Assessor Resource

UEPOPS422B
Schedule generation

Assessment tool

Version 1.0
Issue Date: April 2024


2)

This unit is intended to augment formally acquired competencies. It is suitable for employment-based programs under an approved contract of training.

1)Scope:

1.1) Descriptor

This unit deals with the skills and knowledge required to undertake the scheduling of a generation plant to economically meet forecast demand.

You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)

Prerequisites

Prerequisite Unit(s)

4)

Competencies

4.1)

Granting of competency in this unit shall be made only after competency in the following unit(s) has/have been confirmed.

Where pre-requisite pathways have been identified. All competencies in the Common Unit Group must be have been completed.

There are no pre-requisite units.

Literacy and numeracy skills

4.2)

Participants are best equipped to achieve this unit if they have reading, writing and numeracy skills indicated by the following levels. A description of what each level entails is provided in Section 2.3.1 Language, Literacy and Numeracy.

Reading

4

Writing

4

Numeracy

4


Employability Skills

5)

The required outcomes described in this unit of competency contain applicable facets of Employability Skills. The Employability Skills Summary of the qualification in which this unit of competency is packaged will assist in identifying Employability Skill requirements.




Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

9) This provides essential advice for assessment of the competency standard unit and must be read in conjunction with the Performance Criteria and the Range Statement of the unit and the Training Package Assessment Guidelines.

The Evidence Guide forms an integral part of this competency standard unit and shall be used in conjunction with all components parts of this unit and, performed in accordance with the Assessment Guidelines of this Training Package.

Overview of Assessment

9.1)

Longitude competency development approaches to assessment, such as Profiling, require data to be reliably gathered in a form that can be consistently interpreted over time. This approach is best utilised in Apprenticeship programs and reduces assessment intervention. It is the Industry preferred model for apprenticeships. However, where summative (or final) assessment is used it is to include the application of the competency in the normal work environment or, at a minimum, the application of the competency in a realistically simulated work environment. It is recognised that, in some circumstances, assessment in part or full can occur outside the workplace. However, it must be in accord with Industry and regulatory policy.

Methods chosen for a particular assessment will be influenced by various factors. These include the extent of the assessment, the most effective locations for the assessment activities to take place, access to physical resources, additional safety measures that may be required and the critical nature of the competencies being assessed.

The critical safety nature of working with electricity, electrical equipment, gas or any other hazardous substance/material carries risk in deeming a person competent. Hence, sources of evidence need to be ‘rich’ in nature so as to minimise error in judgment.

Activities associated with normal every day work have a bearing on the decision as to how much and how detailed the data gathered will contribute to its ‘richness’. Some skills are more critical to safety and operational requirements while the same skills may be more or less frequently practised. These points are raised for the assessors to consider when choosing an assessment method and developing assessment instruments. Sample assessment instruments are included in the Assessment Guidelines of this Training Package.

Critical aspects of evidence required to demonstrate competency in this unit

9.2)

Before the critical aspects of evidence are considered all pre-requisites shall be met.

Evidence for competence in this unit shall be considered holistically. Each element and associated Performance Criteria shall be demonstrated on at least two occasions in accordance with the “Assessment Guidelines – UEP12”. Evidence shall also comprise:

A representative body of work performance demonstrated within the timeframes typically expected of the discipline, work function and industrial environment. In particular this shall incorporate evidence that shows a candidate is able to:

Implement Occupational Health and Safety workplace procedures and practices including the use of risk control measures as specified in the Performance Criteria and Range Statement

Apply sustainable energy principles and practices as specified in the Performance Criteria and Range Statement

Demonstrate an understanding of the essential knowledge and associated skills as described in 6) Essential Knowledge and Associated Skills of this unit

Demonstrate an appropriate level of employability skills

Conduct work observing the relevant Anti-Discrimination legislation, regulations, polices and workplace procedure

Demonstrated performance across a representative range of contexts from the prescribed items below:

The knowledge and application of relevant sections of: Occupational Health and Safety legislation; Statutory legislation; Enterprise/site safety procedures; Enterprise/site emergency procedures

Forecasting load profiles

Identifying unit status

Preparing generation schedules

Implementing generation schedules

Operating and loading characteristics of generation plant

Dealing with an unplanned event by drawing on essential knowledge and skills to provide appropriate solutions incorporated in the holistic assessment with the above listed items.

Context of and specific resources for assessment

9.3)

This unit should be assessed as it relates to normal work practice using procedures, information and resources typical of a workplace. This should include:

OHS policy and work procedures and instructions

Suitable work environment, facilities, equipment and materials to undertake actual work as prescribed by this unit.

Competency Standards should be assessed in the workplace or simulated workplace and under the normal range of workplace conditions.

Assessment of this unit will be supported with documentary evidence, by means of endorsement stating type and application of work.

In addition to the resources listed above in Context of assessment’, evidence should show competency working in limited spaces with different types of plant and equipment as well as different structural/construction types and methods and in a variety of environments.

Method of assessment

9.4)

This unit shall be assessed by methods given in Section 1.3.00 Assessment Guidelines.Note:

Competent performance with inherent safe working practices is expected in the Industry to which this unit applies. This requires that the specified essential knowledge and associated skills are assessed in a structured environment which is primarily intended for learning/assessment and incorporates all necessary equipment and facilities for learners to develop and demonstrate the essential knowledge and skills described in this unit.

Concurrent assessment and relationship with other units

9.5)

There are no recommended concurrent assessments with this unit, however in some cases efficiencies may be gained in terms of learning and assessment effort being concurrently managed with allied competency standard units where listed.

Nil


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assingnment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

8) This describes the essential skills and knowledge and their level, required for this unit.

Evidence shall show that knowledge has been acquired scheduling generation.

All knowledge and skills detailed in this unit should be contextualised to current industry practices and technologies.

The extent of the Essential Knowledge and Associated Skills required follows:

KS01-PO422B Schedule generation

T1 Evidence shall show that knowledge has been acquired for safe working practices of:

Relevant environmental, occupational health and safety legislation and regulations

Enterprise procedures

Plant drawings and manufacturers manuals

Introduction to and typical arrangements of power production plant

Relevant plant and equipment, its location and operating parameters

Relevant state and territory regulations

Plant design parameters

Plant status

Planning techniques

Risk management techniques

Power plant operating parameters

Enterprise recording procedures

Systems operating instructions

Relationships that weather, social and industrial variables have on system demand

Economic operating criteria including fuel strategies

Computers and software

T2 Specific skills needed to achieve the Performance Criteria:

Interpret plant drawings and manufacturers manuals

Apply relevant state and territory regulations

Apply relevant statutory legislation

Apply relevant enterprise/site safety procedures

Apply enterprise/site emergency procedures and techniques

Apply enterprise recording procedures

Schedule plant within design parameters to meet demand

Identify plant status

Communicate effectively

Apply data analysis techniques and tools

Plan and prioritise work

Scheduling the generating units to maintain optimum system efficiency

Operate screen based equipment.

10) This relates to the competency standard unit as a whole, providing the range of contexts and conditions to which the Performance Criteria apply. It allows for different work environments and situations that will affect performance.

Stations/generation plant may include main power station, remotely controlled power station, independent power producers, single and multiple generating sets and interconnected/isolated power systems.

Safety standards may include relevant sections of Occupational Health and Safety legislation, relevant State and federal legislation, national standards for plant and enterprise safety rules.

Information and documentation sources may include verbal or written communications; enterprise safety rules documentation; enterprise operating instructions; dedicated computer equipment; enterprise/site standing and operating instructions; enterprise log books; manufacturer’s operation and maintenance manuals; and equipment and alarm manuals.

Technical and operational indicators may include local indicators and recorders and computers.

Communications may be by means of telephone, two way radio, pager, computers (electronic mail) and operating logs (written or verbal).

Appropriate personnel for consultation, give or receive direction may include supervisor/team leader or equivalent, power plant operations personnel or equivalent, technical and engineering officers or equivalent, maintenance staff, other operating staff or equivalent, system controller/network controller, field operator, independent generators and fuel suppliers.

Strategies and resources may include fuel, quality of supply, contract and commitments.

Generic terms are used throughout this Training Package for vocational standard shall be regarded as part of the Range Statement in which competency is demonstrated. The definition of these and other terms are given in Section 2.1 Preliminary Information and Glossaries.

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Comprehensive information on all variables which have the potential to affect demand is obtained and employed to enable a realistic forecast 
Information integrity is confirmed and recorded, and deficiencies are detected and rectified 
Forecast prediction is based on the interpretation of relevant information 
Forecast outcomes are produced in a time frame that enables system security and economic operation criteria to be maintained 
Forecast prediction is continuously assessed against real time trends and adjustments made where applicable 
Where appropriate, the teams and individuals roles and responsibilities within the team are identified and, where required, assist in the provision of the on-the-job training 
Unit status information is sought with sufficient regularity to maintain the integrity of scheduling plans 
Information integrity is confirmed and deficiencies are detected and rectified 
Information is processed and recorded in a time frame that enables effective scheduling 
Comprehensive information on all factors which have the potential to affect the unit status is obtained 
Effective relationships are cultivated and maintained with remote/independent power generators 
Base load generation is scheduled in accordance with contractual obligations and enterprise procedures 
Peak load generation is scheduled to meet system demand and maintain adequate spinning reserve capability 
Units are operated in economic merit within the framework of the enterprise fuel strategies 
Megawatts and megavar spinning reserve criteria are met at all times in accordance with local instructions 
System security criteria are met at all times in accordance with enterprise procedures 
Quality of supply standards are met at all times in accordance with statutory requirements 
Plant maintenance commitments are incorporated in setting priorities for committing units 
Schedule is produced with sufficient lead time to allow effective plant movements to occur 
Power station plant problems are accurately assessed in terms of impact on unit commitment and scheduling requirements 
Plant testing commitments are incorporated in setting priorities for committing units 
Circumstances resulting in unexpected changes to demand are identified and managed in accordance with system requirements 
Transmission system losses are identified and minimised in accordance with system procedures 
Transmission and generation system status changes are identified and accommodate in accordance with system procedures 
Fuel supply status changes are identified and accommodated in accordance with system procedures 
Generation outputs are monitored in accordance with system procedures 
Power station plant problems are assessed in terms of impact on unit commitment and scheduling requirements in accordance with system procedures 
System fault levels and transmission plant load levels are identified and not exceeded in accordance with system procedures 
Scheduling of units is timed to optimise system efficiency in accordance with system procedures 
Scheduling information is recorded and communicated to all stakeholders in accordance with system procedures 

Forms

Assessment Cover Sheet

UEPOPS422B - Schedule generation
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

UEPOPS422B - Schedule generation

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: