Assessor Resource

UEGNSG515
Use control centre systems to monitor and control gas infrastructure

Assessment tool

Version 1.0
Issue Date: May 2024


This unit involves the skills and knowledge required to use control centre systems to monitor and control gas infrastructure.

It includes operating supervisory control and data acquisition (SCADA) and other control centre information systems, including outage management systems, alarm management systems, site security and communications systems, and telemetry to effectively manage gas industry infrastructure.

No licensing, legislative or certification requirements apply to this unit at the time of publication.

You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)

Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assingnment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions may be found in the Companion Volume Implementation Guide.

gas infrastructure systems must include at least three (3) of the following:

compressor stations

regulator stations

power generation stations

custody transfer stations

odourant stations

valves and actuators

heaters

meter stations

gas quality equipment

system fringe location

complex analysis modelling systems

corrosion protection systems

filtration systems

pipeline inspection gauges (PIGs)

telemetry and data communications systems

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Work schedules, plans and job requirements are obtained and analysed to determine the preparation work required for planning and coordination 
 
 
 
 
 
 
 
WHS/OHS policies and procedures and safe work practices are followed to eliminate or minimise incidents and hazards 
 
 
 
 
 
 
 
Work undertaken is checked against work schedule for conformance with job requirements and anomalies and proposed solutions identified and reported in accordance with workplace procedures 
 
 

Forms

Assessment Cover Sheet

UEGNSG515 - Use control centre systems to monitor and control gas infrastructure
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

UEGNSG515 - Use control centre systems to monitor and control gas infrastructure

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: