Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Prepare for work
  2. Determine access to drainage system
  3. Carry out work
  4. Complete work

Range Statement


Performance Evidence

The candidate must be assessed on their ability to integrate and apply the performance requirements of this unit in a workplace setting. Performance must be demonstrated consistently over time and in a suitable range of contexts.

The candidate must provide evidence that they can:

complete a range of rectification works

identify a range of drainage system issues relevant to their industry, including surface and sub-surface issues

inspect the site to determine access to drainage system

plan and prepare for the work

test the system and clean up after rectifying the identified issues