Assessor Resource
UEPOPL001A
Licence to operate a steam turbine
Assessment tool
Version 1.0
Issue Date: April 2024
2)
This unit requires the operator to plan the work, carry out pre-operational safety checks, start the steam turbine, monitor steam turbine operation, and shut-down the steam turbine.
This unit meets the requirements of the state and territory Work Health and Safety (WHS) Regulations, including licensing. Any alteration will result in a unit which is not acceptable to regulators for the purpose of licensing.
1)Scope:
1.1) Descriptor
This unit specifies the outcomes required to operate a steam turbine for licensing purposes, and covers the operation of any steam turbine (except a steam turbine that produces a power output of less than 500 kW) that:
is multi-wheeled
is capable of a speed greater than 3600 rpm, or
uses attached condensers or a multi-staged heat exchange extraction process.
You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)