Assessor Resource

UEGNSG228
Construct and lay large copper gas distribution pipelines

Assessment tool

Version 1.0
Issue Date: May 2024


This unit involves the skills and knowledge required to construct and lay copper gas distribution pipelines and services above 20 mm diameter.

It includes using relevant tools and equipment, completing necessary documentation, and working safely in accordance with workplace procedures and relevant legislative, standard and code requirements.

No licensing, legislative or certification requirements apply to this unit at the time of publication.

You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)

Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assingnment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions may be found in the UEG Gas Industry Training Package Companion Volume Implementation Guide.

competency must be demonstrated by constructing and laying copper gas distribution pipelines and services above 20 mm diameter and include:

laying and cutting pipes

joining pipes and fittings

installing the meter connection to the services users

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Work health and safety (WHS)/occupational health and safety (OHS) workplace procedures and environmental measures for the site are identified, obtained and applied 
 
 
 
 
 
 
 
 
 
 
WHS/OHS and environmental risk control measures, schedule of work and workplace procedures for carrying out work are followed 
 
 
 
 
 
 
 
 
WHS/OHS and environmental risk control measures for work completion are followed 
 
 
 
 

Forms

Assessment Cover Sheet

UEGNSG228 - Construct and lay large copper gas distribution pipelines
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

UEGNSG228 - Construct and lay large copper gas distribution pipelines

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: