Assessor Resource
UEGNSG139A
Repair and maintain stationary gas fuelled turbine engines
Assessment tool
Version 1.0
Issue Date: May 2024
Application of the Unit
2)
2.1) General Application
This competency standard unit is suitable for employment-based programs under an approved contract of training at the AQF level of the qualification in which the unit is first packaged or higher.
The unit may be selected as an elective unit (see qualification packaging rules) provided that all prerequisite units are undertaken or addressed through recognition processes.
This unit may be included in a skill set.
2.2) Importation
RTOs wishing to import this unit into any qualification under the flexibility provisions of NQC/NSSC Training Package Policy should ensure all pre-requisite units are also imported into the relevant Training Package and qualification.
1) Scope
1.1) Descriptor
This unit covers the isolation, disconnecting, repairing, reconnecting and maintenance of stationary gas fuelled turbine engines up to a capacity of 5GJ/hr (1300kw), for approval where required.
It encompasses working safely and to relevant standards disconnecting, carry out repairs and replacement of fuel train components to given specifications. Reconnecting the engine including: pre start tests, start up, adjusting components and controls to safe and efficient operation. Completing all required documentation.
Note: 500kw equates to a gas input of approximately 6Gj/hr.
You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)