Assessor Resource

UEGNSG333
Work in proximity of transmission pipeline construction plant and equipment

Assessment tool

Version 1.0
Issue Date: May 2024


This unit involves the skills and knowledge required to work in proximity of gas transmission construction plant and equipment, and complete work and documentation in accordance with relevant legislations, codes of practice, regulations, industry standards and workplace procedures.

It includes the operating parameters and safety issues of a range of specific plant and equipment dedicated to the construction of transmission pipelines at a construction work site.

No licensing, legislative or certification requirements apply to this unit at the time of publication.

You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)

Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assingnment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions may be found in the UEG Gas Industry Training Package Companion Volume Implementation Guide.

backfilling must include at least one (1) of the following items of plant and equipment:

padding machine

excavator

grader

dozer

front end loader

clearing and grading must include at least one (l) of the following items of plant and equipment:

dozer

excavator

grader

backhoe

front end loader

ditching must include at least one (1) of the following items of plant and equipment:

excavator

rock saw

bucket wheel trencher

hydro-testing must include at least one (1) of the following items of plant and equipment:

crane truck

side boom

rough terrain crane

joint coating must include at least one (1) of the following items of plant and equipment:

sand blasting rig (skid steer)

over ditch wrapping machine

thermal coil

lowering and laying must include at least one (1) of the following items of plant and equipment:

side boom with roller cradles

excavator

performing mechanical (minor maintenance) must include at least four (4) of the following items of plant and equipment:

excavator and vacuum lift

bending machine and mandrels

internal line up clamp

tack rig

side boom

roller cradles

rock saw

bucket wheel trencher

thermal coil

over ditch wrapping machine

padding machines

mitsu bucket

stringing and bending must include at least one (1) of the following items of plant and equipment:

excavator

bending machine with mandrels

side boom

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Work health and safety (WHS)/occupational health and safety (OHS) workplace procedures and environmental measures for the site are identified, obtained and applied 
 
 
 
 
 
 
 
 
 
 
 
WHS/OHS risk control measures, schedule of work and workplace procedures for carrying out the work are followed 
 
 
 
 
 
 
 
WHS/OHS risk control measures for work completion are followed 
 
 
 
 

Forms

Assessment Cover Sheet

UEGNSG333 - Work in proximity of transmission pipeline construction plant and equipment
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

UEGNSG333 - Work in proximity of transmission pipeline construction plant and equipment

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: