This competency standard is suitable for employment-based programs under an approved contract of training at the AQF level of the qualification in which the unit is first packaged or higher.

The unit may be selected as an elective from the relevant schedule (see qualification packaging rules) provided that all prerequisite units are undertaken or addressed through recognition processes.

This unit may be included in a skill set provided that it is listed in the schedule of electives (see Qualification Framework) and all prerequisite units are undertaken or addressed through recognition processes.

Delivery and assessment of this unit should be undertaken within regard to the requirements of License to Practice (1.2 above), Prerequisite Competencies and Literacy and Numeracy skills (2 above) and the recommendations for concurrent assessment and relationship with other units (9.5 below).

Practice in the workplace and during training is also subject to regulations directly related to occupational health and safety and where applicable contracts of training such as apprenticeships.

Note:

1. Compliance with permits may be required in various jurisdictions and typically relates to the operation of plant, machinery and equipment such as elevating work platforms, powder operated fixing tools, power operated tools, vehicles, road signage and traffic control and lifting equipment. Permits may also be required for some work environments such as confined spaces, working aloft, near live electrical apparatus and site rehabilitation.

2. Compliance may be required in various jurisdictions relating to currency in First Aid, confined space, lifting, risk safety measures etc.

1)Scope:

1.1) Descriptor

This Competency Standard Unit covers the installation and replacement of high voltage metering and associated equipment. Replacement may include the identification of faults in accordance with established procedures and return to service. It includes the requirements to ascertain if normal functions of the meters and associated equipment are in accordance with operating standards.

You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)

Prerequisites

Prerequisite Unit(s)

4)

Competencies

4.1)

Granting of competency in this unit shall be made only after competency in the following unit(s) has/have been confirmed.

Where pre-requisite pathways have been identified. All competencies in the Common Unit Group must be have been completed plus all the competencies in one (1) of the identified Pathway Unit Group(s):

Common Unit Group

Unit Code

Unit Title

UEENEEE101A

Apply Occupational Health and Safety regulations, codes and practices in the workplace

UEENEEE102A

Fabricate, assemble and dismantle utilities industry components

UEENEEE104A

Solve problems in d.c. Circuits

UEENEEE105A

Fix and secure electrotechnology equipment

UEENEEE107A

Use drawings, diagrams, schedules, standards, codes and specifications

UEENEEE137A

Document and apply measures to control OHS risks associated with electrotechnology work

UEENEEG006A

Solve problems in single and three phase low voltage machines

UEENEEG033A

Solve problems in single and three phase low voltage electrical apparatus and circuits

UEENEEG063A

Arrange circuits, control and protection for general electrical installations

UEENEEG076A

Install and replace low voltage current transformer metering

UEENEEG101A

Solve problems in electromagnetic devices and related circuits

UEENEEG102A

Solve problems in electromagnetic devices and related circuits

UEENEEG103A

Install low voltage wiring and accessories

UEENEEG104A

Install appliances, switchgear and associated accessories for low voltage electrical installations

UEENEEG105A

Verify compliance and functionality of low voltage general electrical installations

UEENEEG106A

Terminate cables, cords and accessories for low voltage circuits

UEENEEG107A

Select wiring systems and cables for low voltage general electrical installations

UEENEEG108A

Trouble-shoot and repair faults in low voltage electrical apparatus and circuits

UEENEEG109A

Develop and connect electrical control circuits

UEENEEG171A

Install, set up and commission interval metering

UETTDREL11A

Apply sustainable energy and environmental procedures

UETTDREL16A

Working safely near live electrical apparatus

UETTDRTS37A

Perform current injection testing using phantom load

Literacy and numeracy skills

4.2)

Participants are best equipped to achieve this unit if they have reading, writing and numeracy skills indicated by the following scales. Description of each scale is given in Volume 2, Part 3 “Literacy and Numeracy”

Reading

5

Writing

5

Numeracy

5


Employability Skills

5)

The required outcomes described in this unit of competency contain applicable facets of Employability Skills. The Employability Skills Summary of the qualification in which this unit of competency is packaged will assist in identifying Employability Skill requirements.




Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

9) This provides essential advice for assessment of the unit of competency and must be read in conjunction with the Performance Criteria and the Range Statement of the unit of competency and the Training Package Assessment Guidelines.

The Evidence Guide forms an integral part of this Competency Standard Unit and shall be used in conjunction with all component parts of this unit and, performed in accordance with the Assessment Guidelines of this Training Package.

Overview of Assessment

9.1)

Longitudinal competency development approaches to assessment, such as Profiling, require data to be reliably gathered in a form that can be consistently interpreted over time. This approach is best utilised in Apprenticeship programs and reduces assessment intervention. It is the Industry’s preferred model for apprenticeships. However, where summative (or final) assessment is used it is to include the application of the competency in the normal work environment or, at a minimum, the application of the competency in a realistically simulated work environment. It is recognised that, in some circumstances, assessment in part or full can occur outside the workplace. However, it must be in accord with Industry and, Regulatory policy in this regard.

Methods chosen for a particular assessment will be influenced by various factors. These include the extent of the assessment, the most effective locations for the assessment activities to take place, access to physical resources, additional safety measures that may be required and the critical nature of the competencies being assessed.

The critical safety nature of working with electricity, electrical equipment, gas or any other hazardous substance/material carries risk in deeming a person competent. Hence, sources of evidence need to be ‘rich’ in nature so as to minimise error in judgment.

Activities associated with normal every day work have a bearing on the decision as to how much and how detailed the data gathered will contribute to its ‘richness’. Some skills are more critical to safety and operational requirements while the same skills may be more or less frequently practiced. These points are raised for the assessors to consider when choosing an assessment method and developing assessment instruments. Sample assessment instruments are included for Assessors in the Assessment Guidelines of this Training Package.

Critical aspects of evidence required to demonstrate competency in this unit

9.2)

Before the critical aspects of evidence are considered all prerequisites shall be met.

Evidence for competence in this unit shall be considered holistically. Each element and associated Performance Criteria shall be demonstrated on at least two occasions in accordance with the “Assessment Guidelines – UET12”. Evidence shall also comprise:

A representative body of Performance Criteria demonstrated within the timeframes typically expected of the discipline, work function and industrial environment. In particular this shall incorporate evidence that shows a candidate is able to:

Implement Occupational Health and Safety workplace procedures and practices including the use of risk control measures as specified in the Performance Criteria and range; and

Apply sustainable energy principles and practices as specified in the Performance Criteria and range; and

Demonstrate an understanding of the essential knowledge and associated skills as described in this unit to such an extent that the learner’s performance outcome is reported in accordance with the preferred approach; namely a percentile graded result, where required by the regulated environment; and

Demonstrate an appropriate level of employability skills; and

Conduct work observing the relevant Anti discrimination legislation, regulations, policies and workplace procedures; and

Demonstrated performance across a representative range of contexts from the prescribed items below:

Range of tools/equipment/materials/procedures/workplaces/other variables

Group No

The minimum number of items on which skill is to be demonstrated

Item List

A

Perform installation and replacement, on at least three (3) occasions, at least three (3) of the following:

High voltage metering schemes

High voltage zone substation metering schemes

High voltage bulk supply point metering schemes

Low voltage summation metering schemes

B

Perform, on at least three (3) occasions, the installation and replacement of the following:

High voltage current/voltage transformers (including return to service)

Energy meters

Associated equipment

C

Perform, on at least one (1) occasion, the following activity:

Installation or replacement of a typical High Voltage Bulk Supply Point metering scheme

D

Demonstrate, on at least one (1) occasion, the following:

Dealing with an unplanned event by drawing on essential knowledge and associated skills to provide appropriate solutions incorporated in the holistic assessment with the above listed items.

Context of and specific resources for assessment

9.3)

This unit should be assessed as it relates to normal work practice using procedures, information and resources typical of a workplace. This should include:

OHS policy and work procedures and instructions.

Suitable work environment, facilities, equipment and materials to undertake actual installation and replacement of high voltage metering and associated equipment.

Operational access to relevant plant, drawings, manufacture’s specifications/manuals and specialised testing equipment.

In addition to the resources listed above, in Context of and specific resources for assessment, evidence should show demonstrated competency working in realistic environment and a variety of conditions.

Method of assessment

9.4)

This Competency Standard Unit shall be assessed by methods given in Volume 1, Part 3 “Assessment Guidelines”.

Note:

Competent performance with inherent safe working practices is expected in the Transmission, Distribution and Rail Traction Industry. This requires that the specified essential knowledge and associated skills are assessed in a structured environment which is primarily intended for learning/assessment and incorporates all necessary equipment and facilities for learners to develop and demonstrate the essential knowledge and associated skills described in this unit.

Concurrent assessment and relationship with other units

9.5)

There are no concurrent assessment recommendations for this unit.


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assingnment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

8) Essential Knowledge and Associated Skills (EKAS): This describes the essential skills and knowledge and their level, required for this unit.

Evidence shall show that knowledge has been acquired of installation and replacement of high voltage metering and associated equipment.

All knowledge and skills detailed in this unit should be contextualised to current industry practices and technologies.

KS01-TTS38A HV metering and associated equipment used in a regulated energy market

Evidence shall show an understanding of the installation and replacement of high voltage metering and associated equipment in a regulated energy market to an extent indicated by the following aspects:

T1 Associated equipment may include: fuses, CT’s, VT’s, test block, ct chamber, marshalling kiosk, wiring, voltage fail relays, sealing equipment, terminals, links, modems, communications equipment, direct current supplies, aerials, optical isolation equipment, fibre optics, solid state recorders, pulse repeat relays, pulsing outputs, energy/distribution management systems, communication interface modules, alarms

T2 Selection of suitable equipment to meet site requirements and other requirements as prescribed by the Regulated Energy Market Rules

T3 Communicating as required with market participants, including Meter Data Provider, Responsible Person

T4 Meter storage, handling and disposal processes in accordance with enterprise policies and procedures

T5 Awareness of jurisdictional rules and requirements to allow work to be performed in Local Network Service Provider areas

T6 Standards, Codes, Commonwealth/State/Territory legislation, supply authority regulations and or enterprise requirements associated with the installation and replacement of high voltage metering and associated equipment procedures

T7 Use of enterprise and or manufacturers manuals, system diagrams/plans and drawings and other related documentation for the installation and replacement of high voltage metering and associated equipment

T8 Work in accordance with the enterprises’ safe systems of work

10) This relates to the unit of competency as a whole providing the range of contexts and conditions to which the Performance Criteria apply. It allows for different work environments and situations that will affect performance.

This Competency Standard Unit shall be demonstrated in relation to the installation and replacement of high voltage metering and associated equipment and may include the following:

High voltage metering schemes including; high voltage zone substations, bulk supply points and customers installations.

It may also include low voltage metering and summation current transformer metering.

Ensure that meter and associated equipment selected for the job will meet the requirements.

Installation may include the removal and return to service of high voltage current/voltage transformers, energy meters and associated equipment.

Replacement may occur in a variety of complex environments (bulk supply points, protection arrangements etc.) and contexts.

Associated equipment includes communications, metering voltage and current transformers, switching devices, fuses, links, meter boards, panels, recorders and power quality equipment.

Energy meters include electronic and induction disc meters.

The following constants and variables included in the element/Performance Criteria in this unit are fully described in the Definitions Section 1 of this volume and form an integral part of the Range Statement of this unit:

Appropriate and relevant persons (see Personnel)

Appropriate authorities

Appropriate work platform

Assessing risk

Assessment

Authorisation

Confined space

Diagnostic, testing and restoration

Documenting detail work events, record keeping and or storage of information

Drawings and specifications

Emergency

Environmental and sustainable energy procedures

Environmental legislation

Environmental management documentation

Established procedures

Fall prevention

Hazards

Identifying hazards

Inspect

Legislation

MSDS

Notification

OHS practices

OHS issues

Permits and/or permits to work

Personnel

Quality assurance systems

Requirements

Testing procedures

Work clearance systems

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
OHS practices/procedures and environmental and sustainable energy procedures, which may influence the installation and replacement of high voltage metering and associated equipment are reviewed and determined. 
Purpose of the installation and replacement of high voltage metering and associated equipment is established after data is analysed and expected outcomes of the work are confirmed with the appropriate personnel. 
Organisational established procedures, policies and specifications for the installation and replacement of high voltage metering and associated equipment are obtained or established with the appropriate personnel. 
Installation and replacement of high voltage metering and associated equipment procedures are discussed with/directed to the appropriate personnel in order to ascertain the project brief. 
Installation and replacement parameters are established from organisational established procedures, policies and specifications. 
Equipment/tools and personal protective equipment is selected based on specified Performance Criteria and established procedures. 
Work roles and tasks are allocated according to requirements and individuals’ competencies. 
Work is prioritised and sequenced for the most efficient/effective outcome, completed within an acceptable timeframe to a quality standard and in accordance with established procedures. 
Liaison and communication issues with other/authorised personnel, authorities, clients, customers are resolved and activities coordinated to carry out work. 
Risk control measures are identified, prioritised and evaluated against the work schedule. 
Relevant internal and external work permits are obtained to coordinate the performance of work according to requirements and/or established procedures. 
OHS and sustainable energy principles, functionality and practices to prevent accidents and minimise waste are incorporated into the project in accordance with requirements and/or established procedures. 
Installation and replacement of high voltage metering and associated equipment decisions are made on the basis of safety and effective outcomes according to requirements and/or established procedures. 
Technical advice is given regarding potential hazards, safety risks and control measures so that monitoring and preventative action can be undertaken and/or appropriate authorities consulted, where necessary, in accordance with requirements and established procedures. 
Essential knowledge and associated skills are applied to analyse specific data and compare it with compliance specifications to ensure completion of the project within an agreed timeframe according to requirements. 
Installation and replacement of high voltage metering and associated equipment is undertaken according to requirements and established procedures. 
Work teams/groups are arranged/coordinated/evaluated to ensure planned goals are met according to established procedures. 
Solutions to non-routine problems are identified and actioned, using essential knowledge and associated skills, according to requirements. 
Quality of work is monitored against personal performance agreement and/or established organisational and professional standards. 
Final inspections of the installation and replacement of high voltage metering and associated equipment are undertaken to ensure they comply with all requirements and include all specifications and documents needed to complete the project. 
Appropriate internal/external personnel are notified of completion and reports and/or completion documents are finalised/commissioned according to established procedures and timeframes. 
Reports and/or completion documents are submitted to relevant personnel/organisations for approval and, where applicable, statutory or regulatory approval. 
Approved copies of the installation and replacement of high voltage metering and associated equipment documents are issued and records are updated in accordance with established procedures. 

Forms

Assessment Cover Sheet

UETTDRTS38A - Install and replace high voltage metering and associated equipment
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

UETTDRTS38A - Install and replace high voltage metering and associated equipment

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name: