1)Scope:

1.1) Descriptor

This competency standard unit deals with the skills and knowledge required to operate and monitor water quality monitoring systems in a power station. These systems include all analytical devices used to monitor process chemical conditions.

You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)

Prerequisites

Prerequisite Unit(s)

4)

Competencies

4.1)

Granting of competency in this unit shall be made only after competency in the following unit(s) has/have been confirmed.

Where pre-requisite pathways have been identified. All competencies in the Common Unit Group must be have been completed.

There are no pre-requisite units

Literacy and numeracy skills

4.2)

Participants are best equipped to achieve this unit if they have reading, writing and numeracy skills indicated by the following levels. A description of what each level entails is provided in Section 2.3.1 Language, Literacy and Numeracy.

Reading

3

Writing

3

Numeracy

3


Employability Skills

5)

The required outcomes described in this unit of competency contain applicable facets of Employability Skills. The Employability Skills Summary of the qualification in which this unit of competency is packaged will assist in identifying Employability Skill requirements.




Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

9) Evidence Guide: This provides essential advice for assessment of the unit of competency and must be read in conjunction with the performance criteria and the range statement of the unit of competency and the Training Package Assessment Guidelines.

The Evidence Guide forms an integral part of this Competency Standard Unit and shall be used in conjunction with all components parts of this unit and, performed in accordance with the Assessment Guidelines of this Training Package.

Overview of Assessment

9.1)

Longitude competency development approaches to assessment, such as Profiling, require data to be reliably gathered in a form that can be consistently interpreted over time. This approach is best utilised in Apprenticeship programs and reduces assessment intervention. It is the Industry’s preferred model for apprenticeships. However, where summative (or final) assessment is used it is to include the application of the competency in the normal work environment or, at a minimum, the application of the competency in a realistically simulated work environment. It is recognised that, in some circumstances, assessment in part or full can occur outside the workplace. However, it must be in accord with Industry and, Regulatory policy in this regard.

Methods chosen for a particular assessment will be influenced by various factors. These include the extent of the assessment, the most effective locations for the assessment activities to take place, access to physical resources, additional safety measures that may be required and the critical nature of the competencies being assessed.

The critical safety nature of working with electricity, electrical equipment, gas or any other hazardous substance/material carries risk in deeming a person competent. Hence, sources of evidence need to be ‘rich’ in nature so as to minimise error in judgment.

Activities associated with normal every day work have a bearing on the decision as to how much and how detailed the data gathered will contribute to its ‘richness’. Some skills are more critical to safety and operational requirements while the same skills may be more or less frequently practiced. These points are raised for the assessors to consider when choosing an assessment method and developing assessment instruments. Sample assessment instruments are included for Assessors in the Assessment Guidelines of this Training Package.

Critical aspects of evidence required to demonstrate competency in this unit

9.2)

Before the critical aspects of evidence are considered all pre-requisites shall be met.

Evidence for competence in this unit shall be considered holistically. Each element and associated performance criteria shall be demonstrated on at least two occasions in accordance with the “Assessment Guidelines – UEP05”. Evidence shall also comprise:

A representative body of work performance demonstrated within the timeframes typically expected of the discipline, work function and industrial environment. In particular this shall incorporate evidence that shows a candidate is able to:

Implement Occupational Health and Safety workplace procedures and practices including the use of risk control measures as specified in the performance criteria and range and

Apply sustainable energy principles and practices as specified in the performance criteria and range and

Demonstrate an understanding of the essential knowledge and associated skills as described in Essential Knowledge and Associated Skills of this unit and

Demonstrate an appropriate level of employability skills and

Conduct work observing the relevant Anti Discrimination legislation, regulations, polices and workplace procedures and

Demonstrated performance across a representative range of contexts from the prescribed items below:

Knowledge and application of relevant sections of: Occupational Health and Safety legislation; Statutory legislation; Enterprise/site safety procedures; Enterprise/site emergency procedures

Preparation and planning of work

Operation of water quality control systems

Operationally testing plant

Analysing plant faults

Monitoring plant operation

Knowledge of process chemicals, their use and precautions taken

Knowledge of water quality chemistry

Dealing with an unplanned event by drawing on essential knowledge and skills to provide appropriate solutions incorporated in the holistic assessment with the above listed items

Context of and specific resources for assessment

9.3)

This unit should be assessed as it relates to normal work practice using procedures, information and resources typical of a workplace. This should include:

OHS policy and work procedures and instructions.

Suitable work environment, facilities, equipment and materials to undertake actual work as prescribed by this competency standard unit.

Competency Standards should be assessed in the workplace or simulated workplace and under the normal range of workplace conditions.

Assessment of this unit will be supported with documentary evidence, by means of endorsement stating type and application of work.

In addition to the resources listed above in Context of assessment’, evidence should show competency working, in limited spaces, with different types of plant and equipment as well as different structural/construction types and method and in a variety of environments.

Method of assessment

9.4)

This competency standard unit shall be assessed by methods given in Section 1.3.00 Assessment Guidelines.

Note:

Competent performance with inherent safe working practices is expected in the Industry to which this competency standard unit applies. This requires that the specified essential knowledge and associated skills are assessed in a structured environment which is primarily intended for learning/assessment and incorporates all necessary equipment and facilities for learners to develop and demonstrate the essential knowledge and skills described in this unit.

Concurrent assessment and relationship with other units

9.5)

There are no recommended concurrent assessments with this unit, however in some cases efficiencies may be gained in terms of learning and assessment effort being concurrently managed with allied competency standard units where listed.

Nil


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assingnment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

8) Essential Knowledge and Associated Skills (EKAS): This describes the essential skills and knowledge and their level, required for this unit.

Evidence shall show that knowledge has been acquired of operating and monitoring water quality control systems for a permit to work.

All knowledge and skills detailed in this unit should be contextualised to current industry practices and technologies.

The extent of the Essential Knowledge and Associated Skills required follows:

KS01-PO325B Water quality monitoring systems

Evidence shall show that knowledge has been acquired for safe working practices of:

T1 Relevant Environmental, Occupational Health and Safety legislation and regulations

T2 Enterprise procedures

T3 Plant drawings and manufacturers manuals

T4 Introduction to and typical arrangements of power production plant

T5 Relevant plant and equipment, its location and operating parameters

T6 Plant status

T7 Control and data acquisition systems

T8 Electric motor types and characteristics

T9 Pump and compressor types and characteristics

T10 Valve and actuator types and characteristics

T11 Switchgear types and characteristics

T12 Relevant chemicals, uses and hazards

T13 Fundamentals of water treatment

T14 Water treatment plants, types and characteristics

T15 Water analysing equipment types and characteristics

T16 Water dosing systems

T17 Water chemical additives and effects

T18 Water systems types and characteristics

T19 Relevant water quality standards

T20 Process chemicals and their properties

T21 Material safe handling data sheets

T22 General responsibilities for power production plant operations

T23 Electrical principles

KS02-PO325B Water quality monitoring systems

Specific skills needed to achieve the performance criteria:

T1 Interpret plant drawings and manufacturers manuals

T2 Apply enterprise recording procedures

T3 Identify plant status

T4 Prepare plant/equipment for operation

T5 Organise resources

T6 Operate water quality monitoring systems

T7 Apply diagnostic and testing techniques

T8 Identify and respond to abnormal plant operating conditions

T9 Apply enterprise recording procedures

T10 Identify plant status

T11 Prepare plant/equipment for operation

T12 Organise resources

T13 Operate water quality monitoring systems

T14 Apply diagnostic and testing techniques

T15 Identify and respond to abnormal plant operating conditions

T16 Plan and prioritise work

T17 Use relevant hand tools

T18 Communicate effectively

T19 Apply data analysis techniques and tools

10) Range: This relates to the unit of competency as a whole providing the range of contexts and conditions to which the performance criteria apply. It allows for different work environments and situations that will affect performance.

Chemical conditions monitored and operated may include pH, conductivity, acid conductivity, silica, dissolved O2, ammonia, totally dissolved solids, phosphate, oxidisation reduction potential, sodium ion and chlorine residual.

Systems, plant and/or equipment may include raw water, feed water, condenser cooling water, auxiliary cooling water, demineralised water, water treatment plant, water quality room, ammonia and hydrazine systems, hypochlorite plant, effluent disposal system, reverse osmosis plant pumps, high/low pressure, characteristics, operating conditions valves, actuators (electric, pneumatic) electrical supply switchboards electrical motors (high and low voltage) supervisory, alarm and control equipment filters, strainers, dryers, moisture, pressure control devices, safety devices and high and low pressure systems.

Safety standards may include relevant sections of Occupational Health and Safety legislation, enterprise safety rules, relevant state and federal legislation and national standards for plant.

Information and documentation sources may include verbal or written communications enterprise safety rules documentation/form(s) equipment and alarm manuals dedicated computer equipment enterprise/site standing and operating instructions enterprise log books and manufacturer’s operation and maintenance manuals.

Technical and operational indicators may include stimuli (audio, smell, touch, visual), local indicators and recorders and alarms (visible and/or audible).

Communications may be by means of telephone, two way radio, pager, public address system, computer (electronic mail) and operating log (written or verbal).

Tests may include stand-by plant tests and post maintenance operating tests.

Appropriate personnel to consult, give or receive direction may include, supervisor/team leader or equivalent, technical and engineering officers or equivalent, maintenance staff, power plant operations personnel and contractor and specialist staff.

Test, fault finding and operating tools may include chemical analysis equipment, power or hand tools, control system equipment and leak test equipment.

Operating environment may be remote from plant, aided by indicators and monitors, during inclement or otherwise harsh weather conditions, in wet/noisy/dusty areas or during night periods.

Faults and abnormal operating conditions may include motor/pump/ actuator/valve/damper failure/malfunctions, control equipment failure/ malfunctions, loss of electrical supply to plant and equipment, loss supply, low water pressure, burst pipes, plant/equipment, loss of major auxiliary (dosing plant) and loss of station air supply.

Generic terms are used throughout this Training Package for vocational standard shall be regarded as part of the Range Statement in which competency is demonstrated. The definition of these and other terms are given in Section 2.1 Preliminary Information and Glossaries.

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Safety issues are identified to comply with enterprise/site requirements 
Work requirements are identified from relevant personnel and documentation 
Documentation to determine plant status is assessed and evaluated 
Localised device inspection is carried out in accordance with manufacturer’s and enterprise procedures 
Device operational pre-requisites are established in accordance with manufacturer’s and enterprise procedures 
Sequence for recommissioning of device is determined to suit existing circumstances in accordance with enterprise/site requirements 
Where appropriate, the teams and individuals roles and responsibilities within the team are identified and, where required, assist in the provision of the on-the-job training 
Devices are operated in accordance with enterprise and manufacturer’s operating procedures 
Devices are monitored and observed to detect deviations from normal operating conditions 
Corrective actions taken to rectify abnormalities in accordance with manufacturer’s and enterprise procedures 
Tests are performed in accordance with defined procedures applicable to the operational test 
Devices are observed for correct operational response 
Devices are returned to required operational status upon completion of test 
Cause of abnormal plant conditions are identified by analysing the technical and operational information in a logical and sequential manner 
Corrective action is taken when response is not in accordance with documentation, plant integrity or personnel safety requirements 
Plant integrity and personnel safety is maintained through consultation with appropriate personnel, and reference to plant, technical and operational documentation 
Plant to be monitored/inspected is physically identified 
Plant is monitored/inspected for normal operation or to detect deviations 
Corrective action taken is in accordance with enterprise/site procedures 
Appropriate personnel are notified when defects are detected 
Documentation is updated and plant problems, movements, abnormalities and status are reported and logged in accordance with enterprise/site procedures 

Forms

Assessment Cover Sheet

UEPOPS325B - Operate and monitor water quality monitoring systems
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

UEPOPS325B - Operate and monitor water quality monitoring systems

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent