Assessor Resource

UEGNSG109
Control field pipeline operations

Assessment tool

Version 1.0
Issue Date: May 2024


This unit involves the skills and knowledge required to control and monitor field pipeline operations on a gas pipeline.

It includes controlling and shutting down pipeline systems in case of emergencies, monitoring and identifying faults, selecting and using relevant tools and equipment, and completing relevant documentation and reports

No licensing, legislative or certification requirements apply to this unit at the time of publication.

You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)

Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assingnment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions may be found in the UEG Gas Training Industry Package Companion Volume Implementation Guide.

resources must include at least seven (7) of the following:

process control equipment

station power supply

heaters and heat exchanges

station instrumentation

drawings and schematics

metering equipment and gas analysis equipment

valves, actuators and flanges

compressors and prime movers

sumps and drains

pipeline inspection gauges (PIGs)

monitoring systems must include at least four (4) of the following:

use of fire and gas extinguishing and deluge systems

emergency systems

alarm and communication systems

supervisory control and data acquisition (SCADA)

prime wovers and compression systems

shutdown systems

pipeline faults must include the following:

gas leaks

electrical problems

compressor or pump failure

out-of-current inspection status

gauge failure or hose rupture leaks

instruments out of calibration

non-flow of gas

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Work schedule, drawings, plans, job requirements and material lists are obtained, analysed and confirmed by site inspection, as necessary, and work planned and coordinated in accordance with workplace procedures 
 
 
 
 
 
 
 
 
 
 
WHS/OHS risk control measures and environmental policies and procedures are followed in accordance with workplace procedures 
 
 
 
 
 
 
 
Emergency shutdown procedures are applied to equipment failure and work undertaken in accordance with workplace procedures 
 
 
 
 

Forms

Assessment Cover Sheet

UEGNSG109 - Control field pipeline operations
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

UEGNSG109 - Control field pipeline operations

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: