UEPOPS515B
Coordinate power generation

Assessment tool

Version 1.0
Issue Date: March 2024


2)

This unit is intended to augment formally acquired competencies. It is suitable for employment-based programs under an approved contract of training.

1)Scope:

1.1) Descriptor

This unit deals with the skills and knowledge required to coordinate operation and control of multiple generators sharing load under the control of one operator.

You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)

Prerequisites

Prerequisite Unit(s)

4)

Competencies

4.1)

Granting of competency in this unit shall be made only after competency in the following unit(s) has/have been confirmed.

Where pre-requisite pathways have been identified. All competencies in the Common Unit Group must be have been completed.

There are no pre-requisite units.

Literacy and numeracy skills

4.2)

Participants are best equipped to achieve this unit if they have reading, writing and numeracy skills indicated by the following levels. A description of what each level entails is provided in Section 2.3.1 Language, Literacy and Numeracy.

Reading

5

Writing

5

Numeracy

5


Employability Skills

5)

The required outcomes described in this unit of competency contain applicable facets of Employability Skills. The Employability Skills Summary of the qualification in which this unit of competency is packaged will assist in identifying Employability Skill requirements




Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

9) This provides essential advice for assessment of the competency standard unit and must be read in conjunction with the Performance Criteria and the range statement of the competency standard unit and the Training Package Assessment Guidelines.

The Evidence Guide forms an integral part of this Competency Standard Unit and shall be used in conjunction with all components parts of this unit and, performed in accordance with the Assessment Guidelines of this Training Package.

Overview of Assessment

9.1)

Longitude competency development approaches to assessment, such as Profiling, require data to be reliably gathered in a form that can be consistently interpreted over time. This approach is best utilised in Apprenticeship programs and reduces assessment intervention. It is the Industry’s preferred model for apprenticeships. However, where summative (or final) assessment is used it is to include the application of the competency in the normal work environment or, at a minimum, the application of the competency in a realistically simulated work environment. It is recognised that, in some circumstances, assessment in part or full can occur outside the workplace. However, it must be in accord with Industry and regulatory policy.

Methods chosen for a particular assessment will be influenced by various factors. These include the extent of the assessment, the most effective locations for the assessment activities to take place, access to physical resources, additional safety measures that may be required and the critical nature of the competencies being assessed.

The critical safety nature of working with electricity, electrical equipment, gas or any other hazardous substance/material carries risk in deeming a person competent. Hence, sources of evidence need to be ‘rich’ in nature so as to minimise error in judgment.

Activities associated with normal every day work have a bearing on the decision as to how much and how detailed the data gathered will contribute to its ‘richness’. Some skills are more critical to safety and operational requirements while the same skills may be more or less frequently practised. These points are raised for the assessors to consider when choosing an assessment method and developing assessment instruments. Sample assessment instruments are included in the Assessment Guidelines of this Training Package.

Critical aspects of evidence required to demonstrate competency in this unit

9.2)

Before the critical aspects of evidence are considered all pre-requisites shall be met.

Evidence for competence in this unit shall be considered holistically. Each element and associated Performance Criteria shall be demonstrated on at least two occasions in accordance with the “Assessment Guidelines – UEP12”. Evidence shall also comprise:

A representative body of work performance demonstrated within the timeframes typically expected of the discipline, work function and industrial environment. In particular this shall incorporate evidence that shows a candidate is able to:

Implement Occupational Health and Safety workplace procedures and practices including the use of risk control measures as specified in the Performance Criteria and Range Statement

Apply sustainable energy principles and practices as specified in the Performance Criteria and Range Statement

Demonstrate an understanding of the essential knowledge and associated skills as described in 6) of this unit

Demonstrate an appropriate level of employability skills

Conduct work observing the relevant Anti Discrimination legislation, regulations, polices and workplace procedures

Demonstrated performance across a representative range of contexts from the prescribed items below:

Knowledge and application of relevant sections of: Occupational Health and Safety legislation; Statutory legislation; Enterprise/site safety procedures; Enterprise/site emergency procedures

Planning and preparing for one operator isolated plant operations

Operating generator and excitation systems

Controlling and coordinate generation of electrical energy

Analysing system faults

Dealing with an unplanned event by drawing on Essential Knowledge and Skills to provide appropriate solutions incorporated in the holistic assessment with the above listed items.

Context of and specific resources for assessment

9.3)

This unit should be assessed as it relates to normal work practice using procedures, information and resources typical of a workplace. This should include:

OHS policy and work procedures and instructions.

Suitable work environment, facilities, equipment and materials to undertake actual work as prescribed by this competency standard unit.

Competency Standards should be assessed in the workplace or simulated workplace and under the normal range of workplace conditions.

Assessment of this unit will be supported with documentary evidence, by means of endorsement stating type and application of work.

In addition to the resources listed above in Context of assessment’, evidence should show competency working, in limited spaces, with different types of plant and equipment as well as different structural/construction types and methods and in a variety of environments.

Method of assessment

9.4)

This unit shall be assessed by methods given in Section 1.3.00 Assessment Guidelines.

Note:

Competent performance with inherent safe working practices is expected in the Industry to which this unit applies. This requires that the specified essential knowledge and associated skills are assessed in a structured environment which is primarily intended for learning/assessment and incorporates all necessary equipment and facilities for learners to develop and demonstrate the Essential Knowledge and Skills described in this unit.

Concurrent assessment and relationship with other units

9.5)

There are no recommended concurrent assessments with this unit, however in some cases efficiencies may be gained in terms of learning and assessment effort being concurrently managed with allied competency standard units where listed

Nil


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assingnment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

8) This describes the essential skills and knowledge and their level, required for this unit.

Evidence shall show that knowledge has been acquired co-ordinating power generation.

All knowledge and skills detailed in this unit should be contextualised to current industry practices and technologies.

The extent of the Essential Knowledge and Associated Skills required follows:

KS01-PO515B Power generation

T1 Evidence shall show that knowledge has been acquired for safe working practices of:

Relevant environmental, occupational health and safety legislation and regulations

Enterprise procedures

Plant drawings and manufacturers manuals

Introduction to and typical arrangements of power production plant

Relevant plant and equipment, its location and operating parameters

Relevant state and territory regulations

Electric motor types and characteristics

Switchgear types and characteristics

Electrical protection types and characteristics

Electrical principles

Process control principles

Plant process control systems

a.c. generators types and characteristics

Transformers types and characteristics

Generator excitation and cooling systems, types and characteristics types and characteristics

Plant status

Enterprise recording procedures

Systems components and interactions

T2 Specific skills needed to achieve the performance criteria:

Interpret plant drawings and manufacturers manuals

Apply relevant state and territory regulations

Apply enterprise recording procedures

Identify plant status;

Prepare plant/equipment for operation

Communicate effectively

Coordinate the operation of plant and equipment

Maintain generator unit integrity

Apply principles of electrical generation

Apply data analysis techniques and tools

Recognise abnormal plant operating conditions

Apply or determine appropriate corrective actions required

Plan and prioritise work

Coordinate the operation of equipment to maintain plant integrity, personnel safety and continuity of supply

Coordinate the operation of equipment to maintain optimum efficiency

Interpret remote indication of plant status and condition

10) This relates to the competency standard unit as a whole providing the range of contexts and conditions to which the Performance Criteria apply. It allows for different work environments and situations that will affect performance.

Key indicators may include frequency time error, bus voltage, machine/ equipment voltage and current limits, plant temperatures, reactive power flows, power factor, generation plant load capabilities, protection settings, visual and audible indicators, analogue and digital displays and load shedding requirements.

Systems, plant and equipment may include generator cooling systems; fuel delivery system; generator and generator auxiliary plant; generator excitation system; generation fire protection system; unit coordinated control system; generator circuit breaker/transformer; unit auxiliary switchboards; electricity market auto loading procedures prime mover governing system.

Safety standards may include relevant sections of Occupational Health and Safety legislation, enterprise safety rules, and national standards for plant, relevant state and federal legislation and Australian standards.

Information and documentation sources may include verbal or written communications; enterprise safety rules documentation; enterprise operating instructions; equipment and alarm manuals; dedicated computer equipment; enterprise standing instructions and plant notes; enterprise log books; market load profile forecasts; electricity market bidding information; and manufacturer’s operation and maintenance manuals.

Technical and operational indicators may include stimuli (audio, smell, touch, visual), remote or local indicators and recorders, computers and alarms (visible and or audible).

Communications may be by means of telephone, facsimile, two way radio, pager, computer (electronic mail) and operating logs (written or verbal).

Appropriate personnel for consultation, to give or receive direction may include supervisor/team leader or equivalent; other coordinators of energy production; other operating staff; technical and engineering officers or equivalent; maintenance personnel; and contractor staff.

Operating within an isolated system the environment may be remote from plant and equipment being operated; (operation is assisted by remote indicators of plant status and other parameters monitored); during night periods; during inclement or otherwise harsh weather conditions; and in wet/noisy/dusty areas.

Unit operations (systems requirements) may include spurious faults in automatic systems operating out of range, failure of automatic system components and routine plant movement.

Generic terms are used throughout this Training Package for vocational standard shall be regarded as part of the Range Statement in which competency is demonstrated. The definition of these and other terms are given in Section 2.1 Preliminary Information and Glossaries.

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Safety issues are identified to comply with enterprise/site requirements 
Work, plant and resource requirements are identified from relevant information and documentation 
Pre operational checks are carried out in accordance with enterprise and site requirements 
Where appropriate, the teams and individuals roles and responsibilities within the team are identified and, where required, assist in the provision of the on-the-job training 
System is operated in accordance with enterprise/site and manufacturer’s operating procedures 
Synchronising requirements are assessed, evaluated and achieved to ensure machine/system stability during synchronising 
System is monitored and observed to detect deviations from normal operating conditions 
Corrective actions are taken to rectify abnormalities in accordance with manufacturer’s and enterprise/site procedures 
Generator output is adjusted to meet demand whilst observing operating requirements 
Reactive power generation and voltage regulation requirements are assessed and the system is controlled to achieve the desired output 
Generator stabilities and operating limits are assessed and the system is controlled to maintain those limits tin accordance with enterprise/site and manufacturer’s procedures 
Generator cooling systems and limits are monitored and assessed and excitation system is controlled to maintain those limits in accordance with enterprise/site and manufacturer’s procedures 
Load sharing between multiple generators is controlled to maintain optimum efficiency and plant reliability 
Output of generators is adjusted to meet demand whilst observing operating requirements 
System/plant key indicators are monitored and adjusted to maintain within limits and detect deviations from normal operating conditions 
Corrective actions taken to rectify system abnormalities are in accordance with manufacturer’s, enterprise/site requirements 
System integrity, personal safety and continuity of supply are maintained throughout. 
Consultation with appropriate personnel is undertaken as required in accordance with enterprise/ site requirements. 
Systems are operated at optimum efficiency 
System/plant to be monitored is physically identified 
System/plant is monitored for normal operation or to detect deviations 
Corrective action taken is in accordance with enterprise/site procedures 
Appropriate personnel are notified when defects and abnormal operating conditions are detected 
Causes of abnormal system operating conditions are identified by analysing the technical and operational information in a logical and sequential manner 
Actions necessary to rectify fault are correctly determined 
System/plant integrity and personnel safety are maintained through consultation with appropriate personnel, and reference to plant, technical and operational documentation 
Appropriate personnel are arranged for local investigation of identified operational abnormalities 
Documentation is updated and plant problems, movements, abnormalities and status are reported and logged in accordance with enterprise/site procedures 

Forms

Assessment Cover Sheet

UEPOPS515B - Coordinate power generation
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

UEPOPS515B - Coordinate power generation

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: