Assessor Resource

UEGNSG705
Disconnect and reconnect small capacity gas meters

Assessment tool

Version 1.0
Issue Date: May 2024


This unit involves the skills and knowledge required to disconnect, replace and reconnect small capacity (union connected) gas meters and associated components by a designated gas industry person, complete work and relevant workplace records and documentation.

It includes using tools and equipment to test the customer gas piping system and associated meter connection filters, regulators and components for tightness.

This unit applies to any safe work site where small capacity gas meters are installed, and subject to all work health and safety (WHS)/occupational health and safety (OHS) and duty of care requirements being met for the workplace.

No licensing, legislative or certification requirements apply to this unit at the time of publication.

You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)

Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assingnment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions may be found in the UEG Gas Industry Training Package Companion Volume Implementation Guide.

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Instructions for the work are obtained and confirmed with relevant person/s in accordance with workplace procedures 
 
 
 
 
 
 
 
 
 
WHS/OHS risk control measures, schedule of work and workplace procedures for carrying out work are followed 
 
 
 
 
 
 
 
 
 
WHS/OHS risk control measures for work completion measures and procedures are followed 
 
 
 
 
 

Forms

Assessment Cover Sheet

UEGNSG705 - Disconnect and reconnect small capacity gas meters
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

UEGNSG705 - Disconnect and reconnect small capacity gas meters

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: