Assessor Resource

UEGNSG348
Supervise the operation of plant and equipment for the construction of gas transmission pipelines

Assessment tool

Version 1.0
Issue Date: May 2024


This unit involves the skills and knowledge required to supervise the operation of plant and equipment for the construction of gas transmission pipelines.

It includes undertaking functions for transmission pipeline construction, including interpreting instructions; knowing the capabilities and limits of plant, equipment and tools; and effective communication and supervision of personnel. It also includes supervising operations to ensure work health and safety (WHS)/occupational health and safety (OHS), environmental and cultural heritage issues are effectively addressed in the transmission pipeline construction process.

No licensing, legislative or certification requirements apply to this unit at the time of publication.

You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)

Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assingnment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions may be found in the UEG Gas Industry Training Package Companion Volume Implementation Guide.

large plant and equipment must include at least two (2) of the following:

excavator with vacuum lift

bending machine with mandrel

rock saw

bucket wheel

backfill plant and equipment include the following:

padding machine

excavator

grader

dozer

front end loader

clear and grade plant and equipment includes the following:

dozer

excavator

grader

backhoe

front end loader

ditching plant and equipment includes the following:

excavator

rock saw

bucket wheel trencher

hydrostatic testing plant and equipment includes the following:

crane truck

side boom

rough terrain crane

joint coating plant and equipment includes the following:

grit blasting rig over ditch wrapping machine

thermal coil

lower and lay plant and equipment includes the following:

side boom with roller cradles

excavator

minor mechanical maintenance includes the following:

excavator and vacuum lift

bending machine and mandrels

internal line up clamp

tack rig

side boom

roller cradles

rock saw

bucket wheel trencher

thermal coil

over ditch wrapping machine

padding machines

mitsu bucket

string and bend plant and equipment includes the following:

excavator

bending machine with mandrels

side boom

welding includes the following:

side boom

internal line up clamp

tack rig

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Job instructions are obtained and confirmed with relevant person/s 
 
 
 
 
 
 
 
WHS/OHS risk control measures and policies and procedures are followed in accordance with workplace procedures 
Instructions are provided for any remedial action associated with the operation of plant and equipment in accordance with workplace procedures 
 
 
 
 
 
Work undertaken and plant and equipment usage is checked against work schedule for conformance with job requirements and anomalies reported to authorised person/s in accordance with workplace procedures 
 
 
 
 
 

Forms

Assessment Cover Sheet

UEGNSG348 - Supervise the operation of plant and equipment for the construction of gas transmission pipelines
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

UEGNSG348 - Supervise the operation of plant and equipment for the construction of gas transmission pipelines

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: