Coordinate the operation of relevant plant and equipment for transmission pipeline construction

Assessment tool

Version 1.0
Issue Date: May 2024


This unit involves the skills and knowledge required to coordinate the operation of relevant plant and equipment necessary for the construction of transmission pipelines.

It includes preparing for transmission pipeline construction, operating relevant plant and equipment for transmission pipeline construction, and completing work and relevant documentation.

Plant and equipment used for transmission pipeline construction may include excavator and vacuum lift, bending machine and mandrels, internal line up clamp, tack rig, side boom, roller cradles, rock saw, bucket wheel trencher, sand blasting unit, thermal coil, over ditch wrapping machine, padding machines and mitsu bucket.

No licensing, legislative or certification requirements apply to this unit at the time of publication.

You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)

Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assingnment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions may be found in the UEG Gas Industry Training Package Companion Volume Implementation Guide.

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Job instructions are obtained and confirmed with relevant person/s 
 
 
 
 
 
 
 
 
 
WHS/OHS risk control measures and policies and procedures are followed in accordance with workplace procedures 
 
 
 
 
 
 
 
Pipeline easement work undertaken is checked against work schedule for conformance with job requirements and anomalies reported to authorised person/s in accordance with workplace procedures 
 
 
 
 
 

Forms

Assessment Cover Sheet

UEGNSG325 - Coordinate the operation of relevant plant and equipment for transmission pipeline construction
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

UEGNSG325 - Coordinate the operation of relevant plant and equipment for transmission pipeline construction

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: