Assessor Resource

UEGNSG619
Perform scheduled maintenance on gas processing or storage facilities and equipment

Assessment tool

Version 1.0
Issue Date: May 2024


This unit involves the skills and knowledge required to carry out scheduled maintenance, and repair and replace parts on liquefied petroleum gas (LPG) processing or storage facilities and equipment.

It includes repairing/replacing pressure vessels, valves and fittings, transfer equipment, pumps, compressors, transfer hoses, pipework and seals.

It also includes following procedures to correctly and safely carry out the work using appropriate materials, tools and equipment.

This unit applies to work sites where LPG is processed and stored, and subject to all work health and safety (WHS)/occupational health and safety (OHS) and duty of care requirements being met for the workplace.

No licensing, legislative or certification requirements apply to this unit at the time of publication.

You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)

Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assingnment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions may be found in the UEG Gas Industry Training Package Companion Volume Implementation Guide.

equipment must include at least seven (7) of the following:

pressure vessel

vapourisers

earth connections

relief valves

system(s) isolation

emergency shutdown valving, including – idle speed control (ISC) valves

manual shutdown valving

pipe work

vessel footings

regulators

hoses and couplings

pumps

compressors

identifying irregularities must include at least three (3) of the following:

incorrect flow rates

corrosion

impact damage

point deterioration

leakage

non-operability of shutdown systems

equipment out of calibration

scheduled maintenance, repairs and replacement of parts must include at least six (6) of the following:

excess flow valves

relief valves

pressure regulators/springs

pump seals/compressor seals

pressure gauges

bypass valves

meters

solenoids

valves

break away couplings

meter heads

transfer hoses

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Appropriate facilities, tools, testing and measuring instruments, drawings, plans, materials and components for the work are selected in accordance with the work schedule/s and workplace procedures 
 
 
 
 
 
 
 
 
 
 
 
 
WHS/OHS policies and procedures and safe work practices are followed to eliminate or minimise incidents and hazards 
 
 
 
 
 
 
 
Maintenance results are documented and work undertaken is checked against work schedule/s for conformance and anomalies reported in accordance with workplace procedures 
 
 
 
 
 

Forms

Assessment Cover Sheet

UEGNSG619 - Perform scheduled maintenance on gas processing or storage facilities and equipment
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

UEGNSG619 - Perform scheduled maintenance on gas processing or storage facilities and equipment

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: