Assessor Resource

UEGNSG512
Control centre communication with gas industry stakeholders

Assessment tool

Version 1.0
Issue Date: May 2024


This unit involves the skills and knowledge required to use technical communication skills and techniques to effectively liaise and communicate with relevant parties to ensure gas deliveries and operations are carried out within contractual, operational and regulatory requirements.

It includes planning, identifying and carrying out control centre communication with gas industry stakeholders. It also includes completing workplace procedures for communication and liaising with gas industry stakeholders.

This unit applies to safe work site where gas industry operations occur. It could also apply, where applicable, to other workplaces in the electricity supply industry (transmission and distribution and generation), the electrotechnology industry and the water industry, subject to work health and safety (WHS)/occupational health and safety (OHS) and duty of care requirements being met for the workplace.

No licensing, legislative or certification requirements apply to this unit at the time of publication.

You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)

Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assingnment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions may be found in the UEG Gas Industry Training Package Companion Volume Implementation Guide.

constants and variables must include the following:

industry products and services

authoritative sources

product information

stakeholders

organisational requirements

interpersonal skills

nominated person(s)

product and service issues

workplace environment context must include at least one (1) of the following:

gas industry production, transmission and distribution areas

location — control centres or places where communication processes occur

workplace processes must include the following:

use of computer hardware and software, such as email

work requests from other parties

relevant procedures for equipment use

perform work under or without supervision

work carried out in regular or specified timeframe

documentation must include the following:

written requests and reports

organisational formatting reports

regulatory reporting formats

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Work schedules, drawings, plans, requirements, workplace procedures and material lists are detailed and communicated to control centre, analysed, as required, and the extent of the preparation of the work determined for planning, coordination and follow-on communication purposes 
 
 
 
 
 
 
 
Relevant WHS/OHS, operational and commercial requirements and practices of individual stakeholders are referenced and actioned in accordance with control centre guidelines and workplace procedures 
 
 
 
 
 
 
 
 
Communication work undertaken is checked against works schedule for conformance with requirements, anomalies are reported and solutions identified in accordance with workplace procedures 
 
 
 
 
 
 
 

Forms

Assessment Cover Sheet

UEGNSG512 - Control centre communication with gas industry stakeholders
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

UEGNSG512 - Control centre communication with gas industry stakeholders

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: