Assessor Resource

UEGNSG139
Repair and maintain stationary gas fuelled turbine engines

Assessment tool

Version 1.0
Issue Date: May 2024


This unit involves the skills and knowledge required to isolate, disconnect, repair, reconnect and maintain stationary gas fuelled turbine engines up to a capacity of 5 gigajoule per hour (GJ/hr) (1,300 kilowatt).

It includes disconnecting, carrying out repairs and replacing fuel train components to stationary gas fuelled turbine engine. Reconnecting the gas fuelled turbine engine includes pre-start tests, start up, adjusting components and controls to safe and efficient operation, and completing all required documentation.

This unit does not cover:

repairs to the internal mechanical components of the engine

modifications to gas fuelled turbine engine.

Note: 500 kw equates to a gas input of approximately 6 GJ/hr.

The application of the skills and knowledge described in this unit may require a license or permit to practice in the workplace.

Other conditions may apply under state and territory legislative and regulatory licencing requirements which must be confirmed prior to commencing this unit.

No licensing, legislative or certification requirements apply to this unit at the time of publication.

You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)

Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assingnment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions may be found in the UEG Gas Industry Companion Volume Implementation Guide.

repairing and maintaining stationary gas fuelled turbine engine up to a capacity of 5 GJ/hr (1300kw), must include each of the following:

gas fuel train pipe-work, regulators, valves, metering and protective devices from gas pipeline to the engine.

flue/exhaust system

pressure testing and purging gas fuel train

disconnecting and reconnecting gas fuelled turbine engines, and adjusting components and controls to safe and efficient operation

repairing and maintaining of stationary gas fuelled turbine engine must not include the following:

repairs to the internal mechanical components of the engine

modifications to gas fuelled turbine engine

gas fuels must include one (1) of the following:

natural gas

liquified petroleum gas (LPG)

synthetic natural gas (SNG)

bio-gas

waste gas or sewage gas

used as a single gas fuel or part of a dual fuel system

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Work health and safety (WHS)/occupational health and safety (OHS) workplace procedures for a given work area are identified, obtained and applied 
 
 
 
 
 
 
 
 
 
WHS/OHS risk control measures and workplace procedures for carrying out work activities are followed 
 
 
 
 
 
 
 
 
 
 
 
 
 
WHS/OHS work completion risk control measures and workplace procedures are followed 
 
 
 
 
 

Forms

Assessment Cover Sheet

UEGNSG139 - Repair and maintain stationary gas fuelled turbine engines
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

UEGNSG139 - Repair and maintain stationary gas fuelled turbine engines

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: