Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Prepare for drainage system installation activities
  2. Co-ordinate installation work
  3. Prepare the site for installation of drainage system
  4. Undertake installation of drainage system
  5. Complete installation of drainage system

Range Statement


Performance Evidence

The candidate must be assessed on their ability to integrate and apply the performance requirements of this unit in a workplace setting. Performance must be demonstrated consistently over time and in a suitable range of contexts.

The candidate must provide evidence that they can:

install drainage system works

interpret drainage system plans and drawings

interpret site specifications, soil types and drainage system plans

level and align earthworks

measure materials required to install drainage systems

prepare for installation activities

set out drainage system works

set out, survey, test and excavate the installation site

test the drainage system

use equipment, tools and machinery appropriate to the scope of works