments or risk mitigation processes relevant WHS/OHS legislated requirements relevant workplace documentation relevant workplace policies and procedures. |